Loading...
HomeMy WebLinkAbout20181108 Ver 1_More Info Requested_20180820 North Carolina Department of Environmental Quality |Division of Water Resources - Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 August 20, 2018 DWR # 18-1108 BEAUFORT County CERTIFIED MAIL: 7017 1070 0000 9922 1732 RETURN RECEIPT REQUESTED T.J.’s Development, LLC Attn: Mr. Toby Tetterton, Sr. PO Box 125 Pantego, NC 27860 Subject: REQUEST FOR ADDITIONAL INFORMATION TJ’s Land Development, LLC – Marina and Boat Maintenance Facility Dear Mr. Tetterton: On August 8, 2018, the Division of Water Resources (Division) received your application dated August 1, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on-hold until all of the following information is received: 1. Wastewater Management System for Onsite Boat Wash facility: You will need to apply for the and have approved the plans for Deemed Permitted Closed Loop System for Boat Wash Down facility. In addition, a more detailed Operation and Maintenance plans for the proposed facility will need to specifically address how all overspray water generated during wash down will be contained (via curtains to enclose the boats or within a building). Also, the plan will need to provide specific details regarding the removal of excess residual of the wash down pad to ensure storm water discharge does not become a waste water discharge. (15A NCAC 02T .0104) T.J.’S LAND DEVELOPMENT, LLC ATTN: MR. TOBY TETTERTON, SR. REQUEST FOR ADDITIONAL INFORMATION Page 2 of 2 North Carolina Department of Environmental Quality |Division of Water Resources - Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 Pursuant to Title 15A NCAC 02H .0502(e) and 15A NCAC 02T .0104, the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under Section 401 of the Clean Water Act for this activity and any work done within waters of the state and buffer may be a violation of North Carolina General Statutes and Administrative Code. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operation Section Division of Water Resources, NCDEQ cc: Raleigh Bland, USACE Washington Regulatory Field Office (via email) Gregg Bodnar, DCM Morehead City Steve Trowell, DCM WaRO Samir Dumpor, DEMLR WaRO Laserfiche Joseph S. Lassiter, Lassiter Environmental Consulting, LLC (via email: jslassiter@embarqmail.com) Filename: 18-1108_TJsLandDevelopmentLLC_401_HOLD