Loading...
HomeMy WebLinkAbout20180891 Ver 1_More Info Received_20180716Strickland, Bev From: Doug Johnson <diohnson@b|uehdgeenergy.com> Sent: Monday, July l6'ZUl85:llPK4 To: Anninc\ Amy K4 Subject: RE: [External] RE: DWR 2018-0891 Shoreline Stabilization Add -Info Request Follow 0pFlag: Follow up Flag Status: Flagged Thanks for clarifying Amy. VVethought vvehad requested: 2'x 300' Below 2'x3O(YAbove With new knowledge about the erosion and after talking with Wade Harmon at Duke we need to modify the request to: 1'x300' Below 5'x3OO'Above And I will need to calculate the slope tonight, I'm pretty sure it will be gentler than 2:1, but I will email it to you tomorrow. Erosion control measures will beasyou recommended to me last month: Si|tfence with wire back Wattles and straw Above the rock vveplan touse mulch and ground cover vegetation. And in full transparency we are using large river stone instead of rip rap, in the drain ditch the river stone will be boulder sized. Thanks, Doug moumJo*msom CHIEF EXECUTIVE OFFICER 1z1sBLOWING ROCK BLVD ms pnBOX 11z"LEmn|R,mczus4* Ph: 828-759-8999 mue,idoeene,m.cum From: Annin4Amy M[mai|toumyannino@ncdencgov Sent: Monday, July 16,ZU1O4:49PM To: Doug Johnson xdjohnson@b|ueridgeenergycom> Subject: RE: [External] RE: DWR 2018-0891 Shoreline Stabilization Add -Info Request 1 EXTERNAL Alla please be careful with attachments orlinks Doug, I need the proposed amount of rip rap that you want to apply to the shoreline above and below the full pond level. • 1 need the shoreline stabilization dimensions to be in this format - o Above: 2' x 200' o Below: 2'x 200' For the grading work, what is the proposed slope you intend to grade to (ex: 2:1)? How do you plan to stabilize the newly graded area above the rip rap? Please indicate what erosion control measures you plan to use to keep sediment from entering the lake (mulch, vegetation, etc). Thanks! Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office g.ML.aiiiiiiiiiiopiiicdeiiiir.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 From: Doug Johnson [rna_ilto. dlcrhnscrn(c�k�lueridgeenergy.�carn] Sent: Monday, July 16, 2018 4:24 PM To: Annino, Amy M <arny.gnnino n�denr-.ggy> Subject: [External] RE: DWR 2018-0891 Shoreline Stabilization Add -Info Request Hi Amy, Please see my answers below in red. Thanks, Doug DOUGIOHNSON CHIEF EXECUTIVE OFFICER 1216 BLOWING ROCK BLVD NE PO BOX 112 • LENOIR, NC 28645 Ph: 828-759-8999 blueridgeenergy.com From: Annino, Amy M [Mr!ilto. arrr_y._anninca(n deer: crv] Sent: Monday, July 16, 2018 4:06 PM To: Doug Johnson<d�crhnscrn(ckluerideenergy:ccr> Subject: DWR 2018-0891 Shoreline Stabilization Add -Info Request EXTERNAL Alla please be careful with attachments orlinks On June 27, 2018, the Division of Water Resources (Division) received your application dated June 21, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until all of the following items are addressed: Please clarify if the shoreline will be graded back to a gentler slope. Yes, as we began dock construction we found out that there was significant erosion into the shoreline bank. We will have to cave in the land that has been undermined which will create a much gentler slope. The area we did for the dock construction is good representation of how the rest will be stabilized, and I will be happy to send you a picture if that would be helpful. • Please clarify the extent of shoreline stabilization above and below the full pond level you are proposing on Gunpowder Creek in the backwaters of Lake Hickory (ex: 2' height above x 200' length). The information you provided in your application was not clear. It is one foot or less below water and 4-6 feet of sloped bank with rock. Bank height varies some because of terrain differences. I will be happy to send you a picture of what we did for the dock construction if that would be helpful. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide a response by August 17, 2018. Please contact me if you have any questions or concerns. Sincerely, Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.auiuiiuio uicdeuiir.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 EFn7 itorr sl,)omen to amt from this a h 1r ss is subiect to the 'J ill`? Carolina PublicRecorcis Law anci may be clic l sc l to thin l pails s