Loading...
HomeMy WebLinkAbout20061962 Ver 1_Certification of Completion_20090610dlee-V d, WQX" fln NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary D WQ Project No.: U O ( - 9 G , County: Q A o L.3 c- vt Applicant: I ) om ws 1, a , ?! h J . JUN 1 0 20`9 Project Name: Taos Date of Issuance of 401 Water Quality Certification: Feb- 9 , Z J o 7 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ( or2?s F, A, A J t- hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting m ills. ?f Signature: Date: ?1w•?? 2 ew Agent's Certification I, hereby state that, to the best of my abilities, due dau 190M LE was used in the observation of the construction such that the construction was observed to be built I compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved pland specifications, and other supporting materials. JUN j 5 2009 Signature: Date: If this project was designed by a Certified Professional oft -MNUERfluAU1'M ME1lJ1ig6NOS?? 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Phone: 252-946-6481 1 FAX: 252-946-9215 Internet: www.ncwaterquality.orq An Equal Opportunity 1 Affirmative Action Employer North Carohna Naturally Thomas F Austin Jr 220 Heritage Point Drive Edenton, NC 27932 NC DENR Washington Regional Office DWQ Surface Water Protection 943 Washington Square Mall Washington, NC 27889 June 9, 2009 JUN 1 0 20G9 Dear Mr. Scarbraugh, I spoke with Mr. Hodge today, and he suggested I forward the enclosed certificate of completion to you. I appreciate your sending it to me, as I had misplaced the one I was sent with the original waiver. If you have any questions about the way I filled out the form please feel free to give me a call. My phone number is: 252-482-4041. Sincerely, Thomas F Austin Jr