Loading...
HomeMy WebLinkAbout20140762 Ver 4_August inspection Site 6 Section D_20180820Wetland Inspection Report Project Num: 20140762 Project Name: NCDOT- US 221 (R-2915 ABD) County: Watauga Location: NCDOT- US 221 (R-2915 ABD) Latitude: +35° 16' 05" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 8/17/2018 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Road/Highway Widening Region: Central Title: ❑ Not Compliant Longitude: -81 ° 30' 10" Phone: Phone: 336-776-9703 The rock cross vane at Site 6 needs to be redesigned to handle stormflow. Div staff believe it will be blown out. Div staff will consult with Hydro and submit a permit modification. page: 1 Site Number: 20140762 Inspection Date: 8/17/2018 Owner: Thorpe, Gregory Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE ❑ � ❑ ❑ ❑ � ❑ ❑ � ❑ ❑ ❑ Comment: We visited Site 6 in the D-Section. DOT explained that the planned for rock cross vane is probablv not stout enouqh to handle storm flow from the culvert. DOT attempted Class A riprap but it was blown out. We (DWR and the Corps) requested that thev consult with DOT's hvdroloqv section in Raleiqh to rethink the rock vane desiqn. Additional bank stabilization mav be needed as well. A permit modification will likelv be needed since the desipn has chanqed somewhat. No other sites on the D Section were reviewed. page: 2