HomeMy WebLinkAbout20181107 Ver 1_Shoreline Stabilization Side View dated Aug 21_20180821Lot Stabilization Side View
Back fill with Rip Rap
and dirt as needed
Dry stack boulder wall
(s-8)
mMack as needed
Existing Lot
with 6' - 10'
`ell pend Dropoff
Rip Rap a[2.1 slope
Trenched wall footer for foe slope