Loading...
HomeMy WebLinkAbout20181190 Ver 1_CAMA Application_20180824ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM NORTH CAROLINA Environmental Quality TO: Mr. Anthony Scarbraugh DWR Water Quality Programs 943 Washington Regional Office 2090 FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 17 August 2018 SUBJECT: CAMA Application Review APPLICANT: .Timmy R. Stallings PROJECT LOCATION: SR 1732 at 646 Mordecai Lane in the Fisherman move residential subdivision adiacent Ashton Gut off North Creek near Bath in Beaufort County, North Carolina PROPOSED PROJECT: Applicant requesting to drive three piling for a third slip, a wetlsip with dimensions of 20' wide x 50'long. Please indicate below your position or viewpoint on the proposed project and return this form by 07 September 2018. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLYis office has no objection to the project as proposed. t�' This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office obiects to the proposed project for reasons described in the attached comments. Signed ` \ / Date �xxirr� c�a imn O.Annenl of FnW onmu�bl puylry North Carolina Department of F_nvironmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Jimmy R. Stallings 2. LOCATION OF PROJECT SITE: Project site is located off SR 1732 at 646 Mordecai Lane in the Fisherman Cove subdivision adjacent Ashton Gut off North Creek near Bath in Beaufort County, North Carolina. Photo Index - 2006:106-8507; H-2 2000:106-1303;J-17 1995:106-1129; G-18 Lat Long Coordinates - 35°26'07.37"N 76°40'23.11"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— 10 July 2018 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 13 August 2018 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Limited Transition (B) AEC(s) Involved: EW, PTA (D) Water Dependent: Yes (D) Intended Use: Private Residential (E) Wastewater Treatment: Existing - septic system Planned - N/A (F)Type of Structures: Existing - Single family residence with associated 2 -slip pier; 2 — open boatlifts Planned - 1 — 20' x 50' wet slip with three tie pilings (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: [AREA] DREDGED FTT.T.F.TI OTTTRR (A) Vegetated Wetlands (B) Open Water 1,000 ft" Ashton Gut (C) Other (Uplands) (D) Total Area Disturbed: 1,000 ft2 (0.02 acres) (E) Primary Nursery Area: Yes (F) Water Classification: C Sw NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to drive three tie pilings to create a 20' wide x 50' long wet slip. Jimmy Stallings Ashton Gut Bath Beaufort County Project Setting The 3 -acre project site is lot 1 in the Fisherman Cove residential subdivision located off SR 1732 at 646 Mordecia Lane adjacent Ashton Gut off North Creek near Bath in Beaufort County, North Carolina. Fisherman Cove is a wooded tract that has been subdivided recently. A modular home on pilings has just been constructed on the project site. CAMA/Dredge and Fill general permit no. 70612-B issued on 8 November 2017 authorized the construction of a bulkhead and a 6' x 100' pier with a 16' x 24' L -head platform, a 3' x 24' catwalk between 2- 13' x 13' open boatlifts. All authorized work has been completed in compliance with the permit. The lot has an elevation of t3' above the normal water level (NWL) and is vegetated with mature hardwood trees including loblolly pines, various oaks and sweet gum. The lot has 180' of shoreline. The highground adjacent the shoreline where the bulkhead was built is flanked by a high marsh vegetated primarily with black needlerush (Juncus roemerianus). The highground forms a point on the shoreline and is where the pier was constructed. Water depths in the location of the new pier range from 4' to 5' in the vicinity of the existing boatlifts. There was no submerged aquatic vegetation (SAV) observed in the nearshore of the project area, however DCM staff have observed its presence nearby. The bottom of Ashton Gut in the project area is best characterized as soft, dark and organic sediment. Ashton Gut is designated as a primary nursery area (PNA) by the Marine Fisheries Commission and C Sw NSW by the Environmental Management Commission and is closed to shelIfishing. Project Description The applicant is proposing to drive three pilings to create a third slip with the dimensions 20' wide x 50' long. The third slip will be a wet slip located on the north side of the pier. The pilings will offset from the pier to the north 20' and will be spaced 25' apart. The applicant is interested in purchasing a motor boat 36' to 40' long, with a beam of -+14' and a draft of +3.3'. This vessel will moor in the proposed wet slip Anticipated Impacts The project as proposed will increase the number of boat slips from 2 to 3 along with the associated impacts. Steve Trowell — Washington Regional Office - 6 August 2018 2 July 2018 Mr. Steve Trowel RECEIVED NC Division of Coastal Management .iUL 19 2613 943 Washington Square Mall Washington, North Carolina 27889 DCVI -WARES Dear Mr. Trowell: Enclosed is a Major CAMA permit application for the construction of a third wet - slip on my existing pier located at 646 Mordecia lane in Fisherman Cove adjacent to North Creek near Bath in Beaufort County, North Carolina. The dimensions, of the wet slip are 20'.wide by 5o' long. My plans are to purchase a 36' to 40' long boat. This vessel will draft about 3' 3" and has a beam of 14'. I purchased this property because of the water depths that will support the mooring of a vessel of this type. The water depths where my third wet slip is proposed range from minus 4.0' to 5.o' below the normal water level (NWL). Thank you for your assistance in completing the application package. Please feel free to contact me with any questions. Sincerely Jimmy Stallings ON MP -1 RECEIVE® APPLICATION for JUL 19 2018 Major Development Permit DCM-WARD (lasit revized 92/27/06) im North Carolina DIVISION OF COASTAL MANAGEMENT 7 RrimaryApplicant/Landownerinformafion Business Name Project Name (if applicable) 1. Applicant 1: irst Name MI Last Name 1 Applicant 2: -first Naml MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address 1 el /� PO Box CityState ZIP Country IA"I Phone No. X31 '/a xt. FAX No. - treet Address (if different from above) CityState ZIP Email ��}} �J� 1n Lam• id 2. o Ag n i!q Tractor lr►formatlon Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 Phone No. 2 ext. ext. FAX No. Contractor# Street Address (if different from above) City State ZIP Email <Form continues on back> 252.808-2808 :: 4-888-411COASY :: www.nccoastairionagement.net Form DCM MP -1 (Page 2 of 4) RECEIVE? JUL 19 2018 APPLICATION for Major Development Permit DCM-WARD., 3. Project,4,cack1o'n County (can be multiple) Street Address State Rd. # b. Size of entire tract (sq.ft.) f Su Ivision Name City State Zip . A<M 4 1 " � A NWL (normal water level) ' Phone No. Lot No.(s) (if many, attach additional page with list) - ext. J- a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project T/r'1 , CX_ -CG c. Is the water y identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ]Natural ❑Manmade ❑Unknown e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes '�No work fallls� 1 in. J" 1 " 4 Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) .. , Q c. Size of di idual lot(s) d. ApproAmate elevation of tract above NHW (normal high water) or NWL (normal water level) (lfmany lot sizes, please attach additional page with a list) 'h ❑NHW orPWL e. Vegetation on tract VrI n �J ��.���.� 47trc3 Ce945441 U G)e A4, -k F11,14 - It. Man-made features and uses now on tract J5}0Gt�`) L T/r'1 , CX_ : g. Identify and describe the existing land uses adlacent to the proposed project site. Rs ��� e 1 h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) 2)❑Yes �� [:]No sin j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes 1�8 K. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes Leo DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does It involve a ❑Yes j�o [INA National Register fisted or ellgibJe property? / v <Form continues on next page> 252.808-2808 .. 4-688-4RCOAST :: www.ncceastalmanagernent.net S*_ Form DCM MP -1 (Page 3 of 4) RECEIVED APPLICATION for JUL 19 2'J18 Major Development Permit F' m. (i) Are there wetlands on the site? '-` a Yes ❑No (ii) Are there coastal wetlands on the site? Ries ❑No (iii) If yes to either (1) or (ii) above, has a delineation been conducted? fS es [J -No (Attach documentation, lfavaitable) n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment syste s. 3 Activli/esar�d impacts a. Wilt the project be for commercial, public, or private use? ❑Commercial ❑Public/Government vate/Community b. Give a brief description of purpose, use, and daily gperations of the project when complete. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. d. List all development activities you propose. tv s 1 IT e. Are the proposed activities maintenance of an existing project, new work, or both? f. What is the approximate total disturbed land area resulting from the proposed project? q.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes�ljlo DNA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. '5C� FaC-C— iRQN�r i. Will wastewater or stormwater be discharged into a wetland? ❑Yes 2Ko [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA j. is there any mitigation proposed? []Yes pYo ❑NA If yes, attach a mitigation proposal. ?`' <Form continues on backs 252.808.2808 .- 9.888.41HICOAST www.nccoostatrnanagement,net Form DCM MP -1 (Page 4of4) RECEIVED APPLICATION for JUL 19 2018 Major Development Permit 6. Addltionahlilformation DCM6,VILARC laeddiUon to this completed app!lcabon form,. (W-1) the following items below, if. applipable, must be. su milted in.order for the appllcabon package to be gocOpfete. ltams (e).,- (tJ ate.always appAcable.'to eny'major development app licatlon..,Please consult ie epptrca400 .., JnsuuGflan booklet on how to properfy prepareahQ. required Ftems below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparlan) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to sub it comments on the proposed project to the Division of Coastal Management. Name 4'//Ai Phone No Name �— Phone No. Address Name hone No pp – g. A list of previou state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuingdateys. Of h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am, authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date '�yY� 1 Print Name Tt?proposed 6� Signature Please indicate application attachments pertaining to you project. pDCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts pDCM MP -3 Upland Development FCM MP -4 Structures Information 2552-808-2808 .- 1-888-4RCOA5T :: www.nccoastalmanagernent.net Form DCM MP -4 FC y.`,9® STRUCTURES a�$ (Construction within Public Trust Areas) ;'.` ARO Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. l. DOCKING FACILIT 'IMARINA CHARA. CTERIST/CS:' ❑Thls>secflon:.notappJicabJe a. (f) Is the docking facility/marina: b. (f) Will the facility be open to the general public? ❑Commercial ❑Public/Government Private/Community ❑Yes No c. (i) Dock(s) and/or pier(s) P)A- (ii) Number (Ili)Length (iv) Width (v) Floating []Yes [:]No e. (1) Are Platforms included? ❑Yes P o If yes: (if) Number (Iii) Length (iv) Width (v) Floating ❑Yes []No Note: Roofed areas are calculated from drlpline dimensions. g. ([)Number of slips proposed (umber of slips existing d. (1) Are Finger Piers included? ❑Yes'KNo If yes: (ii) Number (III) Length (iv) Width (v) Floating ❑Yes ❑No f. (i) Are Boatiifts included? []Yes XNo If yes: (if) Number (iii) Length (Iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies 14. Dockage ('beet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: I I. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and/or channel Wpen water; no dredging required []Other; please describe: I I k. Typical boat length: � qD m. (i) Will the facility have tie pilings? Yes ❑No (1LIf yes number of tie pilings? J. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types), 36) I. (f) Will the facility be open to the general public? ❑Yes TO 252-808-2808 :: 1.86 4RCOAST :: www.�scc�astairnanag_v_m�eat.E�ef revised: 12/27106 Farm DCM Mi P -K (Spructuro s, Page 3 ,of 4) n. Is the marinaldocking facility proposed within.or adjacent to any shellfish harvesting area? [)Yes ❑No o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aqu t c vegetation (SA , shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV OSB JUL 19 2)". S [:]WL []None DCM-WARD p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leassholder(s), and give the proximity to the lease. a. () Is the boathouse structure(s): ❑Commercial ❑PublldGovernment ❑Private/Comm unity (li) Number (iii) Length (iv) Width Note: Roofed areas are calculated from ddpllne dimensions. 4 GROIN: (e g, wood, sheQ)prle efc if a `rockgroin, usa MP Faccavation: and Fill") rs section no) applicable' a• (� Number (ii) Length (Iii) Width :& BREAKWATER, notapplicab/e :. B. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands e. Arc of the swing 7:. GENERAL 252-808-2808 -- 1.888-4RCOAST :: vvwsv.nccoastalsnanaaement.net revised: 12/27/06 s � ra9� jon S ��a dt-�t q`o RECEIVED JUL 19 2018 DCM-WARD x 3- 5, lth� ern 1 A vv f / RECEIVED JUL 19 2018 CCM -WARD �k 6A M i