Loading...
HomeMy WebLinkAboutNC0024872_Report_20180816 ,pfi— { ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary LINDA CULPEPPER Interim Director August 16,2018 Mr.Johnny Lambert, Public Utilities Director Public Works Complex 298 East Depot Street RECEIVED/DENIRJDWR Mocksville, NC 27028 AUG 2 2 2018 SUBJECT: Pretreatment Audit Inspection Report Water Resources Cooleemee Wastewater Treatment Plant Permitting Section NPDES Permit No. NC0024872 Davie County Dear Mr. Lambert: On August 2, 2018, Paul DiMatteo of this office conducted a Pretreatment Audit Inspection at the above referenced wastewater treatment system.Johnny Lambert, Public Utilities Director,John Grey,Acting Pretreatment Coordinator,Tim Smith, Operator in Responsible Charge, and Joy Howard of Grey Engineering were present for the inspection.The purpose of this inspection was to determine the effectiveness of the pretreatment program,which included: a detailed file review, review of the POTW facility performance,sampling and compliance judgement program, adherence to the enforcement response plan, and observing an industrial user inspection. Background The County operates a 1.5 MGD facility and has one non-categorical industrial user: Ingersoll Rand. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on October 3, 2016 and was approved on March 3, 2017. The next HWA is due by September 30,2021. The last Industrial Waste Survey(IWS)was submitted on April 30, 2015 and was approved on May 15, 2015.The next IWS is due by April 30, 2020. The last Short-Term Monitoring Plan (STMP)was submitted on March 12, 2018 and was approved on March 28, 2018. The Sewer Use Ordinance (SUO)was approved on December 30,2013. Mr. Grey reported that the SUO was updated on November 6, 2017, but that there were no changes related to pretreatment. NORTH CAROUNA �/i' Department d Emm llwmtta10n0tY North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103 336.776.9800 The Enforcement Response Plan was approved on July 2, 2010. STMP Review POTW reported that the next round of short-term monitoring was to begin in 2019. Please remember to conduct such monitoring at the proper locations and frequencies. Industrial User Permit(IUP) File Review A review of the file for Ingersoll Rand (#0004) revealed that the monitoring data was well organized and compliant.The slug control plan was in good order. Industrial Inspection Ingersoll Rand is a compressor manufacturer that is managed by a local permit.The inspection included a thorough review of the plant and treatment process.The industry submits process control data and copies of certified lab analysis reports to the POTW. Please see the attached inspection form for sampling review recommendations. The pretreatment audit is satisfactory.The program is being implemented in an excellent manner. If you should have any questions, please do not hesitate to contact Paul DiMatteo at(336)776-9691 or our office at(336)776-9800. Sincerely, ..,AettAx:r 14.--yiJ Sherri V. Knight, P.E., Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosure—PAI Report CC: PERCS Unit—Monti Hassan WSRO Files Central Files John Grey—by email at igrev@Rrevengineering.com