HomeMy WebLinkAboutNC0024112_Compliance Evaluation Inspection_20180814 � `) \ 4%Y:if!' ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary LINDA CULPEPPER Interim Director August 14, 2018 RECEii/ DEWR AUGED/ 2 2018NR1D Kelly Craver City of Thomasville Water Resources PO Box 368 Permitting Section Thomasville, NC 27361-0368 SUBJECT: Compliance Evaluation Inspection Report Hamby Creek WWTP NPDES Permit No. NC0024112 Davidson County Dear Mr. Craver: On July 31, 2018, Paul DiMatteo of this office met with Allen Beck, operator in responsible charge (ORC), and Misty Conder, backup ORC, to perform a Compliance Evaluation Inspection on the subject wastewater treatment facility. This type of inspection consists of two basic parts: an in-office file review and an on-site inspection of the treatment facility. The attached inspection form notes the areas that were evaluated for this inspection. The findings and observations are outlined as follows. I. Permit The permit became effective on October 1, 2014 and will expire on April 30, 2019. The operators were reminded to submit a renewal application at least 180 days before expiration (November 1, 2018). A copy of the current permit was available during the inspection. The facility was as described in the permit. II. Self-Monitoring Program A review of discharge monitoring reports (DMRs) from July 2016 through June 2018 showed the following actioned violation, which was addressed through previous correspondence from this office: PARAMETER VIOLATIONDATE VIOLATION TYPE VIOLATION ACTION Phosphorus 3/31/2017 Seasonal Maximum Proceed to NOV Seasonal Load Exceeded Sampling is being conducted at the location and frequency specified by the permit. Both influent and effluent samplers are set for flow proportional compositing using ISCO 5800 composite samplers. The 1)...E Q74) NORTH arnto frq DAnent of Environmental Omllby North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103 336.776.9800 Hamby Creek WWTP, 7/31/2018 influent sampler was set to take 120 milliliters (ml) every 100 pulses, and the effluent sampler was set to take 100 ml every 25 pulses. An aliquot pulled at the effluent measured 160 ml. Ms. Conder said she did not know how many gallons constituted one pulse at either the influent or effluent. The volume of each pulse should be determined as it will allow for sampler adjustment in case of anticipated varying flow rates. The facility measures BOD, fecal coliforms, pH, conductivity, temperature, DO, chlorine, phosphorus, ammonia and total suspended solids at the on-site laboratory under certification # 92. Other analysis is performed by Meritech, Inc. under certification # 165. A review of field parameter calibration records and procedures appeared acceptable. A thermometer on the fecal incubator read 44.5°C. Ill. Records/Reports Copies of DMRs, operator visitation logs, daily operation sheets, maintenance reports, lab reports and chain-of-custody forms were available for review during the inspection. DMRs and lab data are maintained according to the permit. DMRs include all permit parameters.A comparison of submitted data with bench sheets revealed no errors or concerns. IV. Flow Measurement Influent flow is measured using an ultrasonic sensor over a 2-foot Parshall flume and recorded using SCADA. Effluent flow is measured using an ultrasonic sensor over a rectangular weir. Flow is reported from the influent meter. Records appeared to indicate that the electronic sensors were calibrated on April 5, 2018 by Instrument Services, Inc. During the inspection it was noted that the influent meter's ultrasonic device was placed just behind the Parshall flume's converging section. Please note that Part II, Section D.3 of the Permit requires that "flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharge. The devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device." Accepted scientific practices for Parshall flumes dictate that flow be calculated using the head measured at a specific point 2/3 up the converging section's sidewall from the throat, and not behind the flume's converging section. In order to verify the accuracy of flow data submitted using the influent flow meter, please provide discharge tables and/or formulas for your flume that are based on the specific point measured, and provide calibration records that indicate that the ultrasonic sensor and flow totalizer were set to perform calculations based on these formulas (i.e., that they were not set to perform calculations based on typical Parshall flume discharge tables and formulas). V. Operations and Maintenance The plant is operated as required. All operators are properly designated and hold adequate certifications. The facility appeared to be well operated and managed. Page 2 of 3 • Hamby Creek WWTP, 7/31/2018 VI. Facility Site Review Mr. Beck reported that the Cannibal solids reduction system caused problems with phosphorus reduction and did not work as advertised, so the operators have taken it offline permanently. All other components appeared to be operating properly. Three ultraviolet disinfection trains are available; Mr. Beck said that each train can treat flows as high as 5 million gallons per day (mgd), and one full set of backup bulbs was available. Finished water appeared clear. VII. Effluent/Receiving Waters Treated effluent is discharged to Hamby Creek, class C waters in the Yadkin-Pee Dee River Basin. Effluent after disinfection appeared clear. The outfall was not observed during the inspection due to wet conditions, time constraints and access issues. Mr. Beck reported that they have not been able to access the discharge point for many years because Interstate 85 blocks access to their easement and they have not been able to resolve this issue with the NC Department of Transportation. Please note that the outfall line's easement should be cleared such that the outfall is accessible for inspection and in case of need for emergency maintenance. VIII. Sludge Handling/Disposal All sludge is dewatered and hauled to a landfill as needed. IX. Conclusions and Requested Action Please provide the information requested under Section IV. Flow Measurement within 30 days of receipt of this report. Alternatively, you may provide a plan to relocate the flow meter's ultrasonic device and request reinspection after the relocation. The compliance evaluation inspection is satisfactory. The facility is operated and maintained in an excellent manner. If you have any questions regarding the inspection or this report, please contact Paul DiMatteo at (336) 776-9691 or me at (336) 776-9800. Sincerely, Sherri V. Knight, P.E. Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: BIMS EPA Water Compliance Inspection Report cc: WSRO _ NPDES Unit Central.Files Page 3 of 3 United States Environmental Protection Agency Form Approved E PA Washington,D C 20460 OMB No.2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding(i.e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 [ 2 3 I NC0024112 111 121 18/07/31 _ ]17 18 ,, 19 I s I 201 21IIIII1 IIIIIIIIIII IIIIIII I IIIIII IIIIIIiIIIi 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -Reserved 67I I 70LI I 71 I I 72 1 r, 1 731 I I' 75] I I I I I I 1 l80 Section B Facility Data LJ Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 08 50AM 18/07/31 14/10/01 Hamby Creek WWTP • 110 Optimist Park Rd Exit Time/Date Permit Expiration Date Thomasville NC 27360 12 20PM 18/07/31 19/04/30 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Allen R Beck/ORC/336-475-4246/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Kelly Craver,PO Box 368 Thomasville NC 273610368/Assistant City Manager/336-475-4220/3364754283 No Section C.Areas Evaluated During Inspection(Check only those areas evaluated) Permit • Flow Measurement II Operations&Maintenance • Records/Reports U Self-Monitoring Program U Facility Site Review II Effluent/Receiving Waters • Laboratory Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul DiMMatteon J/ WSRO WQ//336-776-9691/ f' l Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date '4.eV,i/t/I- (4/tit-ia- 7/V/5A/ EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# NPDES yr/mo/day Inspection Type 1 31 NC0024112 111 121 18/07/31 117 18 I Section D•Summary of Finding/Comments(Attach additional�sheets of narrative and checklists as necessary) Page# 2 Permit: NC0024112 Owner-Facility: Hamby Creek WWTP Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • 0 ❑ ❑ Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable • 0 0 ❑ Solids, pH, DO, Sludge Judge, and other that are applicable'? Comment' Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • ❑ application'? Is the facility as described in the permit'? • ❑ 0 ❑ #Are there any special conditions for the permit'? ❑ I ❑ 0 Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection'? • 0 0 0 Comment. Permit lists a Cannibal solids reduction system. Mr. Beck said that they don't use it anymore because it caused problems with phosphorus reduction and didn't actually reduce solids as advertised. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit'? • ❑ ❑ ❑ Is all required information readily available, complete and current'? • 0 ❑ ❑ Are all records maintained for 3 years(lab reg required 5 years)? • 0 ❑ ❑ Are analytical results consistent with data reported on DMRs? • 0 ❑ ❑ Is the chain-of-custody complete'? U ❑ ❑ ❑ Dates,times and location of sampling Name of individual performing the sampling • Results of analysis and calibration • Dates of analysis • Name of person performing analyses • Transported COCs • Are DMRs complete do they include all permit parameters'? • 0 ❑ 0 Has the facility submitted its annual compliance report to users and DWQ? • ❑ ❑ ❑ (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator • ❑ ❑ ❑ on each shift'? Is the ORC visitation log available and current'? • ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification'? • ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification'? • ❑ ❑ ❑ Page# 3 Permit: NC0024112 Owner-Facility: Hamby Creek WWTP Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Is a copy of the current NPDES permit available on site? • 0 0 ❑ Facility has copy of previous year's Annual Report on file for review? • 0 0 0 Comment: Wastewater and collection system annual reports are posted to the town's website. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ • Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑ • If effluent (diffuser pipes are required) are they operating properly'? ❑ 0 0 • Comment Mr. Beck said that they lost access to their easement when 1-85 was built and have not been able to access it since. Mr Beck said he'd personally only seen the outfall once. Flow Measurement- Influent Yes No NA NE #Is flow meter used for reporting'? ■ 0 0 ❑ Is flow meter calibrated annually'? • ❑ ❑ ❑ Is the flow meter operational'? • ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter'? ❑ ❑ • ❑ Comment. Flow is recorded on SCADA. Mr. Beck said that the chart recorder did not pass the last calibration Primary device is a 2 foot Parshall flume. Secondary device is an ultrasonic reader. Ultrasonic reader appeared to not be placed in the correct location- it was directly behind the converging section of the flume.There was a bar crossing the top of the flume that appeared to be in the correct position, that could potentially be used to mount an ultrasonic sensor. Flow Measurement- Effluent Yes No NA NE #Is flow meter used for reporting'? ❑ • ❑ ❑ Is flow meter calibrated annually'? • ❑ ❑ ❑ Is the flow meter operational'? • ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter'? ❑ ❑ U ❑ Comment Ultrasonic device over a rectangular weir. Flow is reported from the influent. Bar Screens Yes No NA NE Type of bar screen a Manual ❑ b Mechanical Il Page# 4 Permit: NC0024112 Owner-Facility: Hamby CreekWWTP Inspection Date: 07/31/2018 Inspection Type• Compliance Evaluation Bar Screens Yes No NA NE Are the bars adequately screening debris'? • ❑ ❑ ❑ Is the screen free of excessive debris'? • ❑ ❑ ❑ Is disposal of screening in compliance? • ❑ ❑ ❑ Is the unit in good condition? • ❑ ❑ 0 Comment: Grit Removal Yes No NA NE Type of grit removal a Manual ❑ b.Mechanical • Is the grit free of excessive organic matter? • ❑ ❑ ❑ Is the grit free of excessive odor'? U ❑ ❑ ❑ #Is disposal of grit in compliance'? • ❑ ❑ ❑ Comment- Oxidation Ditches Yes No NA NE Are the aerators operational'? • 0 ❑ ❑ Are the aerators free of excessive solids build up'? • ❑ ❑ 0 #Is the foam the proper color for the treatment process'? • ❑ ❑ ❑ Does the foam cover less than 25%of the basin's surface'? • ❑ ❑ 0 Is the DO level acceptable? ❑ ❑ ❑ • Are settleometer results acceptable(>30 minutes)? ❑ 0 0 • Is the DO level acceptable?(1 0 to 3.0 mg/I) 0 ❑ ❑ • Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes) 0 0 0 • Comment 5-stage Bardenpho process takes place in oxidation ditches. Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots'? • ❑ ❑ ❑ Are surface aerators and mixers operational'? ❑ ❑ • ❑ Are the diffusers operational'? • ❑ ❑ ❑ Is the foam the proper color for the treatment process'? • ❑ ❑ ❑ Page# 5 Permit: NC0024112 Owner-Facility: Hamby Creek WNTP Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Does the foam cover less than 25%of the basin's surface'? • ❑ ❑ ❑ Is the DO level acceptable'? ❑ ❑ 0 • Is the DO level acceptable?(1 0 to 3 0 mg/I) 0 ❑ ❑ • Comment Aerated holding is after oxidation and before secondary clarification. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater'? • 0 0 ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? • ❑ ❑ ❑ Are weirs level? U ❑ ❑ ❑ Is the site free of weir blockage? II ❑ ❑ ❑ Is the site free of evidence of short-circuiting'? • ❑ ❑ ❑ Is scum removal adequate? MI 0 ❑ ❑ Is the site free of excessive floating sludge'? • ❑ ❑ Cl Is the drive unit operational'? • ❑ ❑ ❑ Is the return rate acceptable(low turbulence)? • ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? • ❑ ❑ ❑ Is the sludge blanket level acceptable'?(Approximately%4 of the sidewall depth) 0 ❑ ❑ IN Comment • Filtration (High Rate Tertiary) Yes No NA NE Type of operation Cross flow Is the filter media present'? • ❑ ❑ ❑ Is the filter surface free of clogging'? • ❑ ❑ ❑ Is the filter free of growth? • ❑ ❑ ❑ Is the air scour operational'? ❑ ❑ 0 Is the scouring acceptable'? ❑ ❑ ❑ • Is the clear well free of excessive solids and filter media'? • ❑ ❑ ❑ Comment. Disinfection - UV Yes No NA NE Are extra UV bulbs available on site'? • ❑ ❑ ❑ Are UV bulbs clean'? I ❑ ❑ ❑ Is UV intensity adequate'? • 0 ❑ ❑ Page# 6 Permit: NC0024112 Owner-Facility: Hamby Creek WVVTP Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation Disinfection -UV Yes No NA NE Is transmittance at or above designed level? • 000 Is there a backup system on site? • 000 Is effluent clear and free of solids? M ❑ ❑ ❑ Comment There are three UV trains, and Mr. Beck said that each one is capable of treating 5 million gallons per day. Influent Sampling Yes No NA NE #Is composite sampling flow proportional? 11000 Is sample collected above side streams? • 000 Is proper volume collected? ❑ ❑ ❑ • Is the tubing clean? • 000 #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees • 000 Celsius)? Is sampling performed according to the permit? • 000 Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 11000 Is sample collected below all treatment units? U ❑ ❑ ❑ Is proper volume collected? • 000 Is the tubing clean? M ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 111000 Celsius)? Is the facility sampling performed as required by the permit(frequency,sampling type • 000 representative)? Comment Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 11000 Are all other parameters(excluding field parameters)performed by a certified lab? 11000 #Is the facility using a contract lab? 01100 #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees 11000 Celsius)? Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0 2 degrees? • 000 Incubator(BOD)set to 20 0 degrees Celsius+/-1 0 degrees? 000 • Page# 7 i i Permit: NC0024112 Owner-Facility: Hamby Creek WWTP Inspection Date: 07/31/2018 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Comment: Thermometer calibrations okay-checked yearly with an in-house NIST traceable thermometer. Facility performs BOD,fecal coliform, pH, conductivity, temperature, D.O., TRC, phosphorus, ammonia, and TSS in house under certification#95. Nutrient Removal Yes No NA NE #Is total nitrogen removal required? ❑ ❑ ❑ #Is total phosphorous removal required? U ❑ ❑ ❑ Type Biological #Is chemical feed required to sustain process? ❑ • ❑ ❑ Is nutrient removal process operating properly'? • ❑ ❑ ❑ Comment Pumps-RAS-WAS • Yes No NA NE Are pumps in place'? U ❑ ❑ ❑ Are pumps operational'? II ❑ ❑ ❑ Are there adequate spare parts and supplies on site? 11000 Comment. Page# 8