Loading...
HomeMy WebLinkAbout19931059 Ver 1_Approval Letter_20090616North Carolina Beverly Eaves Perdue Governor OEM Department of Environment and Natural Division of Water Quality Coleen H. Sullins Director Resources Dee Freeman Secretary June 16, 2009 DWQ# 93-1059 v2 correction Guilford County Mr. Robert Penton Larco, Inc. PO Box 16279 Winston-Salem, NC 27115 APPROVAL of 401 Water Quality Certification with Additional Conditions and MAJOR VARIANCE APPROVAL per the Randleman River Riparian Area Protection Rule [15A NCAC 2B.02501 w/ ADDITIONAL CONDITIONS Dear Mr. Portion: You have our approval, in accordance with the attached conditions, to place permanent fill in 149 linear feet of intermittent stream and 8,940 square feet of Zone 1 and 5,960 square feet of Zone 2 of the protected Randleman Riparian Buffer in order construct additional driveway and safety area associated with the Larco Inc. expansion plant in High Point, NC in Guilford County, as described in your application received by the Division of Water Quality (Division) on December 4, 2007, additional information since provided and as described in your Major Variance Request presented to the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on May 7, 2008, additional information submitted on October 16, 2008, November 4, 2008, March 23, 2009, and April 15, 2009. This letter shall also act as your Major Variance approval as decided by the WQC on March 7, 2008 and described within 15A NCAC 2B .0250. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Numbers 3705 and 3689, which can be viewed on our web site at http://www.ncwaterguality.orp/wetlands.htrnl. These Certifications allow you to use Nationwide Permit Numbers 39 and 27 when they are issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application and in your Major Variance Request. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: North Carolina Division of Water Quality, Winston-Salem Regional office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771 46301 Customer Service: 1-8778236748 Internet www.ncwaterquality.org NorthCarolina Naturally An Equal Opportunity 1 Affirma8ve Action Employer Larco Inc DWQ# 93-1059 v2 correction June 16, 2009 Page 2 of 4 The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Amount Approved (Units) Stream 149 (feet) Zone 1 Buffers 8,940 (square ft.) Zone 2 Buffers 5,960 (square ft.) 2. Buffer Mitigation: You are required to mitigate for impacts to the protected riparian buffers. You are required to mitigate for impacts to the protected riparian buffers. The DWQ has determined that you may satisfy this mitigation requirement through on-site stream and buffer restoration as proposed in your mitigation plan dated October 15, 2008. 3. The Permittee shall conduct a pre-construction meeting between the designer, the project manager, the contractor, and any other essential parties, prior to commencing the mitigation work approved by this certification. Specific details and conditions of this approval shall be discussed at the pre-construction meeting. 4. Monitoring of the mitigation area must be conducted in accordance with Monitoring Level I of the Stream Mitigation Guidelines found at: http: //www. saw. usace.army.mil/ W ETLANDS/Mitigation/Documents/Stream/STREAM%20MITIGATION%2OG UIDELINE%20TEXT.ndf. 5. Deed restrictions or similar mechanisms shall be placed on all remaining jurisdictional streams, wetlands and protected buffers as well as the restoration area in order to prevent future impacts. These mechanisms shall be put in place prior to impacting any buffers approved for impact under this Authorization Certificate. Documentation of these protection mechanisms must be submitted to the Division for final approval prior to impacting any buffers approved by this Authorization. 6. The final, written stormwater management plans as submitted to and approved by the Division on April 15, 2009 must be implemented and the stormwater management facilities shall be constructed and operational by completion of the impacts approved by this authorization. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 7. All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0250. 8. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the §401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCDWQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Laren Inc DWQ# 93-1059 v2 correction June 16, 2009 Page 3 of 4 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@ncmail.net. Coleen H. Sullins Enclosures: Certificate of Completion GC 3705 cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Lisa Meadows, DMP, 6415 Old Plank Rd, High Point, NC 27265 Amy Chapman, DWQ - 401 Buffer Files DWQ Winston-Salem Regional Office DWQ Wetlands/401 Larco Inc DWQ# 93-1059 v2 correction June 16, 2009 Page 4 of 4 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full rime) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date