HomeMy WebLinkAboutSW3171201_Plansheet - Set_20180827 Sand Filter Maintenance Tasks and Schedule TASK SCHEDULE Street sweep parking lot Quarterly Trash removal Monthly Inspect outlet for obstructions Monthly Inspect for clogging Monthly Inspect inlet grates Monthly Skim sand media Yearly Pump oil and grit from sedimentation chamber Yearly or at 50% full Replace sand media As needed (expect 3 years) BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage (ft) (sf) (cf) (cf) 720.5 Bottom of Stone 721.5 Top of Stone/Bottom of Sand 724.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 724.0 3,600 00Bottom of Pond 726.0 5,600 9,200 9,200 728.0 7,800 13,400 22,600 730.0 10,300 18,100 40,700 Top of Embankment SHWTE and groundwater @ 708.71' per Summit Geo Report letter dated 11-14-17 BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage (ft) (sf) (cf) (cf) 724.5 Bottom of Stone 725.5 Top of Stone/Bottom of Sand 728.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 728.0 5,300 00Bottom of Pond 730.0 13,500 18,800 18,800 732.0 17,100 30,600 49,400 734.0 20,900 38,000 87,400 Top of Embankment SHWTE and groundwater @ 719.73' per Summit Geo Report letter dated 11-14-17 BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage (ft) (sf) (cf) (cf) 729.5 Bottom of Stone - Provide liner per geo recommendation 730.5 Top of Stone/Bottom of Sand 733.0 Top of Sand Filter/ Bottom of Extended Dry Detention Pond 733.0 6,700 00Bottom of Pond 734.0 7,800 7,250 7,250 736.0 10,100 17,900 25,150 737.5 12,000 16,575 41,725 Top of Embankment SHWTE and groundwater @ 733.86' per Summit Geo Report letter dated 11-14-17 No Anchor Block Required No Anchor Block RequiredNo Anchor Block Required Wet Pond Maintenance Tasks and Schedule TASK SCHEDULE Forebay inspection and cleanout Monthly inspection. Remove sediment every 7 years or whenever the sediment volume exceeds 50% of storage volume Volume measurement Yearly – Dredging needed every 20 years or when 25% of permanent pool volume has been lost Bank mowing and inspection / stabilization of eroded areas Monthly Outlet / inlet inspection and cleanout Monthly Unwanted vegetation and trash removal Monthly Visual inspection of water quality Monthly Inspect / exercise all mechanical devices, valves, etc Yearly Inspect for structural damage, leaks, etc Yearly Rodent management As needed Security As needed BMP Pond Storage Volume Provided: Stage Surface Area Incremental Storage Total Storage (ft) (sf) (cf) (cf) Notes 716.0 2,000 0 0 Bottom of Pond 718.0 11,300 13,300 13,300 720.0 13,200 24,500 37,800 722.0 15,200 28,400 66,200 722.5 (Perm. W.S.) 18,000 8,300 74,500 Top of Perm. Pool 722.5 (Perm. W.S.) 18,000 0 0 Bottom of Temp. Pool 723.0 21,400 9,850 9,850 724.0 23,500 22,450 32,300 724.5 24,600 12,025 44,325 726.0 27,900 39,375 83,700 728.0 32,400 60,300 144,000 729.0 34,800 33,600 177,600 729.5 36,200 17,750 195,350 Top of Embankment SHWTE and groundwater @ 722.28' per Summit Geo Report letter dated 11-14-17 BMP Storage Volume Provided: Elevation Surface Area Storage Total Storage (ft) (sf) (cf) (cf) 753.0 50 00Bottom of Pond 754.0 5,000 2,525 2,525 756.0 7,000 12,000 14,525 758.0 23,100 30,100 44,625 760.0 58,300 81,400 126,025 Top of Embankment No Anchor Block Required No Anchor Block Required