HomeMy WebLinkAbout20180007 Ver 1_Erosion Control Modification at 3804 East Wetland_20180820Wanucha, Dave
From: Euliss, Amy
Sent: Monday, August 20, 2018 3:02 PM
To: Wanucha, Dave
Cc: Suggs, Phillip H; Seitz, Phillip K; Clodfelter, David J; Fine, Lowell C
Subject: FW: [External] Fwd: Erosion Control Modification at 3804 East/Wetland
Attachments: 3804 East Plan Sheet_rev.pdf
. «� : ; �� ��' ' '
. .� � . . � � � �� ,� . � . �� «
I hav� dir�ct�d th�m to r�mov� any accumulat�d s�dim�nts and sit�s 28 and 36, and r�mov� any accumulat�d s�dim�nts that
ar� �asy to acc�ss at p�rmit sit� 8.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss .ncdot.qov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
From: Clodfelter, David J
Sent: Monday, August 20, 2018 2:22 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Suggs, Phillip H<psuggs@ncdot.gov>; Fine, Lowell C<Icfine@ncdot.gov>; Seitz, Phillip K<kseitz@ncdot.gov>;
jeff.leach@kisingercampo.com
Subject: FW: [External] Fwd: Erosion Control Modification at 3804 East/Wetland
Amy,
Sunday we had about 2" of rain fall on the project. Site 8(wetlands 3804) had approximately 4-5 cy of silt loss, Site 36 (Y-30
behind the office) had approximately 3-4 cy, and Site 28 ( Y-19 ramp C) had approximately 1 cy. I have attached a picture of site
8. I have also attached a revised plan sheet showing a new basin Lane plans to install. Lane has all crews working on erosion
control today. Please let me know your thoughts on the permit sites.
Thanks,
Jeremy
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,