HomeMy WebLinkAbout20181041 Ver 1_USACE Permit_20180828U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2017-02329 County: Alamance U.S.G.S. Quad: NC -Mebane
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Desco Holdings, LLC
Attn: Eric Dischinger
Address: 600 Market Street
Chapel Hill, NC 27516
Size (acres) 233.89 Nearest Town Mebane
Nearest Waterway Haw Creek River Basin Cape Fear
USGS RUC 03030002 Coordinates 36.049116 N, -79.293125 W
Location description: The pro*ect area is located between the eastern terminus of Rock Bridge Drive and the western terminus
of Burgess Drive, in Mebane, Alamance County, North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 114 linear feet
of stream channel (92 linear feet of which constitute a permanent loss of waters), and the temporary discharge of dredged or
fill material into 44 linear feet of stream channel necessary to construct access and infrastructure for Phase 1A of the
Cambridge Park residential subdivision.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 29. Residential Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 8/13/2018, and additional information provided 8/24/2018 via email, and the
enclosed plans Sheets 1 through 9. Any violation of the attached conditions or deviation from your submitted plans may subject
the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David E. Bailey at 919-554-4884 ext. 30 or David.E.Bailey2(a�usace.army.mil.
Digitally signed by BAILEY.DAVID.E.1379283736
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=USA, cn=BAILEY.DAVID.E.1379283736
Corps Regulatory Official: Date: 2018.08.2815:53:30-04'00' Date: 8/28/2018
Expiration Date of Verification: 03/18/2022
SAW -2017-02329
Determination of Jurisdiction:
A. ❑ There are waters including wetlands, on the above described project area that may be subject to Section 404 of the Clean
Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an
approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please
reference jurisdictional determination issued 06/01/2018. Action ID: SAW -2017-02329.
Digitally signed . BAILEY ent, o .=Doo, 83736
ou=PKI
DN: c=US, o=BAI Government, 792837, ou=PKI,
ou=USA, cn=BAILEY.DAVID.E.1379283736
Corps Regulatory Official: Date: 2018.08.2815:53:55 -04'00'
David E. Bailey
Date of JD: 06/01/2018 Expiration Date of JD: See previously issued JD
SAW -2017-02329
SPECIAL CONDITIONS
1. In order to compensate for impacts associated with this permit, mitigation shall be provided in
accordance with the provisions outlined on the most recent version of the attached Compensatory
Mitigation Responsibility Transfer Form. The requirements of this form, including any special
conditions listed on this form, are hereby incorporated as special conditions of this permit
authorization.
2. Impacts 2 and 6 as shown on the enclosed plans shall be installed through trenchless methods, and
thus no discharges of dredged of fill material are authorized into potential waters of the US for
these stream crossings.
3. Impacts 3, 4, and 5 as shown on the enclosed plans shall be restored such that stream banks are
re -graded to pre -construction conditions, matted with biodegradable fiber, and seeded/live staked
with native riparian species.
4. Please note that future impacts and/or phases of the Cambridge Park development project and
related activities associated with Corps Action ID: SAW -2017-02329 will be considered part of a
single and complete project; these impacts will be considered cumulative with impacts permitted
during earlier phases regarding compensatory mitigation and Nationwide Permit thresholds.
Current cumulative impacts to aquatic resources for this single and complete project include
permanent impacts to 114 linear feet (0.01 acre) of stream channel (92 linear feet of which are
considered a loss) and temporary impacts to 44 linear feet (0.005 acre) of stream channel. This
amounts to a total loss of potential waters of the US of 92 linear feet (0.01 acre).
Digitally signed by
BAILEY.DAVID.E.1379283736
=D
US, U.S.U.S. Government,
ou
ou=DoD, ou=PKI, —USA,
cn=BAI LEY.DAVID.E.1379283736
Date: 2018.08.2815:54:14 -04'00'
Corps Regulatory Official:
Expiration Date of Verification: 3/18/2022
Date: 8/28/2018
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at ham://co�smapu.usace.army.mil/cm apex/f?�=136:4:0//co�smapu.usace.gM.mil/cm apex/f?�=136:4:0.
Copy furnished:
Brad Luckey, Pilot Environmental, Inc. P.O. Box 128, Kemersville, NC 27285
Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105
Compensatory Mitigation Responsibility Transfer Form
Permittee: Desco Holdings, LLC (Attn: Eric Dischinger) Action ID: SAW -2017-02329
Project Name: Cambridge Park / Turner Road / Mebane / Alamance County / residential County: Alamance
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
92
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine
Riparian Non-Riverine Non -Riparian
Coastal
184
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site.
acceptance letter identifies a specific site, also list the specific site to be debited).
For NCDMS, list NCDMS. If the NCDMS
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming their willing and able to accept the applicants
compensatory mitigation responsibility, dated 7/17/2018 was included with the preconstruction notification.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1 j the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army. mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: David E. Bailey
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: David.E.Bailey2@usace.army.mil
Digitally signed by BAILEY.DAVID.E.1379283736
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=USA, cn=BAILEY.DAVID.E.1379283736
Date: 2018.08.28 15:54:40 -04'00' 8/28/2018
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil
PROPOSED
FORCE MAIN 91
i lv w— r __j
till PROPOSED SEWER
OUTFALL
FUTURE�� y
PHASE -NOT • ,� 4'�qi*_ I
DESIGNED ,t ' PROPOSED WET
DETENTION e r' %1IMI Y ASAP
w;r '
POND -ANTS
ire + �^+na, �Ii 1 � � � _ r �4 .�.. --- - - • 4op-
r 1 t
IMPAC1
IMPACT -5 �.
IMPACT -2
IMPACT -4 wk's li
`yam SEWER ti''
n §�•'� a iit
�y�..lw� .� rte" � •- � '
CONNECTION v�o-
IMPACT -3 _ : •z POINT FOR PHI A
R• f '� fel � � —
•, ij - �-s, 1 • -
a
. �� m°"a�-'"'� 71'x•—� _ �'!-,' - I� -�!,
HLTEr I OF
1
e
e�
—PROPOSED
Via$ WATERLINE
a�1
Z
�} IMPACT -I i
1 1
PROPOSED SEWER
OUTFALL i f f~ a w; OVERALL
CAMBRIDGE PARK -PHASE IA
_J { PROPOSED PUMP w STREAM IMPACTS
STATION u ` r MELVILLE TOWNS1uP•-ALAMANCE COUNTY
PROPOSED "
FORCE MAW 1�iTsBAldi 1dORTl1 CAROLINAtia {1 r
� `dh AUGUST 13. 2[lI A
FUTURE` a � ` ioa o mo ua wo
PHASES -CONCEPTUAL
L '
1
. 1609 Dundv Driw
Gme mbom,
1
ingNardi Cann17407
I n ineeri Isic. Fax 3es 1( HS4-yd75
1979— Phonc 336.854.8977
Enyi Su none Pere Flan liven a No C-dIU
__ — PST- y7y[H]-[N.�pPxN,HLs�xp�luANFA �bV7�1�s\G�aAivcE vA,�--'�FRMu iM�C*�YMc
-IONESDRIVG'7"•FI .7yry t y uvf , j i _
=6,546.43'rrwnAn—m YA"'.01 �w1�TAVLevr
- •I 'F- A.f I l �� �r .� �� .�
• `S29'50'2G"E
530'27'51" 51"530.05'11E 530'06'3fi"
5 4'45'F 1_
2q4.41'i' � 101.25 111.82'e 87' 249. 232.83'
C� r[nerrrraur
jr EF + 1� ,. n e � u +s• n
• rmens Nrn ,um WWI ruin ransz ,esisr
1 l S u� ]C! lil - u1 �.y� iq W W N Aoo[e.9e 1„—, oPoF
I' { � air f = .tne ar m tii�>rz • - ar.. vE a, , i� and r' , aH� se a,H ■ nMIK � w-ltirn`�lanf.
' � v- � a v v ['4Sn16 Y gYA �f �II«f rtt4
na�u - m aLss, rc aN,-saa
pfera - 1q ]16; nC af'.FW'r
11ARD ICKDRIVEil r TiP - - "� - -- v - emn w wY• lu,nerame w,u loe,•
Y, rfu rlgarl%mq 'dN[o 1i-r'r-m1�
2n`.�
HA
'1}' 1` 1 I i 11 ,� _ I i T `` �C•a�i. � �fi. Mr,i, pN. MH. NS”
a A }
r5 � y i �' '� aoP. r � r,. aracr Nw rr aiws aanrw, a�[ amn
`ID
rww^wrno-sa Nra.ur]ox rvP me N«.ae F:f ]n
j u < 1 a� �n�r wn rcruaunc wry*
t V"
F..r " Ac u.x nr na .nrk uY— ko
,�, a saa 1,� _ '• f' !g + ^ N Attnn f Aw ,a..�.Fw51xm er
, ide.1�]C,eN'Yr, 4FY-iA,.
IKGd IiNMR,C, ,ALYIaSliiN0. Lela- iLrfHi}NR OEY•MN•iN
4 _ I
C PH -
'll P _
/ +
A",
,
PKASF4 PLANS
D SAO MfiIANE I'ARTCIEkS, 11C
g---- �, c
N•
AND MUM PLAN
SMEAM-AMPACiS:
TEMP. STREAM IMPACT
PERM. STREAM IMPACT
BUFFER IMPACTS:
ZONE 1 IMPACT. 5580
ZONE 2 IMPACT: 3374
PIPE PUMP AROUND: 8 L
CULVERT & FILL: 92LF
KEYED—IN RIP RAP: 22LF
SHEET 3OF9
w D 20 40 w
S inch =40ft
[�Iti 4649 Dundas Drive(3v�
T Greensboro,
:giiieeringp Ii]G. 'Fax 3 6.854.8876 07
PLAN: 1"=40' —841re 1974— Fh ne 336.8S4A877
SECTION: HOR.-1'=40' I I.nginrcrs surv"m Planners PirmLiccomNa:"169
VERT_ '=4'
'uvH-r2n,wo wvecisasc
STREAM IMPACTS:
NONE — NO IMPACTS TO STREAM, SEWER WILL BE BORED
UNDER STREAM
BUFFER IMPACTS:
EXEMPT
SH=4OF9
STREAM 1M ACT: ,
NONE — F'ORCEMAiN WILL BE BORED, %0
TINDER THE STREAM
.` Al
... _ Z. . "�� ' . 140 -YR FLOOLS
T .
E
yAw CR
4t * ry `- , ,:.ft
IMPACT -2
CAMBRIDGE PARI{ - PRASE IA
MELVILL4 TOWNSHIP--ALAMANCE COUNTY
MEBANL—NORTH CAROLINA
AUGUST 13, 201 S
40 0 20 b eo
1 l ino11=-0[Ift.
mans 4604 Dundas Drive
E
o7
Gmmmbom,
N
E ngxneer><ng, Inc. Fax 33"54.8876
Phone 336-854-8871
1 Engineers Surveyors PLrnners Firm License No.-. Cd0168
ViNA"5o est%ruftNEA FXK-winMm iuw�
SHEECSOF4
If
I�5IMPACT:
SAND SAGS, #577 STONE de HOSE FOR
CULVERT PUMP AROUND (CHANNEL MUST
10' SEWER EASEMENT DE RESTORED TO EXISTING CONDITION
THRU BUFFERS � ' UPON COMPLETION)
100-YR0
FL00
I—
o 30' TEMP.
CONSTRUCTON I' ' I ZONE 2 b — —
EASEMENT THRll—
BUFFERS f
ZONE 1
��� ��• ' � f� r � ZONE 1—
�' 30PERM. SEWER EASEMENT J ZONE
10" SEWER
[$5 C55
C55 '
��
STREAM IMPACTS:
TEMP. STREAM IMPACT FOR PIPE PUMP AROUND: 8 LF
TEMP. STREAM IMPACT FOR PIPE: 4 LF
DUFFER IMPACTS:
EXEMPT
IMPACT -3
CAMBRIDGE PARK - PHASE 1A
STREAM IMPAC'T'S
MEL.VTI I C TOWNSFUP—ALAMANCE COUNTY
MEHANII--NORTH CAROLINA
AUGUST 13. 2019
as c 20 as an
i incl, =44r1.
_ _E pans 4609 Dundas Ddw
Creenslwm.
$ ngineering,Inc Pax 33f•88554887607
I
— Sincr X974— Fh me 336.85+86T7
1 Engineers Surveyors Planners Firm uccasc Nv.: C0168
SHEVI.60F14
. . .
CONSTRUCTION Ls�
EASEMENT THRU
. BUFFERS z
100, YR FLOOD
Q
\yECT,D
10' SEWER EASEMENT',' ,% j�'
THRU BUFFERS f L� : 2 6 ` �Sl-
. -
`
_ ..
' �ER EpSE��V�AND
BAGSX57 STONE & HOSE F�30 i� rULVERT PUMP AROUND (CHANNEL MUtT \ '
y �R BE RESTORED TO EXISTING CONDITION
450 10 ` r UPON COMPLETION) \ 1
5TREAM IMPACT5:
TEMP. STREAM IMPACT FOR PIPE PUMP AROUND: S LF
TEMP. STREAM MPACT FOR PIPE: 4 LF
SUFFER IMPACTS-.
EXEMPT
IMPACT -4
CAMBRIDGE PARK - PHASE 1 A
STREAM IMPACTS
MELVILLE TOWNSHIP-ALAMANCE COUNTY
MEBANE-NORTH CAROLINA
AUGUST 13, 2018
40 o Q6 w tl0
1 11101 =40F
i
E Vans
4609 llunda OrWc
E ngineering, Inc.
F 336854.88?607
---Si-197; —
Phone 336-354.8677
Enpjneen Sw -yom Phnnem
Firm 7.ieeme No.: C-0166
�own�nres�arsco�nmxEx vrcS\uwemocr vNx-� w�
SlrEET 7 OF 4
.. .... �558
30' 1 TEMP. J 't
. CONSTRUCTION 1
EASEMENT THRU TEMP, STREAM IMPAC]:_
E BUFFERS SAND BAGS, #57 STONE & HOSE FOR
100—YR FLOOD �' � CULVERT PUMP AROUND (CHANNEL MUST
BE RESTORED TO EXISTING CONDITION
�',`= , UPON COMPLETION)
10' SEWER EASEMENT ~ y�'_ �DNE 2
_ THRU 1311FFER5
SES ;pt.4oQ
6yER 8.,
fgSE��N� _ ScR 10Nf.2
QEEAM IMPACTS:
TEMP. STREAM IMPACT FOR PIPE PUMP AROUND: 8 LF
TEMP. STREAM IMPACT FOR PIPE: 4 LF
1Jfi�t1.1,
IMPACT -5
CAMBRIDGE PARK -PHASE 1 A
STREAM IMPACTS
MEIN ILLS TO W N S H W—ALAMAN CE COUNTY
M13BANE--NORTH CAROLINA
AUGUST 13, 2018
40 a 90 ao So
1 inch =407t.
Evans 9609 D ndn Drive
7 G co,
]� h Carol4m 27407
ngineering, Ing. Fa 336.814-8876
—Since 1979— Phone 336-859-8877
I Engine Surveyors Planrun Flmi Ucenae Nn ; 0-0166
A'O STREAM IMPACT:
A NONE — WATERLINE WILL BE BORED
rte\ UNDER THE STREAM
�r .10,
'100—YR FLOOD
STREAM IMPACTS.-
NONE:
MPACTS:NONE: WATERLINE WILL BE BORED UNDER STREAM
BUFFER IMPACTS:
EXEMPT
SHEET' 8 OF 9
Il4iPACT'-6
CAM -BRIDGE PARK - PHASE IA
STREAM IMPACTS
MELVIT I.PTOWNSIiIP—ALAMANCECOUNTY
MEBANErNORTH CAROLINA
AUGUST 13, 2019
40 G 20 w m
� Inch =anr�
E moans
4W9 nundw Dr;w
Grces,sbom,
_
E+ ngineering,Inc.NFm33"544-887607
I
----. ftl- 1974-1'hm,c
336.854.9877
I Fnglnecrs Svry yom Planner
Pian Mccnee Nu.t C-0368
,m+o�uu�nrws�cwerooce rwN-wenum irvicrsawc �
�1 1! I 1 11-PPR-O-P�OSEDDPUM^P'�
PIPE i SHG�[7'I' 9 OF 9
_PRO°OSFo
(Ty )
-r
pANp B 11 ��'
PRi1PC�3i] DIMMANCE LMRS
(T FiTRCE
(TTP) PLAN
r r
MIR. MRI- TROR
T6 LOP OF PWIp
WMR RANK
91RFJ6�
utu
Eft. x
STONE DIAL
REM
THROYF EMDUGH NOT
PUM$9 TO ALLOW FLOW FAC WF (41 MORE FABRIC ON
TWROUPi 1W1EN HOi Pl1TIPIRG ARo11NO- FALL (11 ML MICA)
SEC 0 K A -A
TEMPORARY "PIPE CROSSING — PUMP AROUND"
FOR PIPE INSTALLATION
NOTES
UEROSION STGP UNLESSNE TO BE 'CLASS I" RP -RAP UNLESS )E�IASEO DIFFERENTLY ON
57RVCT ON PUN.
x1 PVMP AND UNE $FIE TO BE VE ISIR INEU BY THE CONSRACTOF V51NC THE BASE rlOW
DAN ON THE cONSTRUC710N PLANS
d) MATERIAL SPECIFICATIONS
SANDBAGS SANDBAGS SHALL CONHST OF MATER14" WHO ARE RESISTANT TO
ULTRAVIOLET RADIATION. TEARING AND PUNCTURFy AND WOVEN TIGHTLY "OUCH TD
FILL PREVENT LEAKAGE OF L MATERIAL (I a. SAND, ERNE GRAVEL, ETC.)
CONSTRUCTION SEOUENCF F 3 PJPF C RQSSlNr :PQMP AROUND
I] INSTALL PVMP AND LINE TO PUMP FLOW FROM AREA UPSTREAMOF TEMPORARY
STREAM CROSSING TO AREA DOWNSTREAM OF CORSTRVCTIGN AREA. BM PUMPING AND
CGIITFNUINO PUMPING WHILE WORKING WITHIN THE STREAM,
2] INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FILTER FABRIC TO PREVENT
BACKFLOW RTO CONSTRUDTwN AREA.
DETAIL SHM
CAMBIUDGE PARK — PHASE 1 A
STREAM IMPACTS
MSLVII.LE TOWNSfUP--AL.AMANCE COUNTY
MEBANE-NORTH CAROLINA
AUGUST I1, 20 P1
40 O 20 49 W
WSTAL PROPOSED SILT FENCE ALONG TOP OF aARR EACK SDE OF THE
TRI1C11ON AREA.
4= CONSTRUCTION COAPLETION. REMOVE TEMPDRARY DAMS. FILTER FA9MC-
D 55 TEMPORARY DAM BOTTOMS INTO STREAM BEG UNTIL TDP OF RIP RAP IS LEVEL
I I mah=TOfI,
1ITH STREAM BOTTOM -
SJ UPON STABUZATION OF CLEARED AREAS, REAROLE TEMPCIq ANY EARTH BERM. SEDIMENT
TRAP, AND DEWATERNG BASIN,
4fi09 Ih,ndnA iitiVi
E Vin$
GE sl—p
En neering1 Inc.
27407
- 876
oma 1974—
Plmise 336854-8877
4 13ngineees su"Ofs PLw m
Firm Ul a No.: G0168
PAR[-WETWRD wPACTS I
Action ID Number: SAW -2017-02329 County: Alamance
Permittee: Desco Holdings, LLC (Attn: Eric Dischinger)
Project Name: Cambridge Park / Turner Road / Mebane / Alamance County / residential
Date Verification Issued: 8/28/2018
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2 @usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date