Loading...
HomeMy WebLinkAbout20190397_Site visit - August 21 2018_20180813Wanucha, Dave From: Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil> Sent: Monday, August 13, 2018 8:20 AM To: Adima, Nathan N; Wanucha, Dave; Chambers, Marla J; Buncick, Marella; 'militscher.chris@epamail.epa.gov'; Beaver, Brian T; Dagnino, Carla S; Paschal, Keith; Bob May; David Petty; Cochran, Cameron; Lipscomb, Brian S; Dilday, Jason L; Lee, Craig J; Cox, Marissa R; Beaver, G Trent; Slaughter, Johnathan H Cc: Zerman, William S; Robinson, Beverly G Subject: [External] RE: [Non-DoD Source] RE: R-2566BA Watauga River Bridge Replacement , Division 11; County: Watauga - Site visit - August 21, 2018 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Nathan, I am unable to join for a meeting that entire week, but suggest the meeting go ahead without me due to the importance of the timing for everyone. I can be caught up on the results afterwards. Let me know if you have any additional thoughts/concerns. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. -----Original Message----- From: Adima, Nathan N [mailto:nadima@ncdot.gov] Sent: Wednesday, August 8, 2018 2:55 PM To: Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chambers, Marla J<marla.chambers@ncwildlife.org>; Buncick, Marella <marella_buncick@fws.gov>; 'militscher.chris@epamail.epa.gov' <militscher.chris@epamail.epa.gov>; Beaver, Brian T <btbeaver@ncdot.gov>; Dagnino, Carla S<cdagnino@ncdot.gov>; Paschal, Keith <kpaschal@ncdot.gov>; Bob May <BMay@wetherilleng.com>; David Petty <dpetty@tgsengineers.com>; Cochran, Cameron <acochran@ncdot.gov>; Lipscomb, Brian S<blipscomb@ncdot.gov>; Dilday, Jason L<jldilday@ncdot.gov>; Lee, Craig J<cjlee@ncdot.gov>; Cox, Marissa R <mrcox@ncdot.gov>; Beaver, G Trent <tbeaver@ncdot.gov>; Slaughter, Johnathan H<hslaughter@ncdot.gov> Cc: Zerman, William S<bzerman@ncdot.gov>; Robinson, Beverly G<brobinson@ncdot.gov> Subject: [Non-DoD Source] RE: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018 � After a reconsideration of the travel time from Raleigh area to Boone (about 4 hrs.), it seems better to schedule the site visit in the morning of Wednesday, August 22, 2018. In that way it will be cooler for the site visit, the CFI will be in the afternoon and the convenience of those traveling from Raleigh area to travel the night before. Please let me know your thoughts. Thanks Nathan N. Adima, PE Project Manager Project Management Unit - Divisions 11-14 North Carolina Department of Transportation 919 707 6210 office 919 707 6200 main nadima@ncdot.gov <mailto:nadima@ncdot.gov> 1000 Birch Ridge Drive Raleigh, NC 27610 1582 Mail Service Center Raleigh, NC 2699-1582 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Adima, Nathan N Sent: Wednesday, August 08, 2018 12:38 PM To: Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>; Buncick, Marella <marella_buncick@fws.gov>; militscher.chris@epamail.epa.gov; Beaver, Brian T<btbeaver@ncdot.gov>; 'hslaughter@ncdot.go' <hslaughter@ncdot.go>; Carla S Dagnino (cdagnino@ncdot.gov) <cdagnino@ncdot.gov>; Keith Paschal (kpaschal@ncdot.gov) <kpaschal@ncdot.gov>;'Bob May' <BMay@wetherilleng.com>; 'David Petty' <dpetty@tgsengineers.com>; Cochran, Cameron <acochran@ncdot.gov>; Lipscomb, Brian S <blipscomb@ncdot.gov>; Jason L Dilday (jldilday@ncdot.gov) <jldilday@ncdot.gov>; Craig J Lee (cjlee@ncdot.gov) <cjlee@ncdot.gov>; Cox, Marissa R<mrcox@ncdot.gov>; G Trent Beaver (tbeaver@ncdot.gov) <tbeaver@ncdot.gov> Cc: William S Zerman (bzerman@ncdot.gov) <bzerman@ncdot.gov>; Beverly G Robinson (brobinson@ncdot.gov) <brobinson@ncdot.gov> Subject: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018 a� During our meeting today on the above referenced project, the Agencies reiterated their interest in visiting the site of the proposed bridge section of this project- R-2566BA. We are tentatively scheduling the site visit on Tuesday August 21, 2018 in the morning (the exact time will consider travel time to Boone and prevalent hot temperature in the afternoon). The Combined Field Inspection of this project is also scheduled for August 22, 2018. The site visit will precede the Combined Field Inspection to allow a discussion in the CFI meeting of the comments from the Agencies' site visit. Due to challenges of site parking, I am arranging for Car/Van pool from the NCDOT County Maintenance Yard located at 1829 NC-194, Boone, NC 28609. Both the NCDOT District Office and the County Maintenance Yard are 8 miles or 15 minutes' drive from the bridge site. Please let me know if you have any comments or concerns about the date and time by end of business tomorrow, August 9, 2018, so that I can send out the final site visit invite. Thanks Nathan N. Adima, PE Project Manager Project Management Unit - Divisions 11-14 North Carolina Department of Transportation 919 707 6210 office 919 707 6200 main nadima@ncdot.gov <mailto:nadima@ncdot.gov> 1000 Birch Ridge Drive Raleigh, NC 27610 1582 Mail Service Center Raleigh, NC 2699-1582 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.