Loading...
HomeMy WebLinkAbout20180891 Ver 1_More Info Received_20180716 (2)Strickland, Bev From: Doug Johnson <djohnson@blueridgeenergy.com> Sent: Monday, July 16, 2018 9:27 PM To: Annino, Amy M Subject: Re: [External] RE: DWR 2018-0891 Shoreline Stabilization Add -Info Request Attachments: image001.png CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spa m.<mailto:report.spam@nc.gov> Hi again Amy, My landscaper came over tonight and the bank slope will be 2:1. Thanks, Doug Sent from my iPhone On Jul 16, 2018, at 4:48 PM, Annino, Amy M <amy.annino@ncdenr.gov<mailto:amy.annino@ncdenr.gov>> wrote: EXTERNAL EMAIL: Please be careful with attachments or links Doug, I need the proposed amount of rip rap that you want to apply to the shoreline above and below the full pond level. * I need the shoreline stabilization dimensions to be in this format - Above: 2' x 200' * Below: 2'x 200' For the grading work, what is the proposed slope you intend to grade to (ex: 2:1)? How do you plan to stabilize the newly graded area above the rip rap? Please indicate what erosion control measures you plan to use to keep sediment from entering the lake (mulch, vegetation, etc). Thanks! Amy Annino Environmental Specialist—Asheville Regional Office Water Quality Regional Operations Section NCDEQ— Division of Water Resources 828 296 4656 office amy.annino@ncdenr.gov<mailto:amy.annino@ncdenr.gov> 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 <i mage001. png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 1 From: Doug Johnson [mailto:djohnson@blueridgeenergy.com] Sent: Monday, July 16, 2018 4:24 PM To: Annino, Amy M<amy.annino@ncdenr.gov<mailto:amy.annino@ncdenr.gov>> Subject: [External] RE: DWR 2018-0891 Shoreline Stabilization Add -Info Request CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spa m.<mailto:report.spam@nc.gov> Hi Amy, Please see my answers below in red. Thanks, Doug Doug Johnson Chief Executive Officer 1216 Blowing Rock Blvd NE PO Box 112 • Lenoir, NC 28645 Ph: 828-759-8999 blueridgeenergy.com<http://www.blueridgeenergy.com> [Blue Ridge Energyj<http://www.blueridgeenergy.com/> From: Annino, Amy M [mailto:amy.annino@ncdenr.gov] Sent: Monday, July 16, 2018 4:06 PM To: Doug Johnson <djohnson@blueridgeenergy.com<mailto:djohnson@blueridgeenergy.com>> Subject: DWR 2018-0891 Shoreline Stabilization Add -Info Request EXTERNAL EMAIL: Please be careful with attachments or links On June 27, 2018, the Division of Water Resources (Division) received your application dated June 21, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on hold until all of the following items are addressed: * Please clarify if the shoreline will be graded back to a gentler slope. Yes, as we began dock construction we found out that there was significant erosion into the shoreline bank. We will have to cave in the land that has been undermined which will create a much gentler slope. The area we did for the dock construction is good representation of how the rest will be stabilized, and I will be happy to send you a picture if that would be helpful. * Please clarify the extent of shoreline stabilization above and below the full pond level you are proposing on Gunpowder Creek in the backwaters of Lake Hickory (ex: 2' height above x 200' length). The information you provided in your application was not clear. It is one foot or less below water and 4-6 feet of sloped bank with rock. Bank height varies some because of terrain differences. I will be happy to send you a picture of what we did for the dock construction if that would be helpful. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide a response by August 17, 2018. Please contact me if you have any questions or concerns. Sincerely, Amy Annino Environmental Specialist—Asheville Regional Office Water Quality Regional Operations Section NCDEQ— Division of Water Resources 828 296 4656 office amy.annino@ncdenr.gov<mailto:amy.annino@ncdenr.gov> 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 <i mage001. png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties