Loading...
HomeMy WebLinkAbout20052159 Ver 1_Certification of Completion_2009060315 5 -Z !3q MC,l)('e F@'Pe'JOYRO G CR JUN S 2009 WETLANOSNAND STORRQUAUTY M ATER BRANCH DWQ Project No.: WQ0003565 County: Moore Applicant: NC Department of Transportation Project Name: IraL.go f Lc Z2 612 1643 tit A"aa Date of Issuance of 401 Water Quality ertification: Aixrr? 31) Zoo(. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Aget's Certification 1, k ruq a C Q I &sae ?E hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved p and speec?i?ccaations, and other supporting materials. Signature: Date: Engineer's Certification Partial X_ Final. --Cy-? C C'+ "sa^ i as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state.that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Registration No. ' "Z Blo Date (.11161 November 17, 2005 Cindy Carr Natural Resources Project Manager Mulkey Engineers & Consultants 6750 Tryon Rd. Cary, NC 27511 Re: Moore County Airport Relocation of NC 22 and SR 1843 TBI No. 3201-0005 Dear Cindy, Mulkey Engineers & Consultants has the authority to act as the agent for Talbert & Bright and the Airport Authority in the submittal of the 404/401 permit application for the above-referenced project. Please copy us and the Airport on all comments received from the Corps or other agencies/individuals during the permitting process. In addition, we request that you coordinate responses and meeting request with us. Sincerely, cLanc, P.E. C: Mr. Ron Maness ENGINEr RINC & PLANNING CONSULTANTS WWW.TAI. BERTANDSRIGHT COM 4810 SHELLF,Y DRIVE WII.MINGTON_ NC 28405 910763.5350 FAX 910.762.6281 WII MINGTON. NORTH CAROLINA • CHARLOTTE. NORTH CAROLINA • RICHMOND. VIRGINIA