3j. Comments:
Impact S2, the Road crossing Dissipater will be a permanent -no permanent loss impact.
Per the project engineer and note on sheet 2 of 3, "the rip -rap to be constructed such that
the top of the rip -rap does not exceed the preconstruction stream elevation". All
temporary stream impacts will be brought back to pre -construction elevations and the
stream banks will be stabilized.
obi^ 0) 3-?
r -t «11 , S 1 •2, I Ig
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
6a. Project is in which protect basin(s)?*
Check all that apply.
Neuse Tar -Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
6b. Impact Type*
#1 -Stream Crossing -
Allowable
Location and Exempt, Allowable,
allowable w/ mitigation
#1 -Sanitary Sewer -
Parallel -Allowable
Location and Exempt, Allowable,
allowable w/ mitigation
#2 -Sanitary Sewer
Crossing -Allowable
Location and Exempt, Allowable,
allowable w/ mitigation
6c. Per or 6d. Stream name*
Temp*
P UT to Little Brier
Permanent (P) Creek
or Temporary
(T)
P UT to Little Brier
Permanent (P) Creek
or Temporary
(T)
P UT to Little Brier
Permanent (P) Creek
or Temporary
(T)
6h. Total buffer impacts:
Zone 1
Temporary impacts: 0.00
Zone 2
0.00
6e. Buffer mitigation 6f. Zone 1 6g. Zone 2
required?* impact* impact*
No FTM4,605
(square feet) (square feet)
No 0 588
(square feet) (square feet)
No 1,894 1,808
(square feet) (square feet)