HomeMy WebLinkAbout20011798 Ver 1_Other Agency Comments_20090610. .-?...}.,"Y`4.k`?:+S.Y.r.rN".y a wT'•.[,..b'/n `EY. J-Y •.. ,..,ti-Mr.. r, r..?vY+G..viY?T °'W/?+. .w,bAN}l...C.?vi).Y ..._ ? ... ?.. i hAy?'. /?. <#? N .. -.?..< ?-??v_YKP?.?'..:,Ka +tn`?r.... .n_ .a',?}/,sYn, n .+. ?. >. rw rr, ,
Permit Cltass 100u?2-c? p pl _ 11 q $ Per ormit Number
Ind RENEWAL Paz 47-03
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
r and
,r
Coastal Resources Commission
1
for
:l
X Major Development in an Area of Environmental Conc. Y
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to W.W. Winner, PO Box 1069, Carolina Beach, NC 28428
Authorizing development in New Hanover County W, bank Cape Fear River, S. of USS North Carolina
Battleship Memorial, on Eagle Island , as requested in the permittee's letter dated 12/30/08
This permit, issued on June 9. 2009 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original Permit No. 47-03, which was issued on 4/8/2003, as well
as the renewal of 2/15/07, and copies of all documents shall be readily available on site when Division
personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
1 ms permit action may be appealed by the permtttee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James H. regs n, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
December 31, 2010
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
H
W
S
Haggett Engineering Associates, inc.
December 30, 2008
Ms. Holley Snider
Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Subject: CAMA PERMIT DEVELOPMENT PERIOD EXTENSION
W.W. Winner Property - Permit No. 47-03
Proposed Dock/Wharf Facility on Eagle Island
International Paper Road, Wilmington, NC
HEA Project No. 00-1005
Dear Ms. Snider:
Haggett Engineering Associates, Inc. (HEA) has prepared this letter in order to request a two year extension
to CAMA permit 47-03 that was originally issued on April 8, 2003. A two year extension to the original
permit was granted on February 15, 2007. The permit will expire on December 31, 2008.
The following are submitted in accordance with the requirements of 15A NCAC 07J .0404 (b):
The proposed dock and wharf to be constructed under this permit have been delayed by loss of the
development proposed for the land-side of the project. As you may be aware, Mr. Winner had the
project under contract with a development group that planned to construct a convention center on the
site. Poor economic conditions and a lack of support from the City caused this key component of the
project to fail. Therefore, work approved under this permit has not been started. Mr. Winner plans
to proceed with the construction of the dock and wharf facility as soon as possible.
2. As noted in Item 1 above, the proposed land-side portion of the project has failed due to the poor
economic conditions and lack of support from the City of Wilmington. Mr. Winner is working to
develop an alternate plan for the development of the property. The development plan will likely be a
scaled down version of the original Convention Center conceived for the site. Some type of land-
side development is needed to support the proposed dock and wharf approved under the permit. As
noted in the original application, the primary use for the dock and wharf facilities will be for Mr.
Winner's charter boats. However, portions of the facility would also be available for short term use
by Coast Guard approved self-contained vessels not requiring dock connections.
01005LT7 D'CM 1LM1NG i 0N, NUC
P.O. Box 15104 • Wilmington, North Carolina 28408 • 910-397-0808 !AN! 0 5 20;'`±
Ms. Holley Snider
HEA Project No. 00-1005
December 30, 2008
Paye 2 of 2
3. The plans for the proposed dock and wharf approved under this permit have not changed.
4. The property has not changed ownership.
5. The project is in compliance with the conditions of the permit and permits issued by other agencies.
We are enclosing the following items with this letter:
1. Copy of the original permit
2. Copy of the extension issued on February 15, 2007
3. Copy of the site plan
4. Check in the amount of $100 for the extension fee.
If you have any further questions, please do not hesitate to contact us at (910) 397-0808.
Thank you for your assistance with this extension.
Sincerely,
Haggett Engineering Associates, Inc.
eouglas. Haggett, P.E
Senior Engineer
DCM WILMINGTON, NC