HomeMy WebLinkAbout2018-06-28 NCDEQ Land Disturbing ApprovalEnergy. Mineral
and Land Resources
ENVIRONMENTAL QUALITY
June 28, 2018
LETTER OF APPROVAL
National Renewable Energy Corp.
Attention: Andrew Giraldo, President & CFO, EPC
227 Southside Drive, Suite B
Charlotte, North Carolina 28217
RE: Project Name: Violet Solar Farm
Acres Approved: 32.03 Acres
Project ID: CABAR-2018-109
County: Cabarrus, City: Mt. Pleasant
Address: B. Street
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: National Renewable Energy Corp.
Date Received by LQS: June 15, 2018
Plan Type: New
Dear Mr. Giraldo:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR.
Interim Director
This office has reviewed the subject erosion and sedimentation control plan. We frid the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan approval shall expire three (3) years following the date
of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
Please be aware that your project will be covered by the enclosed NPDES Construction
Stormwater General Permit NCGO10000. Please become familiar with all the requirements and
conditions of this permit in order to achieve compliance.
Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider this letter to give the Notice
required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the
approved plan.
Stare of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Mooresville Regional ice 1610 East Center Ave Ste 3011 Mooresville, NC 28115
704 663 1699 T
Letter of Approval
National Renewable Energy Corp.
June 28, 2018
Page 2 of 2
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated
Sincerely,
9 U a, U�-�
Ousmane Sidibe
Assistant Regional Engineer
Land Quality Section
SID
Enclosures: Certificate of Approval
NPDES Permit
cc: David Whittington; P.E., SEPI Engineering, 1025 Wade Ave., Raleigh, NC 27605
cc: Inspection Department