June 24,2014
Granville County
NCDWR Roject Na. 20140568
Jerry Thomas Road, Camp Bumer
APPROVAL of 401 WATER QUALITY CERTIFICATION end NEUSE BUFFER AUTHORIZATIOIV,
with ADDITIONAL CONDITIONS
Mr. Michael Glisson
NaturaUCultural Resources Manager
North Carolina Na[ural Guard
1636 Gold Star Drive
Raleigh, NC 27607
Dear Mr. Glisson:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
the Jerty Thomas Road project at Camp Butner in Granville County:
Site Permanent Fill fn Ini
linea�
1 0
3 30
Total
2
Total
100
iver Basln
Fill in Perennisl Stream Total
30 I 30
pact for Project 601ineer feet.
Wetland Impacts in the Neuse River Ba
Permanent Fill ac 1
0.1
0.1
Total Wetland Impact for Project: 0.1 acres.
Neuse Ri arian BuRer Im acts
�. Zone 1 BuRer Mitigation Zone 2 Impact
Re uired usin 3:1 ratio s ft
N/A 0
N/A 0
0 I'
' n/a = Total for Site is less than I/3 acre antl I�u Im
Total Buffer Impact for Project: 100 square feet.
TrenspoAa6on and Permilting Unit -
1617 MaA Service Center, Raleigh, NOM Cerolina 27fi99-1650
Loca6on: 572 N Sa1�sDury SI. Ralegh, NMh CemNna 27604
PMne. 919E07fi3001 FAX: 919-733-1290
Inleme�� www.ncxatemueih.om
M EquA Oppdtumtyl Afirmalrve Aclan Employx
Wetland
0.1
N/A
p I 0
fee[ of impact, no mitigation requin
30
30
60
Required
NoRe Carolina
�tura!!�
The projec[ shall be constructed in accordance with your application received June 4, 2014. After reviewing your
applica[ion, we have decided that [hese impac[s are covered by General Wa[er Quality Certification Number 3883.
This certification cortesponds to the Nationwide Pertnit 3 issued by the Corps of Engineers. This approval is also
valid tor the Neuse Riparian Buffer Ruks (ISA IVCAC 2B.0233). In addlNon, you should acquire any other
federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Weter Supply Watershed regulations. This approval will expire with the
accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDW R and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the condi[ions. If total wetland fills for this project (now or in the future) exceed one acre, or of to[al
impacts to streams (now or in the future) exceed I50 linear feet, compensatory• mitigation may be required as
described in I SA NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as deuribed in I SA NCAC 26.0242(9). For [his approval [o remain valid, you must adhere to the conditions listed
in the attached certification(s) and any additional conditions listed below.
Conditions of Certiflcation:
1. For projects impacting waters classified by the NC Environmental Management Commission as High Quality
Waters (HQW), or Water Supply, stormwater shall be directed to vegetared buffer areas, grass-lined ditches or other
means appropriate to ihe site for the purpose of pre-treating starm water runoff prior to discharging diroctty into-
streams. Mowing of existing vegetated buffers is suongly discouraged.
2. The permittee shall use /Design Standards in Sensitive Wa[ersheds/( I SA NCAC 4B.0124[a]-[e]) in areas draining
to WS-11 HQW waters. However, due to the size of the project, the applicant not be required to meet I SA NCAC 46
.0124(a) regarding the maximum amount of uncovered acres. Temporary cover (wheat, millet, or similar annual
grain) or pertnanent herbaceous cover shall be planted on all bare soil within I S business days of ground disturbing
activities ro provide erosion conhol.
3. Tall feswe shall not be used in the establishment of temporary or permanent groundcover wi[hin riparian areas.
For the establishmen[ of permanent herbaceous caver, erosion control matting shall be used in conjunction with an
appropriate native seed mix on disturt�ed soils within the riparian area and on disturbed steep slopes with the
following exception. Erosion control matting is not necessary if the area is contained by perimeter erosion cantrol
devices such as silt fence, temporary sediment ditches, basins, etc. Matting should be secured in place with staples,
stakes, or wherever possible, live stakes of native trees. Erosion control matting placed in riparian areas shall not
conmin a nylon mesh grid, which can impinge and entrap small animals. For the establishment of temporary
groundcover within riparian areas, hydroseeding along with wood or cellulose based hydro mulch applied from a
fertilizer- and limestone-free tank is allowable at the appropriate rate in conjunction with the erosion controi
measures. Discharging hydroseed mixturos and wood or cellulose mulch inro surface waters in prohibi[ed.
Riparian areas are defined as a distance 25 feet landward from top of stream bank.
4. Unless otherwise approved in this certification, placemcnt of culverts and other swctures in open waters end
streams,.shall be placed below the elevation of the streambed by one foot for all culverts with a diameter grcater than
48 inches, and 20 percent of [he culvert diameter for culverts having a diamecer less than 48 inches, ro allow low flow
passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion
control measures shall not be conduc[ed in a manner that may result in dis-eq�ilibrium of wetlands or streambeds or
banks, adjacent to or upstream and down stream of the above strvctures. The applicant is required to provide evidence
that [he equilibrium is being maintained if reques[ed in writing by the NCDWR. If this condi[ion is unable ta be me[
due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on
how to proceed and to determine whether or not a permit modification will be required.
5. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage. Bioengineering boulders or structures should be properly designed, siud and installed.
6. For any streams being impacted due ro site dewatering activities, the site shall be graded to its preconstruction
contours and revegetated with appropriate native species.
7. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless
otherwise approved by this certification. •
8. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with
native woody species before the next growing season following completion of construction.
9. Pursuant to 15A NCAC 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any
Neuse Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and
erosion control devices in Zone l, outside of the approved project impacts, anywhere on this project. Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not
compromised and that discharge is released as diffuse flow.
10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. .
11. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers.
� 12. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions.
13. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval.
14. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water.
I5. Heavy equipment shall be operated from the banks, rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. � �
16. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. -
17. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification.
18. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (inc(uding any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not
being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated,
or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this
certification.
19. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the on-site project
manager.
20. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas
within the fencing are prohibited unless otherwise authorized by this certification.
21. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc. • �
22. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. '
23. Upon completion of the project (including any impacts at associated borrow or waste sites), project manager shall
complete and return�the enclosed "Certification of Completion Form" to notify NCDWR when all work included in the
401 Certification has been completed.
24. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project
by the end of the growing season following completion of construction.
25. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities.
26. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual. —
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Caro[ina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
27. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by�
this Certification.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one ( l) copy of the petition must be filed with the Offce of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings �
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (9l9}-431-3000, Facsimil'e: (919)-431-3100
A copy of the petition must also be served on DENR as follows:
Mr. Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Aa. If you
have any questions, please contac[ Rob Ridings at 919-707-8786.
Sincerely,
�
�.
Thomas A Reeder, Director
Division of Water Resources
cc: Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
NCDWR Raleigh Regional Office
File Copy