Loading...
HomeMy WebLinkAbout20180937 Ver 1_More Info Received_20180821Submission Completed 173 https://edoes.deq.nc.-ov/Forms/Form/sliowformsubmission/e80l I df2-71... 3j. Comments: Impact S2, the Road crossing Dissipater will be a permanent -no permanent loss impact. Per the project engineer and note on sheet 2 of 3, "the rip -rap to be constructed such that the top of the rip -rap does not exceed the preconstruction stream elevation". All temporary stream impacts will be brought back to pre -construction elevations and the stream banks will be stabilized. obi^ 0) 3-? r -t «11 , S 1 •2, I Ig 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b. Impact Type* #1 -Stream Crossing - Allowable Location and Exempt, Allowable, allowable w/ mitigation #1 -Sanitary Sewer - Parallel -Allowable Location and Exempt, Allowable, allowable w/ mitigation #2 -Sanitary Sewer Crossing -Allowable Location and Exempt, Allowable, allowable w/ mitigation 6c. Per or 6d. Stream name* Temp* P UT to Little Brier Permanent (P) Creek or Temporary (T) P UT to Little Brier Permanent (P) Creek or Temporary (T) P UT to Little Brier Permanent (P) Creek or Temporary (T) 6h. Total buffer impacts: Zone 1 Temporary impacts: 0.00 Zone 2 0.00 6e. Buffer mitigation 6f. Zone 1 6g. Zone 2 required?* impact* impact* No FTM4,605 (square feet) (square feet) No 0 588 (square feet) (square feet) No 1,894 1,808 (square feet) (square feet) 12 of 20 7/3/2018, 3:05 PVI