HomeMy WebLinkAbout20140762 Ver 4_August inspection Site 6 Section D_20180820Wetland Inspection Report
Project Num: 20140762
Project Name: NCDOT- US 221 (R-2915 ABD)
County: Watauga
Location: NCDOT- US 221 (R-2915 ABD)
Latitude: +35° 16' 05"
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 8/17/2018
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Road/Highway Widening
Region: Central
Title:
❑ Not Compliant
Longitude: -81 ° 30' 10"
Phone:
Phone: 336-776-9703
The rock cross vane at Site 6 needs to be redesigned to handle stormflow. Div staff believe it will be blown out. Div staff
will consult with Hydro and submit a permit modification.
page: 1
Site Number: 20140762
Inspection Date: 8/17/2018
Owner: Thorpe, Gregory
Inspection Type: Site Inspection (DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Reason for Visit: Routine
Yes No NA NE
❑ � ❑ ❑
❑ � ❑ ❑
� ❑ ❑ ❑
Comment: We visited Site 6 in the D-Section. DOT explained that the planned for rock cross vane is probablv not
stout enouqh to handle storm flow from the culvert. DOT attempted Class A riprap but it was blown out.
We (DWR and the Corps) requested that thev consult with DOT's hvdroloqv section in Raleiqh to rethink
the rock vane desiqn. Additional bank stabilization mav be needed as well. A permit modification will
likelv be needed since the desipn has chanqed somewhat. No other sites on the D Section were
reviewed.