HomeMy WebLinkAbout20180847 Ver 1_More Information Received_20180817Action History (UTC -05:00) Eastern Time (US & Canada)
Submit by Anonymous User 8/17/2018 1:11:18 PM (Message Start Event)
Accept by Montalvo, Sheri A 8/20/2018 11:46:11 AM (NON -DOT - Existing Project)
• The task was assigned to Montalvo, Sheri A. The due date is: August 22, 2018 5:00 PM
8/17/2018 1:11 PM
Staff Review
ID#* Version* 1
20180847
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Andrew Moore:eads\awmoore3
Select Reviewing Office:* Asheville Regional Office - (828) 296-4500
Submittal Type:*
Application Attachments
Does this project require a request for payment to be sent?
r
Yes
r
No
Project Submittal Dated 8/17/2018
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r New Project
r Pre -Application Submittal
F More Information Response
r Other Agency Comments
r For the Record Only (Courtesy Copy)
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Project Contact Information
Name: Alea Tuttle
Who is subrritting the information?
Email Address: alea@cwenv.com
Project Information
Existing ID #: Existing Version:
2018847 1
20170001 (no dashes)
Project Name: White Oak Phase 5 (DWR Project #2018847)
Is this a public transportation project?
r Yes
t= No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yesr No r Unknown
County (ies)
Henderson
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
Response to DWR 8.17.2018—attachment A.pdf 5.47MB
Only pdf or lqm files are accepted.
Describe the attachments:
On July 24, 2018, we received your email requesting additional information in response to our application on
June 8, 2018 for the construction of the White Oak Phase 5 housing development in Henderson County
(DWR Project #2018847). The following items were requested, and our response is included.
V By checking the box and signing box below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
• I intend to electronically sign and submit the online form."
Signature:
Submittal Date:
Re: Request for Additional Information, White Oak Phase 5, Henderson County (DWR Project
#2018847)
Andrew,
On July 24, 2018, we received your email requesting additional information in response to our application
on June 8, 2018 for the construction of the White Oak Phase 5 housing development in Henderson
County. The following items were requested, and our response is included below in italics:
1. Please demonstrate that alternative lot layouts and configurations have been evaluated in an effort
to avoid stream and wetland impacts and that the project purpose cannot be practically
accomplished using an alternative lot layout or configuration. [15A NCAC 02H .0506(f) and (g)]
The development of White Oak is part of a long term master plan and Phase 5 is consistent with
earlier phases of development. Impacts for the entire project (Phase 1-5) have been limited
wetland and stream impacts to the current proposal. The lot layout is already organized in a
fashion that minimizes impacts to jurisdictional areas and impacts are so minimal that they fall
below the notification threshold for NC DWR 401 program.
2. Please provide building envelopes for all lots with wetlands and streams on the site plans to
demonstrate these lots are buildable without additional jurisdictional impacts. [15A NCAC 02H
.0502(g)]
The requested additional information is provided in Attachment A, Sheet I
3. In order to comply with the stormwater conditions of the General Certification, the project is
required to provide either:
a. A completed Stormwater Management Plan, or
b. The following items to document that the project will not cause degradation of downstream
surface waters:
Please see Attachment A for the "Revised Stormwater Analysis " report. Pre and Post
development analysis of the entire drainage area is included in the report. A pipe detention
system with outlet control has been added to reduce stormwater volume rates at both the
culvert discharge at the receiving stream and at the 48" culvert exiting the southwest corner
of the property to below pre -development levels.
A discussion on how the project will not cause degradation of downstream
surface waters when considering the volume and velocity of the increased
flows and the current size/condition of the receiving stream. It appears the
site is currently open space including a wooded buffer around the streams
and wetlands. The proposed percent impervious will increase from 0% to
28%. The site drains to the southwest corner of the property. The calculated
flow rate used for the pre -development velocity calculation is 115 cfs,
while the flow rate used to calculate the post -development velocity is only
68.6 cfs. It is unclear how the post -development flow rate would be lower
than the pre -development flow rate. Please provide revised post -
development calculations that take into account the entire drainage area for
the receiving stream and the resulting cumulative discharge rate.
Please see the attached `Revised White Oak Phase 5 Stormwater Analysis" in
Attachment A.
II. Delineation of each drainage area and accompanying calculations to show
that flows from every discharge point will be non-erosive to both the land
surface and the receiving surface water during the peak flow from the 10 -
year storm event. Please also show that the cumulative flows to the
receiving stream in the southwest corner of the property will be non-
erosive. You may refer to the guidelines from DEMLR - Sedimentation and
Erosion Control to determine an appropriate non-erosive velocity. The
permissible velocities for erosion protection are under Appendix 8.05 (i.e.
Chapter 8).
Please see the attached "Revised White Oak Phase 5 Stormwater Analysis" in
Attachment A.
III. Calculations to demonstrate that for any discharge points proposed to
increase flow rate and volume, the structural stability of the receiving
surface water will not be compromised. Please note that there will be a
monitoring requirement to demonstrate that the project will not cause
degradation of the receiving stream. Monitoring will not be required if the
project follows an approved Stormwater Management Plan.
The flow rate and volumes have been modeled for the 10 year storm pre and post
construction, and for discharge points with outlet control. The calculation results
are summarized on page one of the attached "Revised White Oak Phase 5
Stormwater Analysis " in Attachment A.
IV. Designed drawings (both aerial and profile views showing the actual
designed dimensions) and calculations of any proposed diffuse flow or
detention systems and any vegetated conveyances (if provided). [ 15A
NCAC 02H .0506(b)(3)]
See detail on Attachment A Sheet 7 depicting culvert outlet control structure.
5. The storm pipe cross section detail appears to depict a rip rap pad at the stormwater pipe outlet. Is
a rip rap pad proposed at the stormwater pipe outlet? If so, will the rip rap pad be placed within
the stream channel, and if so, are those impacts included as part of the 149.5 feet of proposed
stream impacts? [15A NCAC 02H .0502(a)]
Odom Engineering has determined that riprap stabilization at the Stormwater outlet pipe will not
be required to prevent scour and erosion. The drawing in Attachment A has been revised to show
that no rip rap will be placed in the stream channel and no impact is proposed beyond the 149.5
feet ofproposed stream impacts.
6. Will additional stream or wetland impacts be required to connect each proposed residence to the
sewer line? [15A NCAC 02H .0502(a)]
No additional impacts will be required to connect each residence to the sewer line. The sewer
line will be connected along the proposed road corridor.
7. Please provide a sequence of construction for the proposed wetland impact W 1 that details how
the proposed 0.09 acres of wetland will be filled without causing a violation of wetland standards
in the remaining portion of the wetland, including any un -permitted fill, or a violation of any
stream standards. Please include details regarding sediment and erosion control measures and
construction access. [15A NCAC 02B .0211, 0231 and 15A NCAC 02H .0502(c)].
The requested additional information is provided in Attachment A: Page 7 SEC details have been
revised to add specific instruction related to filling the wetland impact areas without causing a
violation of wetland standards in the remaining portion of the wetland and requiring fill in the
wetland to be approved by a geotechnical engineer.
The applicant believes the information submitted in this correspondence addresses all issues set forth in
your email dated July 24, 2018. This response letter and Attachment A will be uploaded via the electronic
document submittal form. Should you have any questions or comments concerning this project please do
not hesitate to contact me at 828-698-9800.
Sincerely,
Alea
ATTACHMENT A: Revised Plan Pages and Revised Stormwater Analysis
5TRUCTURE TABLE
Slid.
5TRUCTURE NAME:
DETAILS:
PIPES IN:
PIPES OUT
51ZE
RIM = 2137.00
SLOPE
MATERIAL
OUTLET CONTROL 5TRUCTURE
INV IN = 21 26.23
51VPipe - (1)
5WP,pe - O
O HDPE P.pe
IHV OUT = 212G, 13
42'
34,39-
j.59%
RIM = 2138.53
5VVPipe - (3)
42'
JB- I
IN`✓ IN = 2126.61
5WPipe - (2)
51.VPipe - (1)
60'
IN`✓ OUT = 212C.51
0.50%
60 mch HDPE Pipe
HTV- I
RIM = 2130.10
SLVPipe - O
0.50%
60 mch HOPE Pipe
INV IN = 21 26.00
18'
49.95'
AB -4
= 2138.50
CULVERT -3
5WPe - (Pi 4)
26.28'
INRJM
V OUT = 2130.00
0 RC,
15-
RIM = 2138.49
133%
0 RCI
AB -3
RIV IN = 2129.50
5LVRpe - (4)
5WPIpe - (3)
0 RCP
INV OUT = 2129.40
0.158
20 7,119 6,365
0.146
RIM = 2134.55
0.149
AB -2
IN IN= 2127.19
SWPipe - (3)
StVPipe (2)
INV OUT 2127.09
I I
I I
1 I
L___ J
RI
(REA
LOT SETBACKS
NOTES:
1. FOR SOURCE BE THE DTLE. SEE DEED BOOK 3057 O PAGE 590.
2. THIS PROPERTY IS Q LOCATED IN A DESIGNATED ROOD HAZARD ZONE
AREA PER FIRM MAP #370125 0085 B. DATED MARCH 1, 1982.
3BJE
. SUCT TO THE RIGHT-OF-WAY FOR ZEB CORN ROAD (SR 1583)-
4. SUBJECT TO A NATURAL GAS LINE RICHT-OF-WAY AS SHOWN HEREON
AND ON UNRECORDED PLAT BY GARY CORN• RLS DATED FEB. 20. 1986.
S SUBJECT TO AN EASEMENT FOR THE OVERHEAD AND/OR UNDERGROUND
UTIUTIES. AS SHOWN, OR AS RECORDED.
Nrs \
45" Right lid. y
Per P/al S 5/90
-
7�7�7�j� 7j�(�j\�A\7��J �„ •,_....,r ;� „ \ CBRW T TO Ces
1C1L\UL:dLdLlVll)LL\ili R Y wlmuux
(NOTFORRECORDATION, CONVEYANCE OR SALES) -
/ lN. ALPNE
P~. ~
65' 1 33�Y 37.25"E
/ \ \*.. j O' 16. \ -50' R/9hl-ol-WDy Ae
�• - \ Per R.l Slide 5490
15.0' �`15A' / :,:•�:• /'e - \ ✓/ \\
20' Son , Sewer / / N61' 3,' 0 -157J rr,4•,CPP-1 6� \ \\ \ �j ` / \ 0
18' ED1 Slid. As Per .S` A
45'
P1.Slid. 6316 \ \ ' �.,,,,a �.,! MIDDLE STREET
R/11 /
N61' 50' 29.58"E
ALTERNATE FURN-A-ROUND v, 33.e7 Tt6TN� I}' -°°D / \I \\ -\ \AA
/
NOTE: 4VT COMBINATION OF THE ABOVE ENG°NEERI% APPROVED TYPICAL / 61 2B 3616"E / / \ \ / 1 R1 JS".I / ) \ /.F O
ELGINTEE- N, CUL-C=-SACMAND/OR AL'ERNA-S TURN -A_ MEET I.E., A NN6611 31' 03.15E \ 51.13' Sanitary Sae r I T
TEE' OR 'HAMMERHEAD' SHAPED 26L -M -SAC) THAT MEETS OR EXCF.F.pS / L. \ / /
THE TURNING RADIUS AND AREA, A5 S110WM HEREON, SHOOED BE DEEMED / 36;09 / F�4 en1 I Da'x 1• TEL
IN COMPLIANCE WITH APPROVED ENGINEERING STANDARD PRAlTICES AND
U r• x
AS SI:CH, MEETS THE HENDERSON COUNTY SUBDIVISION OP.DINANCE SECTION
wet' 3/' 3.15E
LTO -2K. ;TAP.LE I, SUBNOTE 2) AND UO -21H FOR ALTERNATE DEAD ENDS, /-
CUU-OE SAC, AND TURNAROUNDS. �q \ \ / / /\ < �/
'WE
TYPICAL ROADWAY SECTION I�I N61' 33' 31.`8' j/ \ - O\
/N6' 1'08.18\\
Ba• sb' 33.9 E-�6p 61 � 13 � -'- w Tw. � �� � �, s / \ \\y. / =' /
32.7s'- � / • \ \ \ � " V s[E otiw. ox sxccr / � / a' p Oi /�> ^ 4 r ^v yv' _
zo• r mP.rery om; I ! \ \ `_ 1a \ i/. / / I /�' / \ \. ora D m / \ -` /�
EDe. t Ae P.r / 'c•\ - - 1 \ v ./ \\`\ l \ \ i / / /� > .•v �1. ,Ec
viol sna. 6316
AND (3) .'.a '
'
�1 I 15 \`\-•/ /�x' y/-/\\\\\ Q ,^ \ �✓;% %�/1\ 3 Sig* 09' 15.12-W
• S Lr� \ STREAM �MPACT \\ / - '� / �\\\ h� ixct Wxc � � r
ROAD LENGTHS://
ROAD 1 (18' WIDE) - 835 LF ,// Pl lidos 6 \ \ I 1\\ ' �_ SIC 15' 19.12'W
ROAD 2 (18' WIDE) - 248 LF r/ „z: 6'72"
ROAD 2 (14' WIDE) - 68 LF
ROAD 3 (18' WIDE) - 150 LF lxcwaNDw `xetY („� I \ �- w ,1// \ z•TE� \. - / ,� / *.4, Via'
ewwOHrwss
"t S 19/ 12.75.W ! / ) / / / c, ` ♦ "� ._. J -
a\a;IH I I}U6 1 /��\ \i f;/-/��,n. J / '� T� � / r � � 4�D / *;, .�T1I�-� / e•_,1 I
_ ; z i'
£ \ ^/N� as' B.7s� � wsazxasl -.;. ��., azf DR a.s � /'-•` .... T.��� 1
19.97' \` -Nis is' 75•E /( ...-/ II I I l II /
N z• 1z'
44.61-W _
12=G
19.
NS <•e 12' 2026 52 ` I N82' Og' 29.72"{y J L'� 75.02. _ 1 111 � / mlo
,.. 2z 2608' 29.72'W N82' OB' 29. J2.N, N8T 08' '1_j
L -105..6•- 1 rn I
r
A (R/W Width)
4
Pipe Table
B - Pa✓emmt Width -I O I
NAME
NAME
51ZE
LENGTH
SLOPE
MATERIAL
- O
48'
25.-11'
0.50%
O HDPE P.pe
5'NPipe - (4)
42'
34,39-
j.59%
0 HDPE Pre
5VVPipe - (3)
42'
134.07'
1.65%
42 mch HDPE Pipe
5 VPIpe - (2)
60'
96.1 3'
0.50%
60 mch HDPE Pipe
5BVPpe - 0)
60'
56.76'
0.50%
60 mch HOPE Pipe
CULVERT -4
18'
49.95'
1.50%
0 RCP
CULVERT -3
18'
26.28'
1.9 %
0 RC,
CUL`..'ERT-2
15-
37.52'
133%
0 RCI
CULVERT -1
18'
36.66'2.73%
18 8,194 6,417
0 RCP
I I
I I
1 I
L___ J
RI
(REA
LOT SETBACKS
NOTES:
1. FOR SOURCE BE THE DTLE. SEE DEED BOOK 3057 O PAGE 590.
2. THIS PROPERTY IS Q LOCATED IN A DESIGNATED ROOD HAZARD ZONE
AREA PER FIRM MAP #370125 0085 B. DATED MARCH 1, 1982.
3BJE
. SUCT TO THE RIGHT-OF-WAY FOR ZEB CORN ROAD (SR 1583)-
4. SUBJECT TO A NATURAL GAS LINE RICHT-OF-WAY AS SHOWN HEREON
AND ON UNRECORDED PLAT BY GARY CORN• RLS DATED FEB. 20. 1986.
S SUBJECT TO AN EASEMENT FOR THE OVERHEAD AND/OR UNDERGROUND
UTIUTIES. AS SHOWN, OR AS RECORDED.
Nrs \
45" Right lid. y
Per P/al S 5/90
-
7�7�7�j� 7j�(�j\�A\7��J �„ •,_....,r ;� „ \ CBRW T TO Ces
1C1L\UL:dLdLlVll)LL\ili R Y wlmuux
(NOTFORRECORDATION, CONVEYANCE OR SALES) -
/ lN. ALPNE
P~. ~
65' 1 33�Y 37.25"E
/ \ \*.. j O' 16. \ -50' R/9hl-ol-WDy Ae
�• - \ Per R.l Slide 5490
15.0' �`15A' / :,:•�:• /'e - \ ✓/ \\
20' Son , Sewer / / N61' 3,' 0 -157J rr,4•,CPP-1 6� \ \\ \ �j ` / \ 0
18' ED1 Slid. As Per .S` A
45'
P1.Slid. 6316 \ \ ' �.,,,,a �.,! MIDDLE STREET
R/11 /
N61' 50' 29.58"E
ALTERNATE FURN-A-ROUND v, 33.e7 Tt6TN� I}' -°°D / \I \\ -\ \AA
/
NOTE: 4VT COMBINATION OF THE ABOVE ENG°NEERI% APPROVED TYPICAL / 61 2B 3616"E / / \ \ / 1 R1 JS".I / ) \ /.F O
ELGINTEE- N, CUL-C=-SACMAND/OR AL'ERNA-S TURN -A_ MEET I.E., A NN6611 31' 03.15E \ 51.13' Sanitary Sae r I T
TEE' OR 'HAMMERHEAD' SHAPED 26L -M -SAC) THAT MEETS OR EXCF.F.pS / L. \ / /
THE TURNING RADIUS AND AREA, A5 S110WM HEREON, SHOOED BE DEEMED / 36;09 / F�4 en1 I Da'x 1• TEL
IN COMPLIANCE WITH APPROVED ENGINEERING STANDARD PRAlTICES AND
U r• x
AS SI:CH, MEETS THE HENDERSON COUNTY SUBDIVISION OP.DINANCE SECTION
wet' 3/' 3.15E
LTO -2K. ;TAP.LE I, SUBNOTE 2) AND UO -21H FOR ALTERNATE DEAD ENDS, /-
CUU-OE SAC, AND TURNAROUNDS. �q \ \ / / /\ < �/
'WE
TYPICAL ROADWAY SECTION I�I N61' 33' 31.`8' j/ \ - O\
/N6' 1'08.18\\
Ba• sb' 33.9 E-�6p 61 � 13 � -'- w Tw. � �� � �, s / \ \\y. / =' /
32.7s'- � / • \ \ \ � " V s[E otiw. ox sxccr / � / a' p Oi /�> ^ 4 r ^v yv' _
zo• r mP.rery om; I ! \ \ `_ 1a \ i/. / / I /�' / \ \. ora D m / \ -` /�
EDe. t Ae P.r / 'c•\ - - 1 \ v ./ \\`\ l \ \ i / / /� > .•v �1. ,Ec
viol sna. 6316
AND (3) .'.a '
'
�1 I 15 \`\-•/ /�x' y/-/\\\\\ Q ,^ \ �✓;% %�/1\ 3 Sig* 09' 15.12-W
• S Lr� \ STREAM �MPACT \\ / - '� / �\\\ h� ixct Wxc � � r
ROAD LENGTHS://
ROAD 1 (18' WIDE) - 835 LF ,// Pl lidos 6 \ \ I 1\\ ' �_ SIC 15' 19.12'W
ROAD 2 (18' WIDE) - 248 LF r/ „z: 6'72"
ROAD 2 (14' WIDE) - 68 LF
ROAD 3 (18' WIDE) - 150 LF lxcwaNDw `xetY („� I \ �- w ,1// \ z•TE� \. - / ,� / *.4, Via'
ewwOHrwss
"t S 19/ 12.75.W ! / ) / / / c, ` ♦ "� ._. J -
a\a;IH I I}U6 1 /��\ \i f;/-/��,n. J / '� T� � / r � � 4�D / *;, .�T1I�-� / e•_,1 I
_ ; z i'
£ \ ^/N� as' B.7s� � wsazxasl -.;. ��., azf DR a.s � /'-•` .... T.��� 1
19.97' \` -Nis is' 75•E /( ...-/ II I I l II /
N z• 1z'
44.61-W _
12=G
19.
NS <•e 12' 2026 52 ` I N82' Og' 29.72"{y J L'� 75.02. _ 1 111 � / mlo
,.. 2z 2608' 29.72'W N82' OB' 29. J2.N, N8T 08' '1_j
L -105..6•- 1 rn I
r
A (R/W Width)
4
I
B - Pa✓emmt Width -I O I
H C (OOAC Thicbcas) 2-1
Q`D DS /welder Width 1
D (Ayfwit Tkd>wss) I
` y TYPICAL ROADWAY 5ECT14N
(N -T.5.)
Road TYpe A g C D E F
Collector 45' R/W IB' e' 1.5' 1-2 4' 2:1
Locol 45 R/W 18' 6' I.5' 1-2 4' 1.5:1
Limited Loral
30' �/W 14' 6' 1.5' 1-2 2' 1.5:1
♦r Ail rood type, ,holt hove o ditch dope in --d-wiUF Hmderscn
County Subdivision Ordir> 5ecti- 170-21C (Table 1).
*COLLECTOR ROAD:
ROAD 1 - (45' R/W - 18' WIDE PAVEMENT)
*LOCAL ROAD:
ROAD 2 AND ROAD 3 - (45' R/W - 18' WIDE PAVEMENT)
*LIMITED LOCAL ROAD:
PORTION OF ROAD 2 - (30' R/W - 14' WIDE PAVEMENT)
*ALTERNATE TURN AROUND:
SEE DETAIL THIS SHEET
5os'ol No -
This bdnes w,tFn V2 mile
F law=armla+d P.tim
Gstrict
24
W
6,319
0.145
PHASE MAP
- ^�r)
0.163
26 9,738 7,457
0.171
Phase 5 - Lot Summary
K� tl4
1HE PRIVAD RDID -'M 6H DIS RAT WY
.1 MEET TIE REQUIREMENTS a NLUDT FBI
ACffPTANLE WTD TFIE STALE ROAD SYSDM.
Lot
No.
Lot Size
(Sq. Ft.)
Lot Size w/o R/W
(Sq. Ft.)
Lot Size w/o R/W
(Acres)
30 7,143 7,134
1
6,904
4,422
0.102
2 7,006 5,256
0.121
3 7,112 5,362
0.123
4 11,698 5,471
0.126
5 8,426 4,514
0.1(4
6 7,000 5,250
0.121
7 7,004 5,254
0.121
8 8,651 6,021
0.138
9 10,340 7,312
0.168
10 8,371 7,288
0.167
11 6,800 6,800
0.156
12 6,800 6,288
0.144
13 6,800 5,900
0.135
14 7,200 5,477
0.126
15 9,365 8,150
0.187
16 12,045 8,767
0.201
17 8,731 6,945
0.159
18 8,194 6,417
0.147
19 7,656 6,903
0.158
20 7,119 6,365
0.146
21 7,307 6,507
0.149
)[11\11L'L1LL\YYILLV[�RY 22 7,322 6,396 0.147
(NOTFORRECORDATION, CONVEYANCE OR SALES) 23 6841 5971 0137
33 1 7,622_ _1 7,622
LEGEND
24
7,124
6,319
0.145
25 8,094 7,117
0.163
26 9,738 7,457
0.171
27 15,282 12,957
0.297
28 8,319 8,319
0.191
29 8,352 8,352
0.192
30 7,143 7,134
0.164
31 10,706 7,972
0.183
32 10,912 7,159
0.164
33 1 7,622_ _1 7,622
LEGEND
UTIUtt STRUCTURE
EXISTING
PROPOSED
OVERHEAD ELECTRICAL^+
^_
UNDERGROUND ELECTRICAL
NATURAL GAS
-
OVERHEAD TELEPHONE
OPTIC--
FIBER OPTIC
SANITARY SEWER
N
--_
WATER
-- --
-
'-
FORCEMAIN
•-+
CULVERT
--- _--
FIRE HYDRANT
GATE VALVE
DO
H
SEWER MANHOLE
POWER POLE
Q
X
PROPERTY ONE
--
--
-----------
MAJOR CONTOURS
MINOR CONTOURS
-------T56----
T5�
-.
TEMPORARY SILT FENCE
TEMPORARY DITCH/BERM
-��--•--
PROPOSED DISTRUBED UNITS
-
18012
3
z
HEREBY CERTIFY THAT THI:
'_AN AND SPECIFICATION
VAS PREPARED BY ME OR
INDER MY DIRECT
'A.PERVISION AAO THAT I AM
DULY REGISTERED
�RCHTECT OR ENGINEER
INDER THE UYr5 OF THE
'.TATE OF NORTH CAROLINA
,5 SIGNIFIED BY MY HAND
NO SEAL.
.ILI
C U Ur
29.72}1 O Z r
L,m
V C
PRIVATE UTILITY WATER AND W
DENSITY = 33 LOTS = 4.47 LOTS/ACRE O �t
7.38 ACRES SEWER SERVICES PROVIDED BY
A & D WATER SERVICES, LLC to
v.
IH e
ZONED R-1
TOTAL ASSESSED CURRENT OWNER: JK LAND, LLC
ACREAGE: 7.72 ACRES 636 SAGEMONT AVE
MATTHEWS, NC 28105
PARCEL NO.: 9670455031
DEED REFERENCE: DB 3057 PG 590
SCALE: 1 • = 40'
DATE: 05/29/18
DRAWN BY: JTP
Yi 111
CHECKED BY: BSR
GRAPHIC SCALE I INCA = 40 HJSP PROJECT MGR: BSR
SHEET:
1 OF 1
01
o
The Slicing Method
{
F, 71-11,1111
s,mAmT �W.SNaNrr -� -.
-- a
— NTTACHWANOT
�•.Wv TO EXISRNG IC
I T_ 4—-W
IRE£S
m
STANDARD DETAIL ALTERNATEl7EiAIL
SILT FENCE
CONSTRUCTION SPECIFlCATIONS
I:A1t�ti
,� (Nmaero) w 5D � q K s �u tk )Mvk I�w'weM �nM
r. �.�o.. mdapi u/n leve .Im�a,w�:aammmaM o,
ADDITIONAL NOTES PEGARDNG APPROVED FILL IN WETLAND
AREAS:
I . SEE PLAN INDICATING APPROVED FILL AREAS
2. INSTALL SILT FENCING AS INDICATED TO PROTECT NO
FILL WETLAND AREAS AND EXISTING STREAM.
3. ALL FILL IN WETLAND AP EA TO BE APPROVED BY
GEOTECHNICAL ENGINEER.
4. SEE COVER PAGE FOR STABILIZATION TIME FRAMES.
COVER FILLED AREAS ADJOINING REMAINING WETLANDS
WITH POLLED EROSION CONTROL PRODUCT
IMMEDIATELY UPON COMPLETION Of FILL.
• w.. my 12•
MIN
7-7
T211PORANY
GRAVEL
,mow,, ,,,,, CONSTRUCTION
A—
°A �" °'eL ENTRANCE EXPP
ICl-
CONSIRLcPpQi1GARDNS
. J e� M ntran d d -It t r
get b 1
'oots,
an a -y 9r de f Rade tl dmensxma
o.nso
3. P&drainoge 10 ,yWotmltl0 the sediment trap.
S6CIlON A - A
ave,¢
I
• w.. my 12•
MIN
7-7
T211PORANY
GRAVEL
,mow,, ,,,,, CONSTRUCTION
A—
°A �" °'eL ENTRANCE EXPP
ICl-
CONSIRLcPpQi1GARDNS
. J e� M ntran d d -It t r
get b 1
'oots,
an a -y 9r de f Rade tl dmensxma
o.nso
3. P&drainoge 10 ,yWotmltl0 the sediment trap.
1. PRuEP w M. w ._ INm m mohtah o wgo.wr, ana..
Z BEGIN ATS CTOP OE tHE CHANNEL ® NNmHaaW THE BLANKET w A 6' ES-) DEEP x 5' (I—) OFPWIDE TEMI
x sr'Oi`viE)s%SCV(AES K,wP T�ELY lt2"N(Jacm) wAY THE WTE THE
H E IUCH�BIAWC 11
A2 (Jam) va
HILL
ZR -..-
EN SEFD um COu L SECURECI, ... SOILwRH A ROW Oi' siAR£S/.AA.
z' (cam) Av _
J. ROLL RCRSOILASIET Ri I RESTON Q1 ALL BWmET5t uU5T BE I1 NOTTOKI SECUNELr TAS =EI_ E5 PO6 SIDE
AS SImWN IN THE STAPLE PA WT SYSIEu', STIPtFS/STAKES
SNWDIDI�BER RACED llwatpi EACH OF THE COLatEO W STAPLE PATiERu.
4. E CONSECu1NE "KENS END TAKEN ENO (SHINGLE Stn£) NADA 4'- T(IOcm-ISm�)NOVENIM. USE A DDVE- ROW OF
a (lam) nPARr AND A- (Tuan) ON .ENTER Ta s RE ow,KErs.
3. FULLLlfWT11 E— W BLNNKES AT TOP OF — SLOPED .UST DE ANCHCRED WRIT A NOW OF STAPLES/STNKES APPftp%IWTELr
2" (Jam) APART INA O" C—) DEEP x 6' (1—) — TRENCH. BACKDLL AND CW PACT THE TRENCH AFTER SAPLTR.
8. ADJACENT BLWNEIs OUST BE LyhRIMPED APPN0MIM 2'-5' (5.m am) (DEPS G ON BLANKET —E) AND STA0.E0.
r0 ENSURE PROPER SEAN AWNNENI, i—E THE EDGE OF THE —LAPPING BLANKET (BL RKET BEING INSfN1ID ON TOP) EVEN
y. 11 OGN A OOU9ELLROwCOF SrAREs HANNEL nAAGGENRED a (tam) MART ANDE CHECK SLOT SAp III-) ONDCAENIEJR WETO N E1- FORT1r01
`I' 01 trtERv✓�.O USE
6. THE iEANlNA1 Elm OF THE eT.wXEIs .NIST eE ANCIaR �wIM A N_ OF STAPLES/STUK6 APENTS.:I.r 12• (JOwn) APART
M�6• ((11—) DEEP X 6" (1—) WIDE THENED BA4l( LL AND CONPACT THE THENEN A -P STARING
A.o DANA sEwS ceROILAi PoINIST N➢NG THEMTO�S ECIU� THE
12 E
BUTTON/SIDE STAKE 1-1 SDL COLD DID USE OF ST w
B sLDPE wOICES R IN
NGms GRFw I- (t3 cm
g NECESSJ f TO
PROPERL, ANCNaR TE NE15.
D
THAN 1. IRANNFE_ 5HAD. DE R— LINTED.
�., LESS THAN T; CHARNEL SNW1 BE UNED WM --S" ON EWNNINT ArIIH RIP RAP CHECKOW EVERY b FEET.
PIPE BEDDING DETAIL
RCP & HDPE
/ PHT�An rAelec
SECTION A
GRAVEL
DITCH INLET
SEDIMENT BARRIER
CONSTRUCTION SPECIFICATIONS
. Platt lM1. etme dopa toward lhs inlet ala J:1 or hatter dope. A
m1 foot Wde level area set 4 Inches bb.. IM1e dray Inlet Gee
Will aM Nrther prolectbn agal.t me __ of material.
2 Slone w lb. elope tawmd It. inlet ehauld he 3 FCM1.a a I— Ia
.lahilk' and 1 NCM1 a smaller On the .IOpe away hom me Inlet to
— •ow rale.
3 WFe aM1 With 2 Inch w—g. may M placed o.r the train
g Dbg. Wt mutt M inWected frequently to ovoid hlockage by Rr..h.
Aw,ENANGL
e.d.d�waA• ol.°e M
5' d.,p olvM.
nc Y t mdntw a Mrhb' r �� m
'�m� qm Imo momoh
-A, dmw,
,r n. •..m n« �,
CATIODS
•* me �n /n (w•wa) a w(e (ave
STANDARD DETAIL�^'••���,Iq'"�
SILT FENCE
p„p� W Wam ea nNA. WITH OUTLET
WEIR
per cell r.penNan N n..w Iw aucrnalul ned flerminatlon arM r
bll.hm.If la yNo n.c.,vry (Or „tabll,hm.l of rooNd ,prig., ,od and
My picn.
1ic. H.wlly campacf.d colla pnv.nl air, nulrt.nta and molaNr.
aIle cal IIIllzabb-and —by
r.ducNondvfglu, p moln}w, pllcaf a r. Th.nt
igu y prapvr.d roll Mtl_ Fdlowlnq ar. IM r.gulr.menta (or pnpara n
aroma to b. v.fl.tor.A by 9 ,Ind, apTb,,Hg, aoddlnq, and/ar plonllr a1
P .D. for pdmory/p.rmvmnl —bill.— shall not b.lib until all
.Onalrucllon ane utillh Work Wilhln m. pnpvnlivn arao 1. cvmpler..
I .ver, it mvyww n... an to pr.pvn lar nun. c P. Pr Iv
pNNon of atncllvn d In tv I011on vl NIINNa.
A `_ _"rO.partm.nt of Agrlcultur. Salla T(vr -1)-11. vblaln,d iw oil vreo. to h. .d.d, aprlgq.d, aodd.L er pl-bid.
m.nd.d foHliz.r and pH adi-Ing pradu.N .hall b. 1--
,I IM pn Ia ansa and —NII bb.—I per M. Nat
All ono, Iv M ,.Md or planl.d .hall b. .11-.p.c
dpp.d f0 a d.pM lfl.d
n 16. apprond Pmn,. Oondnctivn ,pu.no ana/ar c:.—EA.. bid
at. Rlppinfl contlah of coating iNaum Ina crtn-crvaa Pa Tb am
,olio aurlatt ulllizinq an Tmplemenf iMl will 1 glaz. m. aid.
Na of Rh.
N.A.— sit. pnpa 11 . Ihat dwa oaf campy Wlm env.
u mb shall not b. accbptabl.. Th. tl.pM of tall pnpa.— may
«.Nbli,h.d as a nnq. and on Th. Oppmrol of M. rM.wlrg alai. ar
cal Ofl.ncY. Onc. Mll.d or ripp.d a...rdlnq I. m. appy d plan, all
. Iv b. nmm.d Iv th. appdr d fl.., grad.. PH m fl.n O.d4.1
IMT roll amantlmmta ap.lil.d In . ,ol t.al, can M pdd.d dudny m.
oit pr.porallon yroc.dun or d, 1-
- ,fano larq.r Ihvn Ihr.. (J) I—_ an any .id., .11th,, -fl. and th.,
Mmnwua mar.dala that ,arra.. during m. b.d pnpamgon shall b.
bb—
h. M S..d.d:
na TIII or tlN. th. prpand ana, I. ba. d to , um L.pth v r
1) Inch.. F- .tvn a I—, Ihvn 1h .. (J) Inchn oln arty .Id.. .Ilcl..
— and oM..xman... A ma -1. 1— a
s
, ve. It not Inc— ... l.d
.ring Th. roll 1,— ... I- pros.., add pHmodlfl.r vnd (ertillz.n al th.
0..p..lfl.d In th. ..It K. npmt.
R. -compact M. a uNllzln9 a c b1pacb. -H., Th. flnl.h.d rad. ,hell
Doth . .oil r�urta<e w Ih a loon, unlfonnlY fin. I—— All
dg.•and d,pn. ,hall b. -.d vnd Nll.d 10 -Ad. 1h. appr..d
rrtace dralnaq.. S..dlny of gmaee .,..A I. is M can. Imm.dlafar rib
n h.d grin.. an abt.b.d and ..db.d p ...IT.. 1. -.0-d-
_..1
v.0-d.
X1FIm IZrd1a JUK.) MI[NYaMA w aN
svert ,� cowl rs W m
RIcuUINLL UNL61pxE ANI zSOLTA/AGE Io -,O -,p H uR,ACR[ AWND
Ar.tr 4opo u/Acle snNW. Axexat — - _A` W1m Ate_
,Linux u. rz TE �u/ACAS
_RhDm ATA u/AGF. -srLwu snNxcxAss uxr ME
u/AcROuxo
wmclArv.AL uuEsmx[ Aro oaf u/ux[ lO-,O-Io D.—.D.—..
W_b.
N
Ni— _ROR. — A aslt wrtNNADE SETNFoeY S1.AId1 TAN
.� w EAasgll tt p
E /ACNE)
F,W,A�=4A " pRpDNa R..-
A.-
THK I.—
(uoamws) mLxn w are awuAm G
Nwrsm/Aa
snlalal a �vawllc rw>. s
wu«oiC6r,su,eEouxucE toawaauu sw.J vcAR eooL
Ab_rAxxaNAr)
iIPEEr(JINC 6,
"" ° A, � KEOP IN T., =o.1a1
wAR 1.1 io - 1 Ee) It—
_1=0=1_0) wENE3
IF 1.bC1Zr%FIIl 11. 711
18012
SCALE: N.T.S.
DATE: 02/05/18
DRAWN BY: JTP
CHECKED BY: BSR
PROJECT MGR: BSR
e•1
I
1 I A
��� •li= o
01 py\i
�
.
I
O
1. PRuEP w M. w ._ INm m mohtah o wgo.wr, ana..
Z BEGIN ATS CTOP OE tHE CHANNEL ® NNmHaaW THE BLANKET w A 6' ES-) DEEP x 5' (I—) OFPWIDE TEMI
x sr'Oi`viE)s%SCV(AES K,wP T�ELY lt2"N(Jacm) wAY THE WTE THE
H E IUCH�BIAWC 11
A2 (Jam) va
HILL
ZR -..-
EN SEFD um COu L SECURECI, ... SOILwRH A ROW Oi' siAR£S/.AA.
z' (cam) Av _
J. ROLL RCRSOILASIET Ri I RESTON Q1 ALL BWmET5t uU5T BE I1 NOTTOKI SECUNELr TAS =EI_ E5 PO6 SIDE
AS SImWN IN THE STAPLE PA WT SYSIEu', STIPtFS/STAKES
SNWDIDI�BER RACED llwatpi EACH OF THE COLatEO W STAPLE PATiERu.
4. E CONSECu1NE "KENS END TAKEN ENO (SHINGLE Stn£) NADA 4'- T(IOcm-ISm�)NOVENIM. USE A DDVE- ROW OF
a (lam) nPARr AND A- (Tuan) ON .ENTER Ta s RE ow,KErs.
3. FULLLlfWT11 E— W BLNNKES AT TOP OF — SLOPED .UST DE ANCHCRED WRIT A NOW OF STAPLES/STNKES APPftp%IWTELr
2" (Jam) APART INA O" C—) DEEP x 6' (1—) — TRENCH. BACKDLL AND CW PACT THE TRENCH AFTER SAPLTR.
8. ADJACENT BLWNEIs OUST BE LyhRIMPED APPN0MIM 2'-5' (5.m am) (DEPS G ON BLANKET —E) AND STA0.E0.
r0 ENSURE PROPER SEAN AWNNENI, i—E THE EDGE OF THE —LAPPING BLANKET (BL RKET BEING INSfN1ID ON TOP) EVEN
y. 11 OGN A OOU9ELLROwCOF SrAREs HANNEL nAAGGENRED a (tam) MART ANDE CHECK SLOT SAp III-) ONDCAENIEJR WETO N E1- FORT1r01
`I' 01 trtERv✓�.O USE
6. THE iEANlNA1 Elm OF THE eT.wXEIs .NIST eE ANCIaR �wIM A N_ OF STAPLES/STUK6 APENTS.:I.r 12• (JOwn) APART
M�6• ((11—) DEEP X 6" (1—) WIDE THENED BA4l( LL AND CONPACT THE THENEN A -P STARING
A.o DANA sEwS ceROILAi PoINIST N➢NG THEMTO�S ECIU� THE
12 E
BUTTON/SIDE STAKE 1-1 SDL COLD DID USE OF ST w
B sLDPE wOICES R IN
NGms GRFw I- (t3 cm
g NECESSJ f TO
PROPERL, ANCNaR TE NE15.
D
THAN 1. IRANNFE_ 5HAD. DE R— LINTED.
�., LESS THAN T; CHARNEL SNW1 BE UNED WM --S" ON EWNNINT ArIIH RIP RAP CHECKOW EVERY b FEET.
PIPE BEDDING DETAIL
RCP & HDPE
/ PHT�An rAelec
SECTION A
GRAVEL
DITCH INLET
SEDIMENT BARRIER
CONSTRUCTION SPECIFICATIONS
. Platt lM1. etme dopa toward lhs inlet ala J:1 or hatter dope. A
m1 foot Wde level area set 4 Inches bb.. IM1e dray Inlet Gee
Will aM Nrther prolectbn agal.t me __ of material.
2 Slone w lb. elope tawmd It. inlet ehauld he 3 FCM1.a a I— Ia
.lahilk' and 1 NCM1 a smaller On the .IOpe away hom me Inlet to
— •ow rale.
3 WFe aM1 With 2 Inch w—g. may M placed o.r the train
g Dbg. Wt mutt M inWected frequently to ovoid hlockage by Rr..h.
Aw,ENANGL
e.d.d�waA• ol.°e M
5' d.,p olvM.
nc Y t mdntw a Mrhb' r �� m
'�m� qm Imo momoh
-A, dmw,
,r n. •..m n« �,
CATIODS
•* me �n /n (w•wa) a w(e (ave
STANDARD DETAIL�^'••���,Iq'"�
SILT FENCE
p„p� W Wam ea nNA. WITH OUTLET
WEIR
per cell r.penNan N n..w Iw aucrnalul ned flerminatlon arM r
bll.hm.If la yNo n.c.,vry (Or „tabll,hm.l of rooNd ,prig., ,od and
My picn.
1ic. H.wlly campacf.d colla pnv.nl air, nulrt.nta and molaNr.
aIle cal IIIllzabb-and —by
r.ducNondvfglu, p moln}w, pllcaf a r. Th.nt
igu y prapvr.d roll Mtl_ Fdlowlnq ar. IM r.gulr.menta (or pnpara n
aroma to b. v.fl.tor.A by 9 ,Ind, apTb,,Hg, aoddlnq, and/ar plonllr a1
P .D. for pdmory/p.rmvmnl —bill.— shall not b.lib until all
.Onalrucllon ane utillh Work Wilhln m. pnpvnlivn arao 1. cvmpler..
I .ver, it mvyww n... an to pr.pvn lar nun. c P. Pr Iv
pNNon of atncllvn d In tv I011on vl NIINNa.
A `_ _"rO.partm.nt of Agrlcultur. Salla T(vr -1)-11. vblaln,d iw oil vreo. to h. .d.d, aprlgq.d, aodd.L er pl-bid.
m.nd.d foHliz.r and pH adi-Ing pradu.N .hall b. 1--
,I IM pn Ia ansa and —NII bb.—I per M. Nat
All ono, Iv M ,.Md or planl.d .hall b. .11-.p.c
dpp.d f0 a d.pM lfl.d
n 16. apprond Pmn,. Oondnctivn ,pu.no ana/ar c:.—EA.. bid
at. Rlppinfl contlah of coating iNaum Ina crtn-crvaa Pa Tb am
,olio aurlatt ulllizinq an Tmplemenf iMl will 1 glaz. m. aid.
Na of Rh.
N.A.— sit. pnpa 11 . Ihat dwa oaf campy Wlm env.
u mb shall not b. accbptabl.. Th. tl.pM of tall pnpa.— may
«.Nbli,h.d as a nnq. and on Th. Oppmrol of M. rM.wlrg alai. ar
cal Ofl.ncY. Onc. Mll.d or ripp.d a...rdlnq I. m. appy d plan, all
. Iv b. nmm.d Iv th. appdr d fl.., grad.. PH m fl.n O.d4.1
IMT roll amantlmmta ap.lil.d In . ,ol t.al, can M pdd.d dudny m.
oit pr.porallon yroc.dun or d, 1-
- ,fano larq.r Ihvn Ihr.. (J) I—_ an any .id., .11th,, -fl. and th.,
Mmnwua mar.dala that ,arra.. during m. b.d pnpamgon shall b.
bb—
h. M S..d.d:
na TIII or tlN. th. prpand ana, I. ba. d to , um L.pth v r
1) Inch.. F- .tvn a I—, Ihvn 1h .. (J) Inchn oln arty .Id.. .Ilcl..
— and oM..xman... A ma -1. 1— a
s
, ve. It not Inc— ... l.d
.ring Th. roll 1,— ... I- pros.., add pHmodlfl.r vnd (ertillz.n al th.
0..p..lfl.d In th. ..It K. npmt.
R. -compact M. a uNllzln9 a c b1pacb. -H., Th. flnl.h.d rad. ,hell
Doth . .oil r�urta<e w Ih a loon, unlfonnlY fin. I—— All
dg.•and d,pn. ,hall b. -.d vnd Nll.d 10 -Ad. 1h. appr..d
rrtace dralnaq.. S..dlny of gmaee .,..A I. is M can. Imm.dlafar rib
n h.d grin.. an abt.b.d and ..db.d p ...IT.. 1. -.0-d-
_..1
v.0-d.
X1FIm IZrd1a JUK.) MI[NYaMA w aN
svert ,� cowl rs W m
RIcuUINLL UNL61pxE ANI zSOLTA/AGE Io -,O -,p H uR,ACR[ AWND
Ar.tr 4opo u/Acle snNW. Axexat — - _A` W1m Ate_
,Linux u. rz TE �u/ACAS
_RhDm ATA u/AGF. -srLwu snNxcxAss uxr ME
u/AcROuxo
wmclArv.AL uuEsmx[ Aro oaf u/ux[ lO-,O-Io D.—.D.—..
W_b.
N
Ni— _ROR. — A aslt wrtNNADE SETNFoeY S1.AId1 TAN
.� w EAasgll tt p
E /ACNE)
F,W,A�=4A " pRpDNa R..-
A.-
THK I.—
(uoamws) mLxn w are awuAm G
Nwrsm/Aa
snlalal a �vawllc rw>. s
wu«oiC6r,su,eEouxucE toawaauu sw.J vcAR eooL
Ab_rAxxaNAr)
iIPEEr(JINC 6,
"" ° A, � KEOP IN T., =o.1a1
wAR 1.1 io - 1 Ee) It—
_1=0=1_0) wENE3
IF 1.bC1Zr%FIIl 11. 711
18012
SCALE: N.T.S.
DATE: 02/05/18
DRAWN BY: JTP
CHECKED BY: BSR
PROJECT MGR: BSR
STORMWATER CALCULATIONS
REVISED
WHITE OAK PHASE 5 DEVELOPMENT
STORM WATER ANALYSIS
X LAND, LLC
Henderson County, North Carolina
August 13, 2018
1
Odom
Engineering
PLLC
NC FIRM# P-0880
169 Oak Street
Forest City, N.C. 28043
828-247-4495
TABLE OF CONTENTS
Summary.......................................................................................................................................................................................1
USGSMap..............................................................................................................................................................................................2
BasinModel & Calculations...................................................................................................................................................................3
AdditionalMaterials............................................................................................................................................................................57
SUMMARY OF STORMWATER HYDROLOGICAL ANALYSIS
The purpose of the enclosed evaluation is to analyze changes in storm drainage resulting from proposed development designated as
White Oak Phase 5, in Henderson County North Carolina, in order to ensure no degradation to downstream or internal stream
channels from the project.
Computer modeling of stormwater volume rates was performed using Hydrology Studio 2018 v2.0.0.52. Study and summary are
based on 10 -year design storm, but calculation results are also included for the 1 -year and 25 -year design storms.
Preconstruction topography of the area shows that there exist three distinct drainage areas and drainage exits from the site area.
These are labeled PRE -A, PRE -B and PRE -C in the accompanying drawings. An additional point of specific interest is the endpoint of
stream impact (PRE -STREAM POINT D), also the location of the proposed stormwater pipe outlet.
The post construction drainage modeling uses similar labeling.
Referring to the calculations summary below, Initial model results showed increased stormwater volume rates at the Southwest site
exit (10 -year peak 77.51 CFS to 89.87 CFS), and at the site of the culvert discharge at the Stream impact site (72.33 CFS to 78.07 CFS).
Modeling indicates that stormwater detention could be used to reduce peak volume rates for the POST -A site exit and at the POST -
STREAM POINT D, the stormwater pipe outlet, to below Pre -development levels.
It is proposed that stormwater velocity reduction will be accomplished using storage in the stormwater piping, with an outlet control
structure engineered to detain and release the storm water at below pre -development rates.
Post B and C 10 -year volume rates are slightly increased over Pre -Development but remain quite low for the 10 -year peaks — 4.30
CFS for Post -B and 1.51 CFS for Post C. Channel models provided in this report show non-erosive velocities for these discharge
points.
The calculations included with this report are summarized below.
CALCULATIONS SUMMARY (10 -Year Storm)
DRAINAGE AREA
PRE (cfs)
POST (cfs)
ROUTED (cfs)
BMP TYPE
PRE — A (Southwest)
77.51
POST - A
89.87
75.82
Pipe w/ Outlet
Control
PRE — B (Southeast)
2.10
POST - B
4.30
None Req'd
PRE — C (West)
0.79
POST - C
1.51
None Req'd
PRE — POINT D (Stream)
72.33
POST— POINT D
78.07
66.38
Pipe w/ Outlet
Control
Computer modeling of stormwater volume rates was performed using Hydrology Studio 2018 v2.0.0.52. Study and summary are
based on 10 -year design storm, but calculation results are also included for the 1 -year and 25 -year design storms.
Page 1
ft -%-V-
. Ap", l-, -)�
� KAMAIMENINIF y"T f OMMW.";,�WW� -:2
u 40�
V- 41
k
Basin Model
Hydrology Studio v 2.0.0.53
FRE r fVP PRE -A-48"EXIT
POST C
POST -AB CULVERT
POST CULVERT 4
PRE STREAM POINT D
4
POST OVERLAND PT D
Post Stream Point D
.f
POST CENTRAL
..
:PIPE+OU LET CONTROL
48" EXIT FROM SITE
-3-
Project Name: White Oak Ph 5
08-13-2018
PRE - 8 {SE)
POST -
POST CH -8
i
�I
Hydrograph by Return Period
Hydroloqy Studio v 2.0.0.53
Project Name: White Oak Ph 5
08-13-2018
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak Outflow (cfs)
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
1
Rational
PRE - A - 48" EXIT
48.27
77.51
88.72
2
Rational
PRE - B (SE)
1.309
2.103
2.406
3
Rational
POST - B
2.678
4.301
4.922
4
Rational
POST CH -8
0.847
1.360
1.557
5
Rational
POST -AB CULVERT
46.72
75.02
85.87
6
Rational
POST CULVERT 4
2.083
3.345
3.828
7
Rational
POST C
0.939
1.507
1.725
8
Rational
POST CENTRAL
6.318
10.15
11.61
9
Rational
PRE C (W)
0.494
0.794
0.909
10
Rational
PRE STREAM POINT D
45.05
72.33
82.79
11
Rational
POST OVERLAND PT D
1.900
3.051
3.492
12
Pond Route
PIPE+OUTLET CONTROL
39.97
63.94
71.96
13
Junction
48" EXIT FROM SITE
47.37
75.82
85.56
14
Junction
Post Stream Point D
41.49
66.38
74.75
-4-
Hydrograph 1 -yr Summary
Hydroloqy Studio v 2.0.0.53
Project Name: White Oak Ph 5
08-13-2018
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1
Rational
PRE - A - 48" EXIT
48.27
0.08
14,482
----
2
Rational
PRE - B (SE)
1.309
0.08
393
----
3
Rational
POST - B
2.678
0.08
804
----
4
Rational
POST CH -8
0.847
0.08
254
----
5
Rational
POST -AB CULVERT
46.72
0.08
14,017
----
6
Rational
POST CULVERT 4
2.083
0.08
625
----
7
Rational
POST C
0.939
0.08
282
----
8
Rational
POST CENTRAL
6.318
0.08
1,896
----
9
Rational
PRE C (W)
0.494
0.08
148
----
10
Rational
PRE STREAM POINT D
45.05
0.08
13,515
----
11
Rational
POST OVERLAND PT D
1.900
0.08
570
----
12
Pond Route
PIPE+OUTLET CONTROL
39.97
0.10
14,079
5
2129.41
3,037
13
Junction
48" EXIT FROM SITE
47.37
0.10
16,854
4, 6, 8, 12
14
Junction
Post Stream Point D
41.49
0.10
14,649
11,12
-5-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - A - 48" EXIT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 1
Hydrograph Type = Rational
Peak Flow
= 48.27 cfs
Storm Frequency = 1 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 14,482 cuft
Drainage Area = 24.52 ac
Runoff Coeff.
= 0.43*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
6.3 0.22 lawn/clay soils/avg grades
0.102 0.15 wooded
18.12 0.50 Single Family Residential
24.52 0.43 Weighted Average
54
52
50
48
46
44
42
40
38
36
34
32
30
28
CY 26
24
22
20
18
16
14
12
10
8
6
4
2
0
0
QP = 48.27 ds
1 2 3 4 5 6 7 8 9 10
Time (min)
-6.
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - B (SE)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 2
Hydrograph Type = Rational
Peak Flow = 1.309 cfs
Storm Frequency = 1 -yr
Time to Peak = 0.08 hrs
Time Interval = 1 min
Runoff Volume = 393 cuft
Drainage Area = 1.3 ac
Runoff Coeff. = 0.22*
Tc Method = User
Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf
Intensity = 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.295 0.22 LAWN AVG GRADES, CLAY LOAM
1.3 0.22 Weighted Average
QP = 1.31 ds
2-
1.9-
1.91.81.71.61.51.41.31.20.90.80.70.6
1.8-
1.7-
1.6-
1.5-
1.4-
1.3-
1.2-
0.9-
0.8-
0.7-
0.6-
0.5-
.50.40.30.20.10
000F
0.4-
0.3-
0.2-
0.1-
0
0 1 2 3
4 5 6 7 8
9 10
Time (min)
-7-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - B
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 3
Hydrograph Type = Rational
Peak Flow
= 2.678 cfs
Storm Frequency = 1 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 804 cuft
Drainage Area = 1.17 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.17 0.50 Single Family Residential
1.17 0.50 Weighted Average
V
CY
3
2
I
QP = 2.68 ds
1 2 3 4 5 6 7 8 9 10
Time (min)
-8-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CH -8
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 4
Hydrograph Type = Rational
Storm Frequency = 1 -yr
Time Interval = 1 min
Drainage Area = 0.37 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 0.847 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 254 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 4.5786 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.372 0.50 Single Family Residential
0.37 0.50 Weighted Average
1-T
QP = 0.85 ds
0.9s-
0.9
0.85-
.850.80.750.7
0.8-
0.75-
-
1-7
0.7
OF
0.65-
.650.60.55
0.6-
0.55
0.5
0.45-
.450.40.350.3
0.4-
0.35-
0.3
0.25
0.2
IL
0.15-
.150.10.05
0.1-
0.05
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-9-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - AB CULVERT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 5
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
IDF Curve
Freq. Corr. Factor
= Rational
= 1 -yr
= 1 min
= 20.41 ac
= User
= Hendersonville. idf
= 1.00
Peak Flow = 46.72 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 14,017 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 4.5786 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
19.98 0.50 AB -4
0.35 0.50 AB -3
0.08 0.50 AB -2
20.41 0.50 Weighted Average
QP = 46.72 ds
52-
2504846444240383634
50-
48-
46-
44-
42-
40-
38-
36-
34-
23028 32-
30-
28-
26
CY
24
22-
220181614
20-
18-
16-
14-
12-
210864
10-
8-
6-
4
2
0
0 1
2 3
4 5 6 7 8
Time (min)
9 10
-10-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CULVERT 4
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 6
Hydrograph Type = Rational
Peak Flow
= 2.083 cfs
Storm Frequency = 1 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 625 cuft
Drainage Area = 0.91 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.91 0.50 Single Family Residential
0.91 0.50 Weighted Average
V
0
3
2
1
QP = 2.08 ds
we,
1 2 3 4 5 6 7 8 9 10
Time (min)
-11-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST C
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 7
Hydrograph Type = Rational
Storm Frequency = 1 -yr
Time Interval = 1 min
Drainage Area = 0.41 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 0.939 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 282 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 4.5786 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA(ac) C DESCRIPTION
0.41 0.50 Single Family Residential
0.41 0.50 Weighted Average
1
QP = 0.94 ds
0.9s-
0.9
0.8S-
.850.80.75
0.8-
0.7S -
0.7
0.65
0.6
Jor
0.55
0.5
OAS-
.450.40.350.3
0.4-
0.3S-
0.3 -
0.2S-
.250.20.1
0.2-
0.1
0.1 -
0.0s
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-12-
Hydrograph Report
Project Name: White Oak Ph 5
Hydrology Studio v 2.0.0.53 08-13-2018
POST CENTRAL Hyd. No. 8
Hydrograph Type = Rational
Peak Flow
= 6.318 cfs
Storm Frequency = 1 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 1,896 cuft
Drainage Area = 2.76 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
2.76 0.50 Single Family Residential
2.76 0.50 Weighted Average
QP = 6.32 ds
7
5
4
NV
V
3
2
1
we
1 2 3 4 5 6 7 8 9 10
Time (min)
-13-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE C (W)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 9
Hydrograph Type = Rational
Peak Flow
= 0.494 cfs
Storm Frequency = 1 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 148 cuft
Drainage Area = 0.3 ac
Runoff Coeff.
= 0.36*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 4.5786 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.15 0.50 Single Family Residential
0.15 0.22 Lawn, avg grades, Clay Loam
0.3 0.36 Weighted Average
0.48
0.44
0.4
0.36
0.32
0.28
Cy 0.24
0.2
0.16
0.12
0.08
0.04
0
0
QP = 0.49 ds
1 2 3 4 5 6 7 8 9 10
Time (min)
-14-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE STREAM POINT D
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 10
Hydrograph Type = Rational
Storm Frequency = 1 -yr
Time Interval = 1 min
Drainage Area = 21.39 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 45.05 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 13,515 cuft
Runoff Coeff. = 0.46*
Time of Conc. (Tc) = 5.0 min
Intensity = 4.5786 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
18.12 0.50 Single Family Res
3.27 0.22 Lawn, Avg Grades, Clay Loam
21.39 0.46 Weighted Average
50-
48-
0484644424038363432
QP = 45.05 ds
46-
44-
42-
40-
38-
36-
34-
32-
30
28
v 26
CY
24-
4222018
22-
20-
18
16-
14—
12-
210864
10-
8-
6-
4-
2
IF
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-15-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST OVERLAND PT D
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
IDF Curve
Freq. Corr. Factor
2
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
0
= Rational
= 1 -yr
= 1 min
= 0.83 ac
= User
=
Hendersonville. idf
= 1.00
QP = 1.90 ds
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 11
Peak Flow
= 1.900 cfs
Time to Peak
= 0.08 hrs
Runoff Volume
= 570 cuft
Runoff Coeff.
= 0.5
Time of Conc. (Tc)
= 5.0 min
Intensity
= 4.5786 in/hr
Asc/Rec Limb Factors
= 1/1
1 2 3 4 5 6 7 8 9 10
Time (min)
-16-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PIPE+OUTLET CONTROL
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 12
Hydrograph Type = Pond Route Peak Flow = 39.97 cfs
Storm Frequency = 1 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 14,079 cuft
Inflow Hydrograph = 5 - POST - AB CULVERT Max. Elevation = 2129.41 ft
Pond Name = PIPE WITH OUTLET CONTROL Max. Storage = 3,037 cuft
Pond Routing by Storage Indication Method Center of mass detention time = 1 min
QP = 39.97 ds
52
50
48
46
44
42
40
38
36
34
32
30
28
w
� 26
24---
22---
A
20
18
16
14
12-
210864
10-
8-
6-
4
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Time (min)
Req'd Stor POST - AB CULVERT — PIPE+OUTLET CONTROL
-17-
Pond Report
Hydrology Studio v 2.0.0.53
PIPE WITH OUTLET CONTROL
Underground Chambers
Stage
Description
Input
Invert Elev Down, ft
2126.23
Chamber Rise, ft
5.00
Chamber Shape
Circular
Chamber Span, ft
5.00
Barrel Length, ft
156.00
No. Barrels
1
Barrel Slope, %
0.50
Headers, y/n
No
Stone Encasement, y/n
No
Encasement Bottom Elevation, ft
0.00
Encasement Width per Chamber, ft
0.00
Encasement Depth, ft
0.00
Encasement Voids, %
40.00
2133
2132
2131
-2130
v
"' 2129
2128
2127
2126
0
Project Name: White Oak Ph 5
08-13-2018
Stage -Storage
Stage / Storage Table
Stage
Elevation
Contour Area
Incr. Storage
Total Storage
(ft)
(ft)
(sqft)
(cuft)
(cuft)
0.00
2126.23
n/a
0.000
0.000
0.29
2126.52
n/a
11.9
11.9
0.58
2126.81
n/a
46.1
57.9
0.87
2127.10
n/a
103
161
1.16
2127.39
n/a
145
305
1.45
2127.68
n/a
172
477
1.73
2127.96
n/a
191
668
2.02
2128.25
n/a
205
873
2.31
2128.54
n/a
214
1,087
2.60
2128.83
n/a
221
1,308
2.89
2129.12
n/a
224
1,532
3.18
2129.41
n/a
224
1,756
3.47
2129.70
n/a
221
1,977
3.76
2129.99
n/a
214
2,192
4.05
2130.28
n/a
205
2,396
4.34
2130.57
n/a
191
2,587
4.62
2130.85
n/a
171
2,759
4.91
2131.14
n/a
145
2,904
5.20
2131.43
n/a
102
3,006
5.49
2131.72
n/a
46.0
3,052
5.78
2132.01
n/a
11.8
3,064
Stage -Storage
500 1000 1500 2000 2500
Total Storage (cuft)
- UG Chambers Top of Pond
-18-
6
5
4
Ln
ro
3
2
1
0
Pond Report
Project Name: White Oak Ph 5
Hydrology Studio v 2.0.0.53 08-13-2018
PIPE WITH OUTLET CONTROL Stage -Discharge
Culvert / Orifices
Rise, in
Span, in
No. Barrels
Invert Elevation, ft
Orifice Coefficient, Co
Length, ft
Barrel Slope, %
N -Value, n
Weirs
Shape / Type
Crest Elevation, ft
Crest Length, ft
Angle, deg
Weir Coefficient, Cw
*Routes through Culvert
2132-
132
2131-
2131-
2130-
2129-
2130-2129-
2128-
2128-
2127-
2127-
3.3
Stage -Discharge
5
4
Ln
3
2
1
. - — : - : - : . : - : . : . : . : . : - : . : - : . : - : - f- 0
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Discharge (cfs)
— Top of Pond Culvert — Orifice — Rectangular Total Q
-19-
Orifices
Culvert
Perforated Riser
1
2 3
48
26
Perf. Rise, in
48
26
Perf. Span, in
1
1
No. Perforations
2126.23
2126.24
Invert Elevation, ft
.6
.6
Height, ft
25
Orifice Coefficient, Co
1
0.013
Weirs
Riser*
Ancillary
1
2 3
Circular
Rectangular
Exfiltration, in/hr
2131.23
Tailwater Elevation, ft
4
3.3
Stage -Discharge
5
4
Ln
3
2
1
. - — : - : - : . : - : . : . : . : . : - : . : - : . : - : - f- 0
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Discharge (cfs)
— Top of Pond Culvert — Orifice — Rectangular Total Q
-19-
Pond Report
Hydrology Studio v 2.0.0.53
PIPE WITH OUTLET CONTROL
Project Name: White Oak Ph 5
08-13-2018
Stage -Storage -Discharge Summary
Stage
(ft)
Elev.
(ft)
Storage
(cuft)
Culvert
(cfs)
Orifices, cfs
Riser
(cfs)
weirs, cfs
Pf Riser
(cfs)
Exfil
(cfs)
User
(cfs)
Total
(cfs)
1
2
3
1
2
3
0.00
2126.23
0.000
0.00
0.00
0.00
0.00
0.29
2126.52
11.9
0.745 is
0.502
0.00
1.246
0.58
2126.81
57.9
2.906 is
1.982
0.00
4.888
0.87
2127.10
161
6.023 oc
4.276
0.00
10.30
1.16
2127.39
305
9.244 oc
7.216
0.00
16.46
1.45
2127.68
477
12.76 oc
10.58
0.00
23.33
1.73
2127.96
668
16.40 oc
14.06
0.00
30.47
2.02
2128.25
873
20.12 oc
17.25
0.00
37.37
2.31
2128.54
1,087
23.82 oc
19.60
0.00
43.41
2.60
2128.83
1,308
27.45 oc
21.80
0.00
49.25
2.89
2129.12
1,532
30.89 oc
23.79
0.00
54.68
3.18
2129.41
1,756
34.05 oc
25.63
0.00
59.68
3.47
2129.70
1,977
36.77 oc
27.35
0.00
64.13
3.76
2129.99
2,192
38.86 oc
28.97
0.00
67.83
4.05
2130.28
2,396
43.06 oc
30.50
0.00
73.56
4.34
2130.57
2,587
60.54 oc
31.96
0.00
92.50
4.62
2130.85
2,759
74.01 oc
33.35
0.00
107.4
4.91
2131.14
2,904
85.37 oc
34.69
0.00
120.1
5.20
2131.43
3,006
95.38 oc
35.98
1.198
132.6
5.49
2131.72
3,052
104.4 oc
37.22
4.541
146.2
5.78
2132.01
3,064
112.8 oc
38.43
9.094
160.3
Suffix key., is = inlet control, oc = outlet control, s = submerged weir -20-
Pond Report Project Name: White Oak Ph 5
Hydrology Studio v 2.0.0.53
PIPE WITH OUTLET CONTROL
08-13-2018
Pond Drawdown
Stage (ft)
�O Ln M N O N
O
O
O
61
O
O
00
O
O
r
O
O
o E
O H
1 �
Ln
O
O
O
O
M
0
0
0
0
a�
E
o
CD c
r �
>
C> a)
M N O 0') 00 rl- l0
M M M M N N N N u
N N N N N N N N I
(1}) na13
-21 -
Hydrograph Report
Hydrology Studio v 2.0.0.53
48" EXIT FROM SITE
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 47.37 cfs
Storm Frequency = 1 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 16,854 cuft
Inflow Hydrographs = 4, 6, 8, 12 Total Contrib. Area = 4.04 ac
QP = 47.37 ds
54-
4525048464442403836343230
52-
50-
48-
46-
44-
42-
40-
38-
36-
34-
32 ---
30
w 28
C1 26-
624222018161412108642
24-
22-
20-
18-
16-
14-
12-
10-
8-
6-
4-
2-
0Pill N
0 1 2 3 4 5 6 7 8 9 10 11 12
Time (min)
POST CH -8 — POST CULVERT 4 — POST CENTRAL — PIPE+OUTLET CONTROL — 48" EXIT FROM SITE
-22-
Hydrograph Report Project Name: White Oak Ph 5
Hydrology Studio v 2.0.0.53
Post Stream Point D
08-13-2018
Hyd. No. 14
Hydrograph Type = Junction Peak Flow = 41.49 cfs
Storm Frequency = 1 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 14,649 cuft
Inflow Hydrographs = 11, 12 Total Contrib. Area = 0.83 ac
QP = 41.49 ds
46-
6444240383634
44-
42-
40-
38-
36-
34
23028 32-
30-
28-
-
26
24
CY
22-
220181614121086
20-
18-
16-
14-
12-
10-
8-
6-
4
2-
MINI
ONONNI
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Time (min)
— POST OVERLAND PT D — PIPE+OUTLET CONTROL — Post Stream Point D
-23-
Design Storm Report
Hydrology Studio v 2.0.0.53
Storm Distribution: OF Based - Synthetic
Custom Storm filename: Tryon CA.cds
08-13-2018
Storm
Total Rainfall Volume (in)
Duration
V 1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
Time
6 hrs
1.81
0
0
0
3.81
4.96
5.91
0
-24-
Incremental Rainfall Distribution, 1 -yr
Time
Precip
Time
Precip
Time
Precip
Time
Precip
Time
Precip
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
2.50
0.0056
2.68
0.0098
2.87
0.0243
3.05
0.0545
3.23
0.0143
2.52
0.0059
2.70
0.0104
2.88
0.0274
3.07
0.0455
3.25
0.0133
2.53
0.0061
2.72
0.0111
2.90
0.0311
3.08
0.0386
3.27
0.0123
2.55
0.0064
2.73
0.0119
2.92
0.0358
3.10
0.0333
3.28
0.0115
2.57
0.0067
2.75
0.0128
2.93
0.0418
3.12
0.0291
3.30
0.0107
2.58
0.0070
2.77
0.0138
2.95
0.0496
3.13
0.0257
3.32
0.0101
2.60
0.0074
2.78
0.0149
2.97
0.0601
3.15
0.0229
3.33
0.0095
2.62
0.0078
2.80
0.0163
2.98
0.0747
3.17
0.0206
3.35
0.0089
2.63
0.0082
2.82
0.0178
3.00
0.0958
3.18
0.0187
3.37
0.0084
2.65
0.0087
2.83
0.0196
3.02
0.0842
3.20
0.0170
3.38
0.0080
2.67
0.0092
2.85
0.0217
3.03
0.0668
3.22
0.0156
3.40
0.0076
1.8
1.8
1.7
1.7
1.6
777
1.6
1.5
1.5
1.4
1.4
1.3
1.3
1.2
1.2
1.1
1.1
c�
.. 1
1 �
D.
0.9
0.9
v
a 0.8
0.8
0.7
0.7
0.6
0.6
0.5
0.5
0.4
0.4
0.3
0.3
0.2
0.2
0.1
0.1
0
0
0
1
2
3
4
5
6
Time (hrs)
-24-
Hydrograph 10 -yr Summary
Hydroloqy Studio v 2.0.0.53
Project Name: White Oak Ph 5
08-13-2018
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1
Rational
PRE - A - 48" EXIT
77.51
0.08
23,253
----
2
Rational
PRE - B (SE)
2.103
0.08
631
----
3
Rational
POST - B
4.301
0.08
1,290
----
4
Rational
POST CH -8
1.360
0.08
408
----
5
Rational
POST -AB CULVERT
75.02
0.08
22,507
----
6
Rational
POST CULVERT 4
3.345
0.08
1,003
----
7
Rational
POST C
1.507
0.08
452
----
8
Rational
POST CENTRAL
10.15
0.08
3,044
----
9
Rational
PRE C (W)
0.794
0.08
238
----
10
Rational
PRE STREAM POINT D
72.33
0.08
21,700
----
11
Rational
POST OVERLAND PT D
3.051
0.08
915
----
12
Pond Route
PIPE+OUTLET CONTROL
63.94
0.10
22,516
5
2130.55
4,516
13
Junction
48" EXIT FROM SITE
75.82
0.10
26,971
4, 6, 8, 12
14
Junction
Post Stream Point D
66.38
0.10
23,432
11,12
-25-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - A - 48" EXIT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 1
Hydrograph Type = Rational
Peak Flow = 77.51 cfs
Storm Frequency = 10 -yr
Time to Peak = 0.08 hrs
Time Interval = 1 min
Runoff Volume = 23,253 cuft
Drainage Area = 24.52 ac
Runoff Coeff. = 0.43*
Tc Method = User
Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf
Intensity = 7.3515 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
6.3 0.22 lawn/clay soils/avg grades
0.102 0.15 wooded
18.12 0.50 Single Family Residential
24.52 0.43 Weighted Average
QP = 77.51 ds
85-
5807570656055
80-
75--
70--
65--
60--
55-
50
v 45
40-
35
30-
25-
20-
15
10
OF5
-/
0
0 1 2 3
4 5 6 7 8
9 10
Time (min)
-26-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - B (SE)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 2
Hydrograph Type = Rational
Peak Flow
= 2.103 cfs
Storm Frequency = 10 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 631 cuft
Drainage Area = 1.3 ac
Runoff Coeff.
= 0.22*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 7.3515 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.295 0.22 LAWN AVG GRADES, CLAY LOAM
1.3 0.22 Weighted Average
V
0
3
2
1
QP = 2.10 ds
we,
1 2 3 4 5 6 7 8 9 10
Time (min)
-27-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - B
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 3
Hydrograph Type = Rational
Peak Flow
= 4.301 cfs
Storm Frequency = 10 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 1,290 cuft
Drainage Area = 1.17 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 7.3515 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.17 0.50 Single Family Residential
1.17 0.50 Weighted Average
V
CY
5
4
3
2
1
QP = 4.30 ds
we,
1 2 3 4 5 6 7 8 9 10
Time (min)
-28-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CH -8
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 4
Hydrograph Type = Rational
Storm Frequency = 10 -yr
Time Interval = 1 min
Drainage Area = 0.37 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 1.360 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 408 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 7.3515 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.372 0.50 Single Family Residential
0.37 0.50 Weighted Average
2-
QP = 1.36 ds
1.9-
1.91.61.51.41.31.2
1.6-
1.5-
1.4-
1.3-
1.2-
1.1
1
-
0.9
0.8-
.80.70.60.5
0.7-
0.6-
0.5-
-
0.4-
.40.30.20.10
0.3-
0.2-
0.1-
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
_Y9_
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - AB CULVERT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 5
Hydrograph Type
= Rational
Peak Flow
= 75.02 cfs
Storm Frequency
= 10 -yr
Time to Peak
= 0.08 hrs
Time Interval
= 1 min
Runoff Volume
= 22,507 cuft
Drainage Area
= 20.41 ac
Runoff Coeff.
= 0.5*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
IDF Curve
= Hendersonville. idf
Intensity
= 7.3515 in/hr
Freq. Corr. Factor
= 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
19.98 0.50 AB -4
0.35 0.50 AB -3
0.08 0.50 AB -2
20.41 0.50 Weighted Average
QP = 75.02 ds
85
80
75
70
65
60
55
50
45
CY 40-
35-
30-
03530
25-
20-
15-
10-
5
52015105
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
-30-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CULVERT 4
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 6
Hydrograph Type = Rational
Peak Flow
= 3.345 cfs
Storm Frequency = 10 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 1,003 cuft
Drainage Area = 0.91 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 7.3515 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.91 0.50 Single Family Residential
0.91 0.50 Weighted Average
4
0
1
QP = 3.34 ds
we,
1 2 3 4 5 6 7 8 9 10
Time (min)
-31 -
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST C
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 7
Hydrograph Type = Rational
Storm Frequency = 10 -yr
Time Interval = 1 min
Drainage Area = 0.41 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 1.507 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 452 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 7.3515 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA(ac) C DESCRIPTION
0.41 0.50 Single Family Residential
0.41 0.50 Weighted Average
2-
QP = 1.51 ds
1.9-
1.91.71.61.51.4
1.7-
1.6-
1.5-
1.4-
-
1.3
1.2
1.1
OF
1
0.9-
.90.80.70.60.5
0.8-
0.7-
0.6-
0.5
0.4-
.40.30.20.10
0.3-
0.2-
0.1-
0/
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-32-
Hydrograph Report
Project Name: White Oak Ph 5
Hydrology Studio v 2.0.0.53 08-13-2018
POST CENTRAL Hyd. No. 8
Hydrograph Type = Rational Peak Flow = 10.15 cfs
Storm Frequency = 10 -yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 3,044 cuft
Drainage Area = 2.76 ac Runoff Coeff. = 0.5*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf Intensity = 7.3515 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
2.76 0.50 Single Family Residential
2.76 0.50 Weighted Average
QP =
10.15
ds
11
10
9All-
8-
8765431
7-
6-
5-
4-
3-
1
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
-33-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE C (W)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 9
Hydrograph Type = Rational
Peak Flow = 0.794 cfs
Storm Frequency = 10 -yr
Time to Peak = 0.08 hrs
Time Interval = 1 min
Runoff Volume = 238 cuft
Drainage Area = 0.3 ac
Runoff Coeff. = 0.36*
Tc Method = User
Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf
Intensity = 7.3515 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.15 0.50 Single Family Residential
0.15 0.22 Lawn, avg grades, Clay Loam
0.3 0.36 Weighted Average
QP = 0.79 ds
1
0.95-
.950.90.850.80.75
0.9-
0.85-
0.8-
0.7S -
00l
0.7
0.65
0.6
0.55
0.5
CY
0.45
0.4
0.35
0.3
0.25
0.2
All
0.15
0.1
0.0s-
0-1
0 1 2 3
4 5 6 7 8
9 10
Time (min)
-34-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE STREAM POINT D
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 10
Hydrograph Type = Rational Peak Flow = 72.33 cfs
Storm Frequency = 10 -yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 21,700 cuft
Drainage Area = 21.39 ac Runoff Coeff. = 0.46*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf Intensity = 7.3515 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
18.12 0.50 Single Family Res
3.27 0.22 Lawn, Avg Grades, Clay Loam
21.39 0.46 Weighted Average
QP
= 72.33 ds
80-
075706560555045Cy
7S-
70-
6S-
60-
55-
50-
45-
Cy40-
03530252015100
35-
30-
25-
20--
15-
10-
0-/
0 1 2 3 4 5 6 7 8 9 10
Time (min)
-35-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST OVERLAND PT D
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
IDF Curve
Freq. Corr. Factor
4
9
�2
CY
0
= Rational
= 10 -yr
= 1 min
= 0.83 ac
= User
= Hendersonville. idf
= 1.00
QP = 3.05 ds
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 11
Peak Flow
= 3.051 cfs
Time to Peak
= 0.08 hrs
Runoff Volume
= 915 cuft
Runoff Coeff.
= 0.5
Time of Conc. (Tc)
= 5.0 min
Intensity
= 7.3515 in/hr
Asc/Rec Limb Factors
= 1/1
0
1 2 3 4 5 6 7 8 9 10
Time (min)
-36-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PIPE+OUTLET CONTROL
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 12
Hydrograph Type = Pond Route Peak Flow = 63.94 cfs
Storm Frequency = 10 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 22,516 cuft
Inflow Hydrograph = 5 - POST - AB CULVERT Max. Elevation = 2130.55 ft
Pond Name = PIPE WITH OUTLET CONTROL Max. Storage = 4,516 cuft
Pond Routing by Storage Indication Method Center of mass detention time = 1 min
QP = 63.94 ds
58075 85-
80-
75
70-
65
60---
55---
05550w
50-
w45
CY
40-
03530
35-
30
25
20-
15
10
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Time (min)
Req'd Stor POST - AB CULVERT — PIPE+OUTLET CONTROL
-37-
Hydrograph Report
Hydrology Studio v 2.0.0.53
48" EXIT FROM SITE
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 13
Hydrograph Type = Junction
Peak Flow
= 75.82 cfs
Storm Frequency =
10 -yr
Time to Peak
= 0.10 hrs
Time Interval =
1 min
Hydrograph Volume = 26,971 cuft
Inflow Hydrographs =
4, 6, 8, 12
Total Contrib. Area
= 4.04 ac
QP = 75.82 ds
85-
5807570
80-
75-
70-
Ilk
65
60
55
50
w 45
Cr
40-
0353025201510
35-
30-
25-
20-
15-
10-
5
2
0
0 1 2 3 4 5 6 7 8 9 10
11 12 13
Time (min)
POST CH -8
— POST CULVERT 4 — POST CENTRAL — PIPE+OUTLET CONTROL — 48" EXIT FROM SITE
-38-
Hydrograph Report
Hydrology Studio v 2.0.0.53
Post Stream Point D
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 14
Hydrograph Type
Storm Frequency
Time Interval
Inflow Hydrographs
= Junction
= 10 -yr
= 1 min
= 11, 12
Peak Flow
Time to Peak
Hydrograph Volume
Total Contrib. Area
= 66.38 cfs
= 0.10 hrs
= 23,432 cuft
= 0.83 ac
76-
67472706866
QP = 66.38 ds
74-
72-
70-
68-
66
64-
62-
60
58
56
54
52
50
48
46
44
42
40
38
CY
36-
634323028262422201816141210864
34-
32-
30-
28-
26-
24-
22-
20-
18-
16-
14-
12-
10-
8-
6-
4
NOON2-
MEOW
Noun
0
0 1
2 3 4
— POST OVERLAND PT D
5 6 7
Time (min)
— PIPE+OUTLET CONTROL
8 9 10
— Post Stream Point D
11 12 13
-39-
Design Storm Report
Hydrology Studio v 2.0.0.53
Storm Distribution: OF Based - Synthetic
Custom Storm filename: Tryon CA.cds
08-13-2018
Storm
Total Rainfall Volume (in)
Duration
1 -yr
2 -yr
3 -yr
5 -yr
-I10-yr
25 -yr
50 -yr
100 -yr
Precip
6 hrs
1.81
0
0
0
3.81
4.96
5.91
0
(hrs)
-40-
Incremental Rainfall Distribution, 10 -yr
Time
Precip
Time
Precip
Time
Precip
Time
Precip
Time
Precip
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
2.50
0.0131
2.68
0.0204
2.87
0.0440
3.05
0.0900
3.23
0.0281
2.52
0.0135
2.70
0.0215
2.88
0.0488
3.07
0.0765
3.25
0.0263
2.53
0.0140
2.72
0.0227
2.90
0.0547
3.08
0.0662
3.27
0.0247
2.55
0.0145
2.73
0.0240
2.92
0.0619
3.10
0.0581
3.28
0.0233
2.57
0.0150
2.75
0.0255
2.93
0.0710
3.12
0.0516
3.30
0.0221
2.58
0.0156
2.77
0.0272
2.95
0.0828
3.13
0.0463
3.32
0.0209
2.60
0.0163
2.78
0.0291
2.97
0.0985
3.15
0.0419
3.33
0.0199
2.62
0.0170
2.80
0.0313
2.98
0.1201
3.17
0.0383
3.35
0.0190
2.63
0.0177
2.82
0.0338
3.00
0.1515
3.18
0.0352
3.37
0.0181
2.65
0.0185
2.83
0.0367
3.02
0.1342
3.20
0.0325
3.38
0.0173
2.67
0.0194
2.85
0.0400
3.03
0.1084
3.22
0.0301
3.40
0.0166
4
4
3
3
c
�
CO -22
D.
v
a
1
1
0
0
0
1
2
3
4
5
6
Time (hrs)
-40-
Hydrograph 25 -yr Summary
Hydroloqy Studio v 2.0.0.53
Project Name: White Oak Ph 5
08-13-2018
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(cuft)
1
Rational
PRE - A - 48" EXIT
88.72
0.08
26,615
----
2
Rational
PRE - B (SE)
2.406
0.08
722
----
3
Rational
POST - B
4.922
0.08
1,477
----
4
Rational
POST CH -8
1.557
0.08
467
----
5
Rational
POST -AB CULVERT
85.87
0.08
25,760
----
6
Rational
POST CULVERT 4
3.828
0.08
1,149
----
7
Rational
POST C
1.725
0.08
517
----
8
Rational
POST CENTRAL
11.61
0.08
3,483
----
9
Rational
PRE C (W)
0.909
0.08
273
----
10
Rational
PRE STREAM POINT D
82.79
0.08
24,837
----
11
Rational
POST OVERLAND PT D
3.492
0.08
1,048
----
12
Pond Route
PIPE+OUTLET CONTROL
71.96
0.10
25,782
5
2131.18
5,181
13
Junction
48" EXIT FROM SITE
85.56
0.10
30,881
4, 6, 8, 12
14
Junction
Post Stream Point D
74.75
0.10
26,829
11,12
-41-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - A - 48" EXIT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 1
Hydrograph Type = Rational Peak Flow = 88.72 cfs
Storm Frequency = 25 -yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 26,615 cuft
Drainage Area = 24.52 ac Runoff Coeff. = 0.43*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf Intensity = 8.4141 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
6.3 0.22 lawn/clay soils/avg grades
0.102 0.15 wooded
18.12 0.50 Single Family Residential
24.52 0.43 Weighted Average
QP
=
88.72
ds
100
90
80
70
60
� 50
40
30
20
10
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
-42-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE - B (SE)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 2
Hydrograph Type = Rational
Peak Flow
= 2.406 cfs
Storm Frequency = 25 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 722 cuft
Drainage Area = 1.3 ac
Runoff Coeff.
= 0.22*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 8.4141 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.295 0.22 LAWN AVG GRADES, CLAY LOAM
1.3 0.22 Weighted Average
3
2
1
QP = 2.41 ds
we,
1 2 3 4 5 6 7 8 9 10
Time (min)
-43-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - B
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 3
Hydrograph Type = Rational
Peak Flow
= 4.922 cfs
Storm Frequency = 25 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 1,477 cuft
Drainage Area = 1.17 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 8.4141 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
1.17 0.50 Single Family Residential
1.17 0.50 Weighted Average
QP = 4.92
ds
5
4-
3
NV
V
2
1
0
0 1 2 3
4 5 6 7 8
9 10
Time (min)
-44-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CH -8
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 4
Hydrograph Type = Rational
Storm Frequency = 25 -yr
Time Interval = 1 min
Drainage Area = 0.37 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 1.557 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 467 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 8.4141 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.372 0.50 Single Family Residential
0.37 0.50 Weighted Average
2-
QP = 1.56 ds
1.9-
1.91.61.51.41.3
1.6-
1.5-
1.4-
1.3-
1.2
J4
1.1
1
IL
0.9-
.90.80.7
0.8-
0.7-
NL
0.6-
0.5-
0.4-
.40.30.20.10
0.3-
0.2-
0.1-
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-45-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST - AB CULVERT
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 5
Hydrograph Type
= Rational
Peak Flow
= 85.87 cfs
Storm Frequency
= 25 -yr
Time to Peak
= 0.08 hrs
Time Interval
= 1 min
Runoff Volume
= 25,760 cuft
Drainage Area
= 20.41 ac
Runoff Coeff.
= 0.5*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
IDF Curve
= Hendersonville. idf
Intensity
= 8.4141 in/hr
Freq. Corr. Factor
= 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
19.98 0.50 AB -4
0.35 0.50 AB -3
0.08 0.50 AB -2
20.41 0.50 Weighted Average
95
90
85
80
75
70
65
60
55
50
CY
45
40
35
30
25
20
15
10
5
0
0
Qp = 85.87 ds
1 2 3 4 5 6 7 8 9 10
Time (min)
-46-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CULVERT 4
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 6
Hydrograph Type = Rational
Peak Flow
= 3.828 cfs
Storm Frequency = 25 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 1,149 cuft
Drainage Area = 0.91 ac
Runoff Coeff.
= 0.5*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 8.4141 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.91 0.50 Single Family Residential
0.91 0.50 Weighted Average
4
0
1
QP = 3.83 ds
0
1 2 3 4 5 6 7 8 9 10
Time (min)
-47-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST C
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 7
Hydrograph Type = Rational
Storm Frequency = 25 -yr
Time Interval = 1 min
Drainage Area = 0.41 ac
Tc Method = User
IDF Curve = Hendersonville. idf
Freq. Corr. Factor = 1.00
Peak Flow = 1.725 cfs
Time to Peak = 0.08 hrs
Runoff Volume = 517 cuft
Runoff Coeff. = 0.5*
Time of Conc. (Tc) = 5.0 min
Intensity = 8.4141 in/hr
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA(ac) C DESCRIPTION
0.41 0.50 Single Family Residential
0.41 0.50 Weighted Average
2-
QP = 1.72 ds
-T
1.9
1.8
1.7
1.6-
.61.51.41.3
1.5-
1.4-
1.3
1.2-
1.1
1
0.9-
0.8
0.7-
0.6-
0.5-
.70.60.50.40.30.20.1
0.4-
0.3-
0.2-
0.1
0
0 1 2 3
4 5 6 7 8
Time (min)
9 10
-48-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST CENTRAL
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 8
Hydrograph Type = Rational Peak Flow = 11.61 cfs
Storm Frequency = 25 -yr Time to Peak = 0.08 hrs
Time Interval = 1 min Runoff Volume = 3,483 cuft
Drainage Area = 2.76 ac Runoff Coeff. = 0.5*
Tc Method = User Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf Intensity = 8.4141 in/hr
Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
2.76 0.50 Single Family Residential
2.76 0.50 Weighted Average
QP =
11.61 cfs
13-
3121110
12-
11-
10-
Ilk
9-
876 8-
7-
6-
5
4
OF
3-
2
1
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
-49-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE C (W)
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 9
Hydrograph Type = Rational
Peak Flow = 0.909 cfs
Storm Frequency = 25 -yr
Time to Peak = 0.08 hrs
Time Interval = 1 min
Runoff Volume = 273 cuft
Drainage Area = 0.3 ac
Runoff Coeff. = 0.36*
Tc Method = User
Time of Conc. (Tc) = 5.0 min
IDF Curve = Hendersonville. idf
Intensity = 8.4141 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors = 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
0.15 0.50 Single Family Residential
0.15 0.22 Lawn, avg grades, Clay Loam
0.3 0.36 Weighted Average
QP = 0.91 cfs
1
0.95-
.950.90.85
0.9-
0.85-
-
0.8
0.75
0.7
0.65
0.6
0.55
0.5
-
100F
0.4S --
.450.40.35
0.4-
14
03S
0.3
OF
0.2S-
.250.20.1
0.2-
0.1
0.1
0.05
0
0 1 2 3
4 5 6 7 8
9 10
Time (min)
-50-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PRE STREAM POINT D
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 10
Hydrograph Type = Rational
Peak Flow
= 82.79 cfs
Storm Frequency = 25 -yr
Time to Peak
= 0.08 hrs
Time Interval = 1 min
Runoff Volume
= 24,837 cuft
Drainage Area = 21.39 ac
Runoff Coeff.
= 0.46*
Tc Method = User
Time of Conc. (Tc)
= 5.0 min
IDF Curve = Hendersonville. idf
Intensity
= 8.4141 in/hr
Freq. Corr. Factor = 1.00
Asc/Rec Limb Factors
= 1/1
Composite C Worksheet
AREA (ac) C DESCRIPTION
18.12 0.50 Single Family Res
3.27 0.22 Lawn, Avg Grades, Clay Loam
21.39 0.46 Weighted Average
95
90
85
80
75
70
65
60
55
50
CY 45
40
35
30
25
20
15
10
5
0
0
QP = 82.79 ds
1 2 3 4 5 6 7 8 9 10
Time (min)
-51-
Hydrograph Report
Hydrology Studio v 2.0.0.53
POST OVERLAND PT D
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
IDF Curve
Freq. Corr. Factor
4
9
�2
CY
1
= Rational
= 25 -yr
= 1 min
= 0.83 ac
= User
= Hendersonville. idf
= 1.00
QP = 3.49 ds
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 11
Peak Flow
= 3.492 cfs
Time to Peak
= 0.08 hrs
Runoff Volume
=1,048cuft
Runoff Coeff.
= 0.5
Time of Conc. (Tc)
= 5.0 min
Intensity
= 8.4141 in/hr
Asc/Rec Limb Factors
= 1/1
0
1 2 3 4 5 6 7 8 9 10
Time (min)
-52-
Hydrograph Report
Hydrology Studio v 2.0.0.53
PIPE+OUTLET CONTROL
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 12
Hydrograph Type = Pond Route Peak Flow = 71.96 cfs
Storm Frequency = 25 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 25,782 cuft
Inflow Hydrograph = 5 - POST - AB CULVERT Max. Elevation = 2131.18 ft
Pond Name = PIPE WITH OUTLET CONTROL Max. Storage = 5,181 cuft
Pond Routing by Storage Indication Method Center of mass detention time = 1 min
QP = 71.96 ds
95-
59085807570
90---
85-
A
80---
75-
70-
0000
65-
56055
60-
55-
Ilk
50
CY
45-
5403530
40-
35-
30-
25
20---
01510500
15-
10-
5-
0-
01 2 3 4 5 6 7 8 9 10 11 12 13
Time (min)
Req'd Stor POST - AB CULVERT — PIPE+OUTLET CONTROL
-53-
Hydrograph Report
Hydrology Studio v 2.0.0.53
48" EXIT FROM SITE
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 13
Hydrograph Type = Junction Peak Flow = 85.56 cfs
Storm Frequency = 25 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 30,881 cuft
Inflow Hydrographs = 4, 6, 8, 12 Total Contrib. Area = 4.04 ac
QP = 85.56 ds
95
90
85
80
75
70
65
60
55
50
Cr
45-
40-
L
35-
53025
30-
25----
000'
20F
00F
5105 15-
10-
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Time (min)
POST CH -8 — POST CULVERT 4 — POST CENTRAL - PIPE+OUTLET CONTROL — 48" EXIT FROM SITE
-54-
Hydrograph Report
Hydrology Studio v 2.0.0.53
Post Stream Point D
Project Name: White Oak Ph 5
08-13-2018
Hyd. No. 14
Hydrograph Type = Junction Peak Flow = 74.75 cfs
Storm Frequency = 25 -yr Time to Peak = 0.10 hrs
Time Interval = 1 min Hydrograph Volume = 26,829 cuft
Inflow Hydrographs = 11, 12 Total Contrib. Area = 0.83 ac
QP = 74.75 ds
85-
58075
80-
75-
0000
70
55045 65--
50---
45
V
a
40
35
30
25
20
5105 15-
10-
5
0-- -r--17�7t
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Time (min)
— POST OVERLAND PT D — PIPE+OUTLET CONTROL — Post Stream Point D
-55-
Design Storm Report
Hydrology Studio v 2.0.0.53
Storm Distribution: OF Based - Synthetic
Custom Storm filename: Tryon CA.cds
08-13-2018
Storm
Total Rainfall Volume (in)
Duration
1 -yr
2 -yr
3 -yr
5 -yr
10 -yr
25 -yr
50 -yr
100 -yr
Precip
6 hrs
1.81
0
0
0
3.81
4.96
5.91
0
(hrs)
-56-
Incremental Rainfall Distribution, 25 -yr
Time
Precip
Time
Precip
Time
Precip
Time
Precip
Time
Precip
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
(hrs)
(in)
2.50
0.0174
2.68
0.0259
2.87
0.0524
3.05
0.1034
3.23
0.0347
2.52
0.0179
2.70
0.0272
2.88
0.0577
3.07
0.0883
3.25
0.0326
2.53
0.0185
2.72
0.0285
2.90
0.0641
3.08
0.0768
3.27
0.0309
2.55
0.0191
2.73
0.0300
2.92
0.0721
3.10
0.0679
3.28
0.0293
2.57
0.0197
2.75
0.0317
2.93
0.0822
3.12
0.0607
3.30
0.0278
2.58
0.0204
2.77
0.0336
2.95
0.0953
3.13
0.0549
3.32
0.0265
2.60
0.0212
2.78
0.0358
2.97
0.1129
3.15
0.0501
3.33
0.0254
2.62
0.0220
2.80
0.0382
2.98
0.1374
3.17
0.0460
3.35
0.0243
2.63
0.0228
2.82
0.0410
3.00
0.1734
3.18
0.0425
3.37
0.0233
2.65
0.0238
2.83
0.0442
3.02
0.1535
3.20
0.0395
3.38
0.0224
2.67
0.0248
2.85
0.0479
3.03
0.1240
3.22
0.0369
3.40
0.0216
5
5
4
4
3
3
c
Q
n
v
�
N
a
2
2
1
1
0
0
0
1
2
3
4
5
6
Time (hrs)
-56-
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 13 2018
White Oak Phase 5 - Post -Disturbance Discharge Area B
Trapezoidal
Highlighted
Bottom Width (ft)
= 40.00
Depth (ft)
= 0.14
Side Slopes (z:1)
= 12.00, 12.00
Q (cfs)
= 4.301
Total Depth (ft)
= 4.00
Area (sqft)
= 5.84
Invert Elev (ft)
= 2149.00
Velocity (ft/s)
= 0.74
Slope (%)
= 0.40
Wetted Perim (ft)
= 43.37
N -Value
= 0.033
Crit Depth, Yc (ft)
= 0.08
Top Width (ft)
= 43.36
Calculations
EGL (ft)
= 0.15
Compute by:
Known Q
Known Q (cfs)
= 4.30
Elev (ft) Section
2154.00
2153.00
2152.00
2151.00
2150.00
2149.00
2148.00
Depth (ft)
5.00
4.00
3.00
2.00
1.00
1 11
_i nn
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 VV
Reach (ft)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 13 2018
White Oak Phase 5 - Post -Disturbance Discharge Post C
Trapezoidal
Highlighted
Bottom Width (ft)
= 10.00
Depth (ft)
= 0.08
Side Slopes (z:1)
= 65.00, 21.00
Q (cfs)
= 1.510
Total Depth (ft)
= 3.00
Area (sqft)
= 1.08
Invert Elev (ft)
= 2134.00
Velocity (ft/s)
= 1.40
Slope (%)
= 5.50
Wetted Perim (ft)
= 16.88
N -Value
= 0.033
Crit Depth, Yc (ft)
= 0.08
Top Width (ft)
= 16.88
Calculations
EGL (ft)
= 0.11
Compute by:
Known Q
Known Q (cfs)
= 1.51
Elev (ft)
2138.00
2137.00
2136.00
2135.00
2134.00
2133.00
Section
D 50 100 150 200
Reach (ft)
250 300 350
Depth (ft)
4.00
3.00
2.00
1.00
PER
1 -1.00
400
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 13 2018
White Oak Phase 5 - Post -Disturbance Discharge Culvert 4
Trapezoidal
Highlighted
Bottom Width (ft)
= 10.00
Depth (ft)
= 0.10
Side Slopes (z:1)
= 10.00, 10.00
Q (cfs)
= 3.345
Total Depth (ft)
= 3.00
Area (sqft)
= 1.10
Invert Elev (ft)
= 2124.00
Velocity (ft/s)
= 3.04
Slope (%)
= 13.00
Wetted Perim (ft)
= 12.01
N -Value
= 0.033
Crit Depth, Yc (ft)
= 0.15
Top Width (ft)
= 12.00
Calculations
EGL (ft)
= 0.24
Compute by:
Known Q
Known Q (cfs)
= 3.35
Elev (ft) Section
2128.00
2127.00
2126.00
2125.00 00,
44,
2124.00
2123.00
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80
Reach (ft)
Depth (ft)
4.00
3.00
2.00
1.00
PER
-1.00
a�
00
O
00
O
w
w
W
I
0
Cn
ry
W
Q
O
in
I
N
O
00
11-1
CD
0
n
Z
O
U
Z
O
V)
ry
W
0
Z
W
n
Y
Q
O
w
I
N
O
00
i
0
N
N
N
E
0
0
0)
0
.3
0
0
/
30
PROPOSED SLOPE /
MATTING, TYP.
SEE DETAIL ON SHEET
SC250- // A -2 I /
H_g // /I IN D CH 1 �\ \
— -_ -- -
/
JB / / �/ / 11 E[
i v
56. LE 60 HDPE PIPE
/O tL& 0 T L �TKUCewer
Nw/ / / / /UVI h 6 CI IAC LA IFI E
/ / / AN F WEIR
6 6-— — — — ) IM
OUTLET SRUCTU / /
\ //IIII INV :21 2 .23 E /D AIL
INV C)UT:2 1/2G. 1
25
_ II / I I IO 0 110 / / 4 I 60
4/8/CU� \f
� / / � cxaP�lc sc INC = �
\ � / / 224.0 / / o M
IN��21
2150
OUTLET CONTROL STRUCTURE
RIM:2 1 37.00
INV IN:21 24.23
INV OUT:2 1 2G. 13
2140
2130
2120
2110
0+00
1+00
2 +'00
3+00
4+00
2150
2140
2130
2120
—4� 2110
4+80
60" FROM SYSTEM
INVERT ELEVATION 2126.23
iy��r=.fcirn
MANHOLE COVER
V)
V)
N
0
TOP OF WALL
F
w
w
W(-)
O
RIM:2 138
50
Z
26.0" ORIFICE
0
0
LL-
Ld
W
INV. ELEV. 2126.24
C/)
(n
Z
W
_
-- ELEV. 2126.23
Q
J �
O
INV
OUT:2 1 30
00
LjLjZ
Z0
�
O
LLI
O
W'
W W
Ld
J
J_
F—
>
Z
O
(n
Ld
W
ILJL
375
5 I' of
=
n
CO
8"0
PVC @
4 1
JB -I
15-3
R&4:2136.53
RIM:2 1 3
.49
—\
INV
N:2 12G.G I
I
W IN:2 1 2
.50
INV O
T:2 12G.5
IN
OUT:2 12E.40
RIM:2
1 34.55
/
/
INV IN:2127.
19--
\
/
/
i
/
I
I
r—
5WPipe
- (4)
9(;.
1 3 of()
42"0 HDPE
Pipe
1.550%
h
- IYGU
inc
ip
o
pe -
I M:2 130.1
WPipe -
(I)
134.
D7 of
I
VIN:2 1 2G
00
G.7G' o
42"42
inch H
PE PipeFIG%
0"GO in
h HDPE
ipe @ 0.
0%
2110
0+00
1+00
2 +'00
3+00
4+00
2150
2140
2130
2120
—4� 2110
4+80
60" FROM SYSTEM
INVERT ELEVATION 2126.23
iy��r=.fcirn
MANHOLE COVER
V)
V)
N
0
TOP OF WALL
F
w
w
W(-)
O
ELEVATION 2131.23'
m
Z
26.0" ORIFICE
0
0
LL-
Ld
W
INV. ELEV. 2126.24
C/)
(n
Z
W
_
-- ELEV. 2126.23
Q
J �
60" FROM SYSTEM
INVERT ELEVATION 2126.23
48" OUTLET
INVERT ELEVATION 2126.13
ELEVATION 2131.23'
OUTLET CONTROL STRUCTURE
PIPE DETENTION SYSTEM
N.T.S.
48" OUTLET
INVERT ELEVATION 2126.13
JOB NUMBER:
18012
00 00
w \ \
n 00
-0-0
00
"N,
cV
O
0
LLI
w V)
C) w
Ld
U
Z O
U
Z
frW
F-
a- a O o
N z
W CJ fr
LLIO
U0
wV)
0 j
Z LLL
Wfr
W
0
W
V)
Of
W N I V) L0 1 (0
Of
I HEREBY CERTIFY THAT THIS
PLAN AND SPECIFICATION
WAS PREPARED BY ME OR
UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED
ARCHITECT OR ENGINEER
UNDER THE LAWS OF THE
STATE OF NORTH CAROLINA
AS SIGNIFIED BY MY HAND
AND SEAL.
�t1,1,1, n 11111"��
%% %%` 1 CARo'%
21
.,�yj,ID •O�p���.
SCALE: N.T.S.
DATE: 08/13/18
DRAWN BY: PED
CHECKED BY: BSR
PROJECT MGR: BSR
SHEET:
11
V)
LOz
W(-)
O
' ^
V)
Z
II--�--I
0
0
LL-
Ld
W
C/)
(n
Z
W
_
Q
J �
O
O
U
LjLjZ
Z0
�
O
LLI
O
W'
W W
Ld
J
J_
F—
>
Z
O
(n
Ld
W
ILJL
0
Z
W
=
n
CO
SCALE: N.T.S.
DATE: 08/13/18
DRAWN BY: PED
CHECKED BY: BSR
PROJECT MGR: BSR
SHEET:
11
1-1
/-----/----_-- - -\ \\\ \ \\ _\ \ /- / / 1 r // // / / ,/ / // / /� / I I 1 I \ \ \ \ \ \ 1 , '—`\ I / - JOB NUMBER:
J I ) i( \ I /, 1 18012
/\ \ / 1 \
_ - / ---
I I / / / /' � ' / / / _ -� I I I \ \ \ l \ ^ /// /// /^'
\ /�� \� j //
\ \\ \ \ \\ �\ / ) / J / / /' / , I 1 \ \ I 1 I \ \ \ 1 1 \ \ \ / /'
`\ \ �\ \ \\ \ / 00 00
'\ \I\\ / /' ' / / // ' / / / / I 11 \ \ \ I I I \\ \ \ \ \ \ \ 1 \ I I I 1 \ 1 \ \ \ /, /, \ 1 // /'�/,// / W \ \
v v v _ \ v \ A /� / / - - / / / / 1 \ / \ \ / \ A \ I I V A /' /' -' \ Q cD r7
/ -- /\,/----_\ \\ \- \ \ \ \ _ - - /' / / / / / / ,/ J \ \ I / I / J \ \ \ l \ \ \ \ \ \ \ I I I I \ \ \ — f / / / \`_ / / 0 1, �
/� ----- _____ \_- \ , \__ \\ \\ \ \ / - I \ \ \ \ \ \ ti \ 1 I \ \ \ / / / -/ / ' I- ao
' _ --'' �\_ \, _\ \ \ \ � \ \\ \ // I / /' /,'/ ' / // / // I / \\ \\ II Il � ,l \\ \\ \ \ \ \\ \ \ �� '\Right4of-�l/ay� I I I I \ \I \\ \\\ ,� j/// \1 ^/ X11 // 0 0
_/ - \ \ \ \ \ \ / , / / \ , /- \ \ \ \ \ \ ff h I I - , \ / /
/// /'// — �_ \\\ \—\ \ \\ \ — \ \ \___/\\\ 1 / // /— — - -1 / /, /) 1( /) / \\ \ II / / / / \\ \\ / I ) \ \ \ Rer\Plat lid 5�9W II \ \ J / ' / \ ,_ — ' / / Q 0
/ — \ \ \ \ \ � \ \ \ ` _ \ '_ I ,' /' I- l / I l \ II I 11 / / - \ \ L \ \ \ \ \\ \ \ \ I \ I I I \ / ) / ` /' \ m U) a
/ %--,-�__ \ \ \ \ % , / / / , / I \ I f / - \ \ \ \ \ \ I I \ \ 1 I \- / / \ / / \
/' /--�-/// \\� \ \\ \ \\ \\ \ \\ \\ \�_ \ / i ,' /' -/--- / //- /� / / \\ II II 11 ) /' /\ \\\\ \I \\\\\ \ \ \ \ I/O \ \\ l \ \` \) j / � \_--' / \\
\ I I \ \ \ / _-/ , / --' / / / l / J --_\ , ( / l \/\ %-_ \\ � I \ \ \ \ \ 1 I \ \ I \ l \ \ // / \ / / \
�/ /------____--\ \ \ ` ,,� \ \ \ \ \ — �z J �- � � � / / � / / / lApproxim�teLo�cattonofi �__- � \ \ \ \ \ \ \ 1 \ / / /
l - - \ \ \ \\ \ \ \ \ �� / _ / _� _/ _ � / l / / / ,- - - -/ / ,/ a�0 Aatura/Gas Lute _"- _ \ \ \\ 1 \ \ \ I\ — -
, /, - - - - I I\ _\ \, \, \ `\ I \ \-��"I _ '/ i,� / _� / I // /, // lkight�of-W�A3.�lhown -�J- COT9 \\ \\\\\\\ \\ \\\ \ \ \\ \\ \\ \\ \ \ \\ I l \ /'/' -I \-\J/\\ /' ' \\
- J - _ - - - , 11 ^ I \ J � - / / � / / / obi Plat Slide 9346 , \ \ \ 1 \ 1 \ \ / / - \
/ \ --_ I \ N,_ \ \ 1 ` \\ I _\ —/^ - / / / \/ / I ( / / ,/ / �/ / / "I 1592,
� But�ck \ \ \\ \ \ I'll \ I \ \ \ \ // / -1 / /
-- -- — � \ ' \\ \ \ \ \\ ( \\ \ I ----/ / / /- , I ) / / , / — —_ D.8.1592,D 677 \\ ` \ / \ \\\ \\ \\ I " \\\ \ \ \ /✓ // / \ \— —/ / \\ �
1 I l J ' / ' ' /' / / , \ Plat Slide 54 \\ \\ \ \ /V\ \ \ 1 / `\ \ / / / 0)
/ / V v \ \ -
� -\ �/ �� - I l /1 / I / l /' / // ' � Pm�'b704574Z0\ \ \ \ \ \ \ \ \ \ \ I \ \ \ � \ / � / _- � /-�' N
- _ � __ 1 \ \ / \ I \ \ \ \ \\ - - / /' _ \\/- /'^\\ I I // f / /� ' '/ '' ' //'/ / _ \\ \ \ \ \ \\ \ \ \ l\ ` \\ \ \/- ----/ � i/,_ - --i �/- \ (DD
\ \ \ \ / / / / / / / / �� y \ \ \\ \ / \ o
\`_— _ \\\ \\ \\ \\ \\ \ \I I `\ \ \ \ � / // J�� \\ / [-\ \ I / / / / // ,/ / , / / / , //\ \\ `\ / \ \ \ \ \ \ \ \ / /�__—�—
r� �J Pri vast %a ve c
�^ \ / \ I \ — / /i _ / \ /l / // // / / - / /- ' / ^ \ \\ I \ \\ \ \ \ \ \ \\ \\ '<�\ \ \\ / \ W
_ /—� \ \ i / \ / / / I � / \ \ \ \ \ \ i
/ I \\ I , , / 1 / ) 1 1 ^ --^\\ / / \ \ / �/ / // // , \ y / I ( ) \ \ \\ \\ \\ \ \ \ \ \ \\ / / / _- _ w F-
/ I / / - \ / / � ' / ' / / r / / / - \ / \ \ \ \ \ / / /-- � \ v z
�-- 1 \ 1 / / / 1 I I \ , / __—/ —\ \_ —/ / / / / // / , / J ( \ —0� \ \ \ \ \ \ \ \ \ \ / / \ W
-- \ I , I 1 \ \ —_ / / / � _ / / / I / / / , 1 - / �" ,\ \ �\ \ \ \ \ \ \ / / / N �
\ ` l I I / \ 1 \ l\ I / / (_ _ / J � /,- /,/ /� / 1 / // // -/// _/ \\ '\� I / I , /` \\ \ \\\ \\ \ \ high -ot�I �s \ // / _ _ ___11
\ p
— \ \ \ \ I \ \ 1 / / / , / / - // �� �/� - \ \ \ \ I \ \Per Plat\ Slide 5499 \ - l /r-\ \ Z U
/ ) , / , / / Y I,, / \
\ \ 1 \ \ \ \ \ I / / / \ / ore / �, / \ \ \ \ \ \ \ \ z w
\ \ \ \ I I \\ \ ) 1 \\ ---\\ I -/ / - �' - / � / / / I ( y \ ` \ \ \ l \ \ \ \ \ \ \ �' \ ) > O � 0-
-\ I \ \ \ -\ / /--- / // / / I —� ,� / \ \ \ \ \ \ \ \ \ / /\ % / \
\ I I \\\ \I I \ \ l\\ \\\ 1 \ \ I I / I /' _ - / // ' / // / /Rob yn i !`� /N j \ \ \\ \\ \ \ // — //\ /r _� l \\ \\11
0_ O 0
\ \ \ I - - / / /R/ 1506, P s99 / \ � \ \ \
\ �\ \ I ) \ I / �-- /' —/ / ' / / Pla,e5h 5493 / / �O / — \ / \ \ \ \ \ \ \ \ -- \—___ —\ 0_ C)
\ \\ J 1 \\, 1 \ \\ \ \\ \\ \ \ \\ ° \ /_—_\ \ I I / \ I( �' —_/-- _--' � � � / /' // / ,/ // //%19645-6,335' �� // .I \�\_ �\ \ / 1/\ \ p� \\ ( �\ \ \ \ \ � _/ // \—^\ \ N >_ z
I \ \ \ \ \ \ I \ - / � / / �' /� \ \ \ \ \ \ -- \ w
\ \ \ \ \ l / I � / / - Zr0 Sanit-cry Sewer / / , / �o \ � \ / I I - -� � _ U �
\ \ J \ \ \ 1 I / \ v -I I I \ - / / — l / l /24 (-' ) / / I , � \ \ \ \ \ \ \ 0 W
\_I 1 \ I \ I I \ \ ) / a ement As -Pe-r � _/ / / � / / / / > I �� / f�� � \ \ \ \ \ \ ' \ Z a-
�, /'1 1 \ `\ `\ \ ) , / II '\ \ \ \\- '- ` % ,'/'//� // /' / lar/Slide 6346 v- --\ // 11 T3 / , \ / ' �� / 0 �', \ �' /X i \ 1\ \ \ \ \\\ \\ MIDDLE Ti� ET \\ I O
\ / 11 \ \ \ \ \ \ / I \ \ \ / /' / /' / / /' / /' _ l D.B. 929, P Maim /269 / ' ) l 7� ' x / /' \ \ 1 �� \/ I \ I 1T/f \ \ \ \ / \ \
\ \ ` Il 1 I \\ I I / \\ \\ \\-,-_�-- \\ _-�/ /',' ' /' / - - J_---- �� /-J Pla 5WC549 ' / / /' \ ,'Je\�'� \ ��\ \ \ \ I \ 7�Pe \ \ o \ \ \ I / Privat Pavgdr-- \ w Vl
1 I - 22 / V / / I / d / �\ \ I \ l \ / \ J , / - \ I 0 >
\\ \ I\ \\ \ \ \ —\ �'/ / / , / � i \�_ /—\_� Pin: 670- 5-5229 I / G�,' \ \ \ 2 I \ � �\ . 1 I \ ) � _/ —� _ \ z W
\ \ I I \ \ \ \ — — � � , /' // - _-- _ / I // _ I, , 1 \ \ \ \ I I / / -� -\_ j `�� \ w
\ 1 2
\\ II I 11 � \ \ \ j \ \ \ \ \' / - / \ / � / / / \ \ ' '/ / _-- _-,_ I �I'�I /l li'' ' ` r 9 \� / �\ \\ 11 I ',--� / \ 1 1 \ \ \ \�\--- \/ __r \�- /-------- __���__ \ \ W
\I I 1 ` I \I /' / \\ \\\ \�\,/',--- - ' /// /'' / I COT4 \ �' l \/ / \ \\ II I / /� I � \ 1 �I r fes`\ �\ \ \ o
---- ' , \ ��/ \ I \ I \ I II �/( / I I 1 I\ 1 11 - Ld
II \ II 1 I (\ 1 ( / // \ \ ` \ - / _ /' / /',/ / — _. Chordsinski \ / I \ - - - - _ _ \ \ \ N
ill— I �� _ --- �\ \� A i
I 1 \ \ I \ 1 1 / \-- v -/_ --__ — — /' / I' \�// ) D.lat5l{' 5, 952\495 V / // / / i x \ / /�\ f�� II � \11 � / I I I \ V v �_ ---�^ _ ✓ \ \ W
ch
I 1 / \ I 1 / 1 ) l \ \ _ _ / - � — — — — — — _ — — ' *"_�
��� Pin.19670�45--4234 \ � / - / I I I !� I I I I I \ � ` \
I \ ( I 1 I / / / \ -^� --� _ // / -/ \�/ I /) \ ®►� / , /- ��'� / \\ / / \ I \ (/I / (I I I 1 ` _ — \ \\ \
7 \
\ I ) 1 \ / / / \__- �_____/ — — 'i / / / //' / \ \I \I ( I I I \ \
\ 1 I 1 1 I / ( I \ / - / ',� -'*/- / / / ' NAG SC 4 / / � � n�fp r V / / V / I / I I I I � - _ \ \ \ \
I I I I / \ / \ \ --_----
I / I I I I \ I \ / _-_/ __ J - �i/ / / \,� LLN - \ / �/ / 6 \ I 1 ��I / I I / / / I 1 � / �� \ \ \
\ \ / �- 1/ 1 \�- -\ /
I 1 II lix
\ i \ \ `\\\\\—_—' /\ \�—� J __// — D.Bd96 11fs /�/ ` I r /� //O / / / / M \ \ 1 '� \� II �P� I /l /r i \\ \ �� / /' /---��_--_— \I \ \\ \
\�—_—' ---/-- ' �l / � , �' --/ / / / I / / \ J1 ' / \ / \ N M tD
\ - Plat5h e I / / I / , / ` \ \ \ W
\ ` \ \ k - Pin: 9670- - 9 ; / - Mb \ A B CULVERT I ; \ ` - 1
I 1 \, \ \ \ \\ �----' ,�_ � '�'-\� �' - �' \--�I (/ /� / ,'- / / ' 20.41 ACRES / ( � � /I / // \ /M / � / / —— I // � / \\ I HEREBY CERTIFY THAT THIS
1 \ \\ / - f ---�/ /� / - / J
I 1 \ \ — \ -1 _ — /T _ I � / \ K I I / — W � / / / PLAN AND AS PREPARED BY ME OR
/ \ / _ / , \ / \ / / \ / / / I / , / / / J UNDER MY DIRECT
/ / / , / / , — SUPERVISION AND THAT I AM
\ \ \ \ \ — _ _ _ _ , \h\ \ \✓/ — i ' t /' R� / I � / ( %/ I , \ I I I \ / / / // / I / // / A DULY REGISTERED
,� i _� _ /
\ \\ \ \ \ \ ---- / ,/— `--- — _— _' r—\ \\\- / /S2k,0 \\// -1 /� �� /_ � / Ma /� I / I / Il �/ -"\
\ / � \ _ter / I ( /r,' // /// /^—� (I //' ,' / / //' — ARCHITECT OR ENGINEER
UNDER THE AWS OF THE
\ \ _� — / � \ — 1 �\ hens ^ \ \� / /
\\ \\ _ �, __ ,�'----/ —_/ 3 �\ \\--ADB. 4, Pg. 670— ,— -- \ \ _—___
\ \ \ I / /— / r / I i\ I\ / ( f `\ \'/ ,' // �i� \\ / ) // / / //
\ _ — _ — _ ide-5493 / � _ — / / , / / / / ASASIGNIFIED BY MY HAND CAROLINATE OF NORTH
\ _ \ \� / - / 5 \ I \/ / /� / /
\ \ _ , — — \ ` ` \ Pin: 0-45-2154 / / / /_ \ \ \ / / / , / /X I / / /\ A ( \ _ �'' ' /' /\ \ / / ' �' �, — — — AND SEAL.
\ \ — — \ _ ' — \ -, \ ' / — — \ 1 , / / 1 , / / / / / / / / / / / — ���%II a iI1iii1i
_ CA
I I i / I , / / .,
� --- — -LINED -►-- - CULVERT 4 / I\� \ / ( 22 0 /" / / / / / /- / * ' - / I I ' I / / _- 0�"' ES3r. •fir';
\ /
-\ , -- J-/ - / -, \ I S \ \ \ �' P POSED J / ��- / �- 1 I I / ' / - �� �'
\ \\ — -_ — _ - _-_ x�� _ _' .91 ACRES / \ \ 1 / / ( /' /, / I DIS URBED G 1 \ / _ \\ ( \ I I I I / Ir / — / _ ' `Y _
\, /- _ ---_ � _ \/� - / - - �' \ \ % \ ; / / l // - - , IMI / - 1 � \ _/ / / -' -- \ \ \ I I ( / / / � _ S
S Z50 \ / / / \ - / - \ \ /
\ \ ) ( / I 21
\�\-_- ___-_._ /--- -_--' - _ I/' I----- -----_-'� � � ' N�rG /' / IND CH- 1 \/ / \ /� /- / / �� � /� / \ �\ �/� / '` / - ,- \ \ I I / /
- --__ � �- / LIyE6 CHr / / \ � -- // - , d / / � - \ / - --- \ \ \ \ I / I I I I / / /// �'
\\— __, __---'' /-- 20' Temporary Utilit /— 3 1.6 ------ 1 4 —' \ \ / — -/ �- / \ 2� \ // /�/ \ \�/ ,j -� ' /-- /^ / \ \'\ \ \\ \ I\ I 1 I I — — .'i'� I , /.
E e�rten�As-P�-- _ \ _ \ /
/ \ \ \ \ \ 1 I / �. I D 0�
\ /-' / / / / / / / -�11 - / \ \ \ 1 \
\ _ Plat Slide 6346 r �: 2 8.00 _ - - - / `� \ \ / / / - / / _/ - / N G 25 / / , I \ 1 I I I / / / -
- (See _L�lot� �/ _ _ /-// - i - � - _ \ \I , //' / /I - / �/ 11 L D / 1 /� /' \ \ \ I I I I I I I -' / /'
-- � � — — i � I / 5 t / / — 1 \ '/ — — �' / / / / 3 I / 6 R / / �' / --\ \ I I ( / / // /— i
- ��-- - _-- J \ - / / /I/ , � - �' CH -0 �� /� / \ ) / / / \ \ 1 I I I I 1 I I 1 ) I r
_ _ I g _ - - - - 6 �� � \ ( - —I -' Wil/ � X
\ / - / / / / / , / / \ �, \ \ I I ) I / / I , , 1 I I , ' / (
\---------------' I' / /'� -�\ - __ // �f �� __� - \ - 20 -, )/,/,/ <- �' �j/��' l // /\/-' /-/I : 21,51:00/'/ �/ • / O l / / / ,/ / //\ \ \ \I I I I / I I I I I / // // --'
- �- \ -/ - - / A v / / / \� - / (� / / v I I I I I I I I I I / / / >_ Q
Watkins Family Trust ' - _ — — , — _ — — l / J / / / / / / / / / \ (� ) / / / _ \ I I 1 1 I I / / - — _ �
\ \ l // � // / it / /l � \ - \ /' J' 1 11 11 I I I / / I ( / / z
_ — —
--P-B,1049 1� � / — — / — l / l I l / / (� / \ \ I I I /
\ — Pin: 9670-35-8024 — — — — — — — ' I z ' \ I I I (� I / / / / � ' + ) f \ / I I / Ld
D
- /-- -�� G SC 0 i - / �� — \/ / / � 1 \ I \ 1 I /
�, _ _ L ED -9 j- / / / - / /�j V ` \ / / / I I I I l \ ,/ l // /I I // / l // Ai� / / / / \ DINED CH /INV: 1 �' 0��1> / / ,- / \\ 11 V I\ I 1 \ I I I I 1 I 1 / I I ( / / / / LLJ O �/
------------�v -- _--__- --- / / / ' \ 11 I A \) II 1 II � I I I I \ I I ) I L.L
PRE POINT D / / / I / / � / / / �4 / / / s1 IANGI�� \ \ I \ \ / \ I I I i II i � / o
/ � /)) / / / / /' , v I v v v v II v v // I /) i/� v Q
— POST C � // � // / ' i / � \\ I I i \ I 1 i I
— — — _ — \ I STREAM DISCHARGE / / / / / \/ �\/ / / P•Q RW / 1 1 I I I 1 \ \ I 1 I I 1 0' o'
Sanit / / / / / ) / / / 1 / /¢, / / / I 1 \ 1 1 I � I I I I p Q W
GG / v \ / / l / l / I l �/� / �1 / / / I I I I I ( I \ \ \ I 1 I / -
---_---- 0.43 ACRES -' ' / . / / /\� I ) 0 , - \ 1 I 1 0
_ \ / 1 Ea eme7- - As Per _\ - v v \ l / ./' \ II I 'T/ / / / / / J V I\ 1 1 V I [ \ 1 \V A \\ \ 1 I I I I I I / ' v� w
/ _
Lj
------ I l Sl de 6 6-� vv /\ / l' �/ / �2 1 / / A 1 I A I \ I V I I 1 I /
/I � / , /\ \ I 1 1 \ \ \ I I I / / , z � _
\ \ _ \ ,' /' �� / ` \ POST POINT D / / / / / N sc25o / \ \ \ \ I I I I Q 0-
— — / / f 21 CULVERT AB 1 \/ I , L / / z / \ \ I \ \ \ \ \ \ \ 1 \ I I 1 I \ \ I 1 / _j 0
y _____ A� I / �- - /v v � / �� Rw / / / _/ \ V I V A V A V A \ \ ', V I \ I I /
\ `--\ ',' / / ' , 1 \ \ I / N G SC250 � /TEMPORARY i / I I 1 1 \ \ 1 \ \ \ I I \ 1 1 I \ \ \ I I I I �
�, - / , \ ��, DISCHARGE ( / u D H-2 \ - l r \ \ 1 1 I `/ Q
— — / / ;X\ \ / I / / \ \ II , I r " I / I ' / \ \ ( ( � CONSTRUCTION/ I I 1 \ 1 \ \ \ \ l \\ \\ \ 1\ \ I I O i
--- e / �/ // / / / / / / / ( / /i / 1 4 ENTRE ICE/E T / \ \ \ 1 \ \ \ \ \ \ � \ \ \ 1 \ I � z
- x t /' / �, __/ �1 I �_ 1 /' / / /// / / / I / / / 1 - I I 1 \ \ \ \ 1 \ \ \ I I
\ \ / I/ / / / , / / \ / J ) INV: 121 / 1 \ 1 z
PRE C / / I / \ \ \ \ \ \ I ) 1 \ I I
�\ / / �h / / I / I \ 1 1 \ \ \ \ \ \
// / / / / I / ( / ( I I / ) / \ \ \ \ I \ 1 v Q
0.29 ACRES 3 ,x /i / I �, // /, , / I I I \ I\ / / - r / / o \ \ /�/ / / / \ 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ � \_- I x , I� / / � / / / — , / I 1 (\) / I / I l INV: 1151. 10 \ / POST B '� 1 / /'-\' �/ \ 1 1 \ \ \\ \ \ \ \ \ \ ` \ \\ \ \ \ \\ \\ \\ \ II I \\ O
\ \ \ \ \ \ \ \ \ \ \ \ z
\ 1 \ \ \ \
\ - \ y i / / / / \ CENTRAL // ) ) 1 / /' \ cH s / / i /' / -_ \ \\ \ \ \ \ \ \ \ o
/ \ / / / �" \ I 1 .17 ACRES /' / �� \\ \ \\ \\ \ \\ \\ \\ \\ \ \\ \\ 1_ \\ \\ \ \ \\ \\ \\\ \\ \ \\ 0 J
\ \\\ , \ , I / / \
\ - \ ' I� I,1 / / '\/ 11 2.76 ACRES / / / / 1\ I �/ \ \ \ \ \ \ \
\ `\ \ `\ \ ` ` \ ` - - xl x / �/ ,/ ' \/\ X / -// I' \ /, / / ' / / // / �( ' ' ' Rw — � ' / 3� //II t/ / ' ,' \ -/- \ \\ \\ \\ \\ \\ \\ \� \ \ `\ \ \ \ \ `\ \ \ \ \\ W W
\---\\ I I I / \\\ \ \\\ \\\ \\ `
\ \ \ \ \\ — \--- �\'� I / / \� / ( > ;///// /) // / / / / / / / \� / —SRW / //) / L \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ z
11, \\ \`\ \ \\ \\ \\ \\ \ I / I / // / /' / \� I - �0 �� � �/, / /// / / / // / / / / /' ` // // POST CH 8 ,- �/ / / c' / / �/ / �/ / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \\ \\ \\\\ \ o
\ \ / / / / — / �x/ /� /� / // / / / / 10 Y �o'� ' — \ \ \ cn
/ 0.37 ACRES/ \ S HR RIl4NGLE / ,' \ \ \ \ \ \ \ \
\ \ \ \ \ / \ I 1� / / /— I / / \ \ \ \
/ / - '!� / / / / — \ \ \ \ \
\ � \ \ \_ 1 I -- 11 � \ / P / / / � /��� iris �*10 / / // / / // -S / / / / / / i505 , / , / - I I I / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ o
3:
\ \ \ \ \/---_-__ \ , \ / / My / / , / I // / / / / / / / / l / / / / / ' / / / , F / l /A / I Ixl I - \ \ \ \ \ \\ \ `\
\ \ \ \ \ \ \ \ \ \ \ \ \
\\ \ \\ \ \ ---- - __ \ / / r i / ��'/ / / l / / � / / / / Ma/ / / / / / / �.., I / / -�' - \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ Boorcash 293 ` \ \ ' / ) I ) / / / / / / / / / N G S 25 - /\ l I I 1 I I I / / - \ \ \ \ \ \ \ \ \ \ \ \ n
\ I / o / / / / ' / 1 / / �/ ' ' / / / / L ED H= ' % ` \ \ / /\\ \ \ \ \ \ \ \ \
/�/ / / /I I I I I I I I I / / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Q_
l l / / / / I / \ \ \ \ \ \ \ \
J / / I I / / I / / I / I I / \ \ \ \ \ \
\ \ \ \ \ — \ \-Pin.�670-34 X6\35 \ I I \ �a \ \ / / / /// / / / % I 1 1 1 I / / I \ I I I / \ \ \ \ \ \ \ \ \ \ \
\ \ 1 \ \ \ \ ` - / i, I - \,-/---- / ' % /, / I I / I I I \ 1 / / \ I / / — \\ \\ \ \ \ ` \\\\
\ \\ \\ \\ \ \\ \\ \\ \ \ \\ \\ \\ \\ \
\ \\ —\ \ \ \\// /// // I ,,I j/ I� I / II
) \ __ _ \ \ /- / /// / / / / / / I ) I ( / / r I / I/ �' � / / / /\ / / I I / / L\ \\ \ \\ \ \ \\ \ \ \ \ \\ \\\ \ \\\ \
\ � - - \ \ / 1 /-__ /'///////"" / / / I ) / l l I 1 / I / /I II I I r
I 1 l � I I I \\ \\ \\
I ,.�� T'�i: ,,�(� I \ \ 1 I / ( 1 / / I I I / _ \ \ \ \ \ \ \ \ \ \ \\ \\ \\ \\ \\ \\ \ \ \ \\ o �
\ \\ \ \ a 1t
\_ \ \\ \ I , / / / / /i'- 1\ / / / / /�/ / / / � 4 1 1 \ \ I I / / I \�� \ \ \ \ \ \ \ \ .� NIT
\ \ \ \ l / // v I I \ \ 30 I ) \ \ \ \ \ \ \
/ ) I / I I I ( / \ \ \ \
\ I Ad/D // II I I II% I I I I I lI(I _\ \\\\\ \\ W
5
\ \ \ \ / / PB, I. / /� / / , / / 1- -I- I l 1 \ \ \ \ \ ` \ \I \ \ \ I 1 I I 3 I ( ) - ) J I I I I / \ \ \ \\ \ \ \ \ `\ \ \ \ \ \\ \ \ \ \\ \ \ , \ , \ U
\ \ \ - - / PRE A / / / / / ( - I ( T—\ _I _ I \ I \ ` \ I I � I I I 0 / I I\ � / , / ) I \ \ \ \ \ \ \ \ \ \ \ \ a� I--1 z N
\ \ \ \ \ , / bt / \ \ \ \ \ \ \ o0 00
\_ \\ \ \ \ / l Pn:9 / / / \ I s / / / I \\ \\— \\ \\ I 1 I I I I I / \ \ \
v v vv \ 24.53 ACRES //( ( I I I v -v I I v v v v v v 1 I ) \ \1z 0 FE4 0 00 T
\ \ \\ \ \\ \ \ ( / / I � I I \ l I \ \ �� I I I I I x/ I / I / / I) c \ \ \ \
vv \ 1 / - ) / (I I \( I I I 1 I \ vv A \v A V v � v— v I A I I / I I I I / I v v vA v v\ v V v v � - v v vv v v 0 w
\ \ \ \ \ \ , / , / / \ \/ ) / I I I \ \ 1 \ \ , / I / / - ! \ \ \ \ \ \ a 00 es Ak
\ \ \ \ \ \\ -" 1-1 / / / / I) / / I I I 1 1 I 1 I \ I 1 \ \ 1 \ \ LI \
\ \ \ \ \/ / I I I \ \ \ \ \ \ \ \ \ \ I I 1 \ IJ I / / / / I ) I )l // /- I\ \\ \ \ \\ \ \ \ \ \\ \\ --- _\ \\\\ \\ \ \\ \ = c kn
\\ \ \\ \ \ \\ \ \ \ ,/ / / / ,- / 1 1 \ II I ( I I I I 1 \ 1 \ \ \ \ \ \ \ \ \ \\ \ \ — — — i 1 I \ \ / / / / / / I I / / \\ \ \\ \ \\\\\ \ \ \ \ \\ \\ \ \\ \ \ \\\ \ \ O w
\ \ \ � / / l /- \ \ l l Lauhtr l I I I \ \ I I I I �\ I \ \ \ \ \ \ \ \ \ \\ ® ) 1 1 / 1 / / / / / l ) I , \ \ \ \ \ \ -\ \ \ � \ \ \ \ \ �;�Fo
- _ \ l \ \ \ \ I \ \ � / / / ' I ID.B. 948 , 9�9 ' 1 \ \ 1 \ 1 1 \ \ \ 1 \ \ \ \ \ \ / \ / I I / / / / / / / / / - \ \ \ \ \ \ \ \ \ \ � \ \ 0 U
\ \ 1 / / I I / / / �• I I \ \ \ \ \ \ _ \\ \ \ \ \ \ \ \ \ \ yr
\ 1 1 / / \ / / / I lPin: 967 -44-3~613 1 I 1 I I \ 1 \ 1 I \ \ \ \ \ \ / l / I / / / / / I I ' / \ \ \ \ \ \ \ \ \ �_- \ \ \ \
I I I \ \ \ \ / / / , 1 \ 1 \ \ / — / / \ \ \
1 \ \ \ \ \ \ , r ( / / / / ( ) \ \\ I / , / \ 1 \ \ \\ \� --/-/ / x ) / / /' I I /� \ \ \ \\ \\\ \\\,-,-\\\ \\\\\\ \ \ `\`\\\ \ \ A eq
\ / 00
11
/ / - \ \ \ \ / / \ I\ I ) / / \ I \ \ \ \\ /' / (A / / / I I / \ \..
/ / \ \ \ \ \ \ \ \ \ \ .ji
I I I (I --\\ \ \\ \ � \ \ \ \.,-J I I I / ) I ii \\1\ 1 ( ) ) 1 I 1 / � \ 1 \ I / / / / � / / ) f 1 I \ 1 \ \ \ \ \ � \ ___ - / / / 1 / 1 I l I \ \ \ \ \ \� \ \ \\ \
1 1 I I / \ \ \ --) I \ / I I ) 11 \ I , / \ 1 \ - / / / / / 1 I I l / / \ \ \ \ \ \ z"
1 \ - \ /( ( \II 1 /I I \ \\ / / / // / ) (� l \ I- - -/ , l 1 / I l l \ \ \ \ \\ \ \ \ \\ \ \
/ I \ 1 \ / PRE B 1 / \ \ \ \ \ \ \ 0
, ` \ - \ \ \ \\ \ \1 / / I r / //1 1 1\\\ II I /) � I\ I / / _ // / // I / f \ 1 \ \ \ _ �\ \ \ \ \ \ \ \
\ / \ \ \ I I l 1 / I / / , I I I I 1 I I 1 \ 1 1 / , / j / / I l i / / / I / I ( 1 \ \ \ \ Canno>i \ I - , l I l / / _ \ \ \ \ \ \ \ � \ \ \
'� \\ _� \\ \ \\ \ I \ \ I / ( / / / / l�lll \�) 1111j I / I I I / /�- / / / -/ / / / I 1 \ 892,P.; 1 .29 ACRES / I / l I / I / / \\\\ \ \\\ \\\\ \
I / / / / / / / I I 1 1 , ,
I I\ J^ \ \ \ \ \ / I / 1 / / / I I X11 III I ( � , , - / / , / / I I \ I \ �� 9 \ , / / / I 1,-,\\
\ \ \ \ � \ \ \ \ \ � \ \ \ \ \
\ \ \ I \ I I \ - - - - - / I / / l I l / I 1 1 1 I I I I / / / / � ,/ / , � \ / ) / / / / I I I \ I \Pin: 96, 0-44-5656\ \ I / I 1 ' / 1 / / I / / / /' - - \I \, \ \ \ \ \ \ - \ \ \ \ \ \ \ \
v ) / � l \V / / � I A\ v v v A v v V A \\\
I \ \ \ 1 \ \ / 1111 (I / / / / / / 1 1 \ \ I / / / / / _-
I I \ \ \ \ \ I / / / I ) / / I I ( / / I / / / / / / \� ( / / I \ \ \ , i / / I / / -\ \ \ \ \ \ \ \ \ \ \ \ \ \
1 f-- \ \ \ / 1111 11 , / / , / I I 1 \ I / / / / / I ) \
/ / \ \ / i / / / I , \ \ \ \ \ \ \ \ \ \ \
\ \ ` — /— / / / Per lat Sh X49 / l — — — — — \ \ \ \
` \ \ \ \ \ \ \ \ \ \ \ \ \ / / / ) / I / J I I l l / / ( / , - / / / / r / - \ \ \ GO R� ht-o/J-Whl As / / I / \ \ \ \
1 \ \\ \ `- \\ \ \ \ \ \ 1 \\ \\ \ \ \ \ ' / / / //n\ I I1111I11 ) I (\ / / ' /' /' � ' / ) II II \ \ - \ \ / / ' / £� // )/ / /' / / / ' , -^\\ \\ \\ \ \ \ \ \ \ �\ \ \\\ \\\ \ \SCALE: 1 = 40
\ `_ \ \ \ \ \ \ \ I 1 � / / / /// ^ I)) I II // / I 1 1 \ ) / ( j / / / ' - / /' / f I 1 \ \ \ \\ --- / / // / /r� / ( / / I I / \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \\�- \\ _ - \ 1 \ \ \ \ ��\ I / / / / /, / 11 I I I I l \ 1 /, / / / / / \ \ \/ / / / ^// , / / / I ( / / \ \ \ \ \ \ \ \ \ \
1 \ \ _ � \ \ \ \ \ 1 I / / / / / I I I I 1 l / I / I I I 1 _ 40_ _ 0\ \ 2� \ 40 \ \ \ \ X20 \ / /
\ \ \ � \ \ � I \ \ \ \ \ \ ` - J /' i ' / ' I / I I / I / 11' //I)11 I I l I I 1 I /� / / / / / / /,, I I /, ___� I l I I \ \ \ \ \ \ � / / / / / / � / / / I I / � / l ) I I l / - \ \ \ � \ \ \ \ � \ \\ \\ \\\ DATE: 02 05 18
\ ` -\ I \ \ - /\ ' i / / / \ ` \ \ \ ` DRAWN BY: JTP
1 I_ - \ \ , / I I 1 I / IIf I \ 1 1 I / / / / / / / / /' / ' / I I ( , \ I I` \ \\ \\ ��\\ \ / / / / / / \ / /) l I / / / I I ( I / 1 \
/ / / I / I // 1I ( \ \\\ \ \ 1\, I = \4� tI \ \ \
� \ 1 c I \\ /- / / l I l 1 / /I ( \ I I I I 1 / / / (\ � ) > // // � / I I 1 \ \ I\ \\ \ \ \ \ \-�- // / //J / \ \ 1 / � / � J (I // / / I I ) I l / � \ \ \ \ \ \
\\ \� II I`-_ I I I I I \1 `\ \\ \\ \ - / / / / I I l 1 / II1111(/ I 1 I / ( \ \ \ � I \ \ \ _-- / / ) I l / / / l l l
/ �/ / I I I / \ v v / r l l 1 v A
\ I J � I I I \ ` \ \ \ �' / , / I /; / ) 11 11 I ) / / / \ 1 I 1 \ \ \ / / l I I / ' / / / / l -GRARHW-SCALE
I -- I / \ I \ , ��� IIII I 1 I I / / / I -, \ \ - - _ / / /_/ / / / /) / / / // / / / / \ \ \ \
\ \ f I /\ � \ � � ///)) I I � I / / I \ � \ \ \ - / / / � / / / / / \ \ \ \ \ \ \ \ \ \ \ \CHECKED BY: BSR
\ \_ , \ \\ / / / / / � ///1 I I \ ! l l l l l l / 1 \ \ \_ \ \ \ \ \\ \ \ \ \
/-/ / 6 1 // 11 / 1j(/ I I \ I / \ /' � '/' _ /� /' /' /' / / / I - \\ \ \\ \ \ \ \ \ \ \ PROJECT MGR: BSR
I / / \ - / / I l / I I I 1 I I I / / / / / / / / I \ \ \ \- - % / \ /' / / --- \_I _ \ \ \ \ \ \ \ \ \ \ \
� - � \ � -/ � I -11 Ill � I I I I I / / \ \\ \\ \ �\ \ \ \\ �\ J \ \ \ \ � / // // , / // / / , / / / \ \ \\\ \\ \\\\ \ \
/ �„/ / // � \_ �- \\ \_-'' / I_ 1-I) \\\\\ \ I I / I I I / / / ( I ---\ — ` _ \\` \ \ \ \ / r- 1\ / / / / / / / / / ' - - \ \ \ \ \ \ \ \ \ \ \
I I I I / / \ I \ \ 1 \ / / / / / \ \ SHEET:
l / I \ \ , \ _ I- — I = I11\1 I I I l I I I I I I I I / \ \ \ \\ 1 \ �\ -\ \--___ � �\ \ \ \ \\ 11 ( / I � / '� //)/ / / /'' / / / / / J I -'/ /�� '` \\\ \ \ \ \ \\ \ \\ \ \\\ \\ \ \ \
_ \ \ \ \ / / / / / / \ \ \ \ \ \ \
\ — \ / 1 \\ \ - / - __\ __\111 I 1 1 \ I I I I I I I I I I \ \ \\\\\ \�_ \\ \\\ \_-__ ----__ \ \ \ \ \� \\ / / l 1 // / / / / // / / ' / / / /' _-' / -\I--- ,_ \ \\ \ \\ \ \ \\ 3
/ / \ \-' /I-_-- \\ I ---Ill \ \ \ I 1 1 / \ \ \ \ 1\ \ \ \ \ \ � \ \---// /1 / , ) � - �' /' // ) / // ' / / / - / / \ \\ \\ \\\ \ \ \ \\ \\\ \` \ \\
\ \ - \ I \ 1 \� \ \ \ \ \ -- - \ \ \ / / / / / / / / / \ \ \ \
1 1 I I:---�'' % \ �vv
_
— `, _--_
�
\\ \I 1 \ I ( 1 1 I I 1 I I \ \ \ I I I \ 1 \ � \\ \ \\ \\ / � � _ / / J / / / / / /' / / / 1 \ I \ 1 I I I \ I I
\ \ \ -
1
\—
\
-- -----
\ I I I I I I I 1 \ I 1
� , \ \ I I \ - \ \ \ Rer\Plat IidsI 5490
/_-\ \ / / / / / Wox1m to cation ofi
\\ \\ \- \\ \\ \ /' / /'/ l / / / / a O'Natura Gas Line
�' / / \--------I^l \ 1 1 \ \ \ \ \ I '- / / �' / / l / / ht of -W As �t/own
LOTI
r / r Plat Slide 9346
D.B. 1592, g. 677 \
vm:,R670-45-7420\
\ \ \ \ \
1 /r I 1 / / / / / /-�' \ vlatslides49S
\\ \ \ \ \ \ \ \ \ \ L\
\hy \ \L4NE
_\ _ ---/'' SRI h Ot Wa S
\ \ \
\ \ 9 f
\- Y � \ \ \ \ \
Pe plat Sl1de\4929\
/Robson
VB. 1306,P.519
/,fSli
1`0' Sanitary Sewer ' / '
]Easement As -Per -
6346 --- / / a / / X \ \ \ \\ \ \\ \ \
k r3 / /� / MIDDLE T ET I \
9 / / /' Privat Pav d
5/1d,549
Pin: 670-lis-Sz29 / _ 3 G \
-\_/ I �i I / X I/' ' �
--' /
--_ '-------- \ \\ \ \ \ \
-
�-
I PlatSl(de5493 /'� \ \\ \ \ \ \ \\ \\ \ \\ I
vin:967ot45-\34 ��
�t �
nif �,- r
- \ \ \ \` ___ \ / I I I / I I I I \ I \ _\ � ___^__✓_--' � � / / \ / _ / tqq, 46 \ x I I �I / I � I 1 ! /I 1 � ( / \ \ \ / / (' J \ \ \ \ \ \ \
116 -
\-
I Pin: 960-
_-IPy 670_
tde3493
-��— —� _
/-- NAq -250
OH -
'LINED /
-- \ \ 11 \ I \ 1 \\ \ \ \\ \\ , - /_-_ '- __ e - - �/, / / •N` t��, � 11 C250 \ / / /f / ' ` � / / � ! } / _�_/ / -\ ( 1 � -� 1 1 / / - \ \ \
in
S
Temporary Utilit
-513 — \ _ — _ -. �/ _ / -
E emeniztsPer-� � —
\ \ \ \ \ \ \ \ Plat Slide 6346 _ — � '•�� \ /v
/
I \ \ \ \ \ \ \ �
I5 3C 0
\
Watkins Fail trus- /\i
Pins 9670-
\ — mt
/
J I I /
/ /
\ III �I / /
9670-5-5-8024- — �C / \ DINED CH
ti I
/ / 1 1 (\ / / 4i / / ¢
-----_�'. _._`;---- / ! � '\ % SI TANG �
/ / \ /INV•
_ PRE POINT D
STREAM DISCHARGE
Sanit
Per
\
\
,
SC250
( II -\\ \ \\ \ \- \\ \_ \\\\\ \ \ ^\_ - / / /' / K \ / / / N SC250, /
\\ \ \\ \ \ \ \` --\ `\ - T/ / / `/'
__ _
\ `- '\1 -\ \\ ) / � TEMPO Y
ENTR NCE E IT
PRE C
0.29 ACRES
V: �51.0
\ 1 \
V / /' / / J � 1 ; '�
/ l / \ 1 / / \ _CH -6 / J I l
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
7r0
'r \ \ \ \ \ \ \
/ / / / ' /' / / / \ \ \ S RIb,NGLE
l H7
Y505 D
1-----
- \-
Book7E �. 213
vm. �
Qb\o-34- 5 \ \ \
\ I I 1 \ \ \ \ / \ \ \ , , / , / 1 � �` '� � , •%�� � j / l \ 1Nor
PRE A
\ \ i 24.53 ACRES
I I 111 I I I ( /
Din:l
96
7 --/
I \
/ / / / \ I I I I 1 \ \ \ \ \ j (/ / •\ \ \ \ � \ \ \ I I / 1 //� \\1\ l ( / I I I I / \ 1 , I / 1 r / / l / I \ I \ \
/ / \ \ \ -\ /
! \ \ \ I / /
/ I \ 1 \ / PRE B
1.29
e //
!�. 9z,vg.�\ / ACRES
\Pin: 9620-44-5656\
\
/
/0'R1ght/ -,1 /I
-9Y4gyAs / ' ' / l / '
------- /
�\
f1l I/I , //(\ � ) / /// I
JOB NUMBER:
18012
,••llc•:
M 1:�
N I Lou
a -
z
O
F-
a_
0f
U
N
W
0
00
0)
N
CO
O
0
W
W
U
W
N
Z
cW
L
O
U
U
Z
O
N
W
0
Z
W
2
W
a_
0
W
N
W
ch
N
H
Z
W
c�
L
O
U
N
ch
U
Z
ch
W
W
W
r�
W
ch
I�H"IMI,40I(0I
I HEREBY CERTIFY THAT THIS
PLAN AND SPECIFICATION
WAS PREPARED BY ME OR
UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED
ARCHITECT OR ENGINEER
UNDER THE LAWS OF THE
STATE OF NORTH CAROLINA
AS SIGNIFIED BY MY HAND
AND SEAL.
LO
re's
W
WJ
z
Z
O
T In
i or-,
W
0
Z
W
V•a'J
W
M
N �
U 1�
Z
•�'"� ONO
iv w
i. kn
O ON
r� 'v
4 r
61 �
N
00
�y N
O �
SCALE: 1 " = 60' 1
y
/1 0/ / r l X8V l
DATE:
\ \
3 / I I //
/
DRAWN
—_,/—
_'
/ I I
'// 1 v \ \>
1
III
I 1 \ \ \ \\ \\ \
kk,_
\
\
I I
�' / / \--------I^l \ 1 1 \ \ \ \ \ I '- / / �' / / l / / ht of -W As �t/own
LOTI
r / r Plat Slide 9346
D.B. 1592, g. 677 \
vm:,R670-45-7420\
\ \ \ \ \
1 /r I 1 / / / / / /-�' \ vlatslides49S
\\ \ \ \ \ \ \ \ \ \ L\
\hy \ \L4NE
_\ _ ---/'' SRI h Ot Wa S
\ \ \
\ \ 9 f
\- Y � \ \ \ \ \
Pe plat Sl1de\4929\
/Robson
VB. 1306,P.519
/,fSli
1`0' Sanitary Sewer ' / '
]Easement As -Per -
6346 --- / / a / / X \ \ \ \\ \ \\ \ \
k r3 / /� / MIDDLE T ET I \
9 / / /' Privat Pav d
5/1d,549
Pin: 670-lis-Sz29 / _ 3 G \
-\_/ I �i I / X I/' ' �
--' /
--_ '-------- \ \\ \ \ \ \
-
�-
I PlatSl(de5493 /'� \ \\ \ \ \ \ \\ \\ \ \\ I
vin:967ot45-\34 ��
�t �
nif �,- r
- \ \ \ \` ___ \ / I I I / I I I I \ I \ _\ � ___^__✓_--' � � / / \ / _ / tqq, 46 \ x I I �I / I � I 1 ! /I 1 � ( / \ \ \ / / (' J \ \ \ \ \ \ \
116 -
\-
I Pin: 960-
_-IPy 670_
tde3493
-��— —� _
/-- NAq -250
OH -
'LINED /
-- \ \ 11 \ I \ 1 \\ \ \ \\ \\ , - /_-_ '- __ e - - �/, / / •N` t��, � 11 C250 \ / / /f / ' ` � / / � ! } / _�_/ / -\ ( 1 � -� 1 1 / / - \ \ \
in
S
Temporary Utilit
-513 — \ _ — _ -. �/ _ / -
E emeniztsPer-� � —
\ \ \ \ \ \ \ \ Plat Slide 6346 _ — � '•�� \ /v
/
I \ \ \ \ \ \ \ �
I5 3C 0
\
Watkins Fail trus- /\i
Pins 9670-
\ — mt
/
J I I /
/ /
\ III �I / /
9670-5-5-8024- — �C / \ DINED CH
ti I
/ / 1 1 (\ / / 4i / / ¢
-----_�'. _._`;---- / ! � '\ % SI TANG �
/ / \ /INV•
_ PRE POINT D
STREAM DISCHARGE
Sanit
Per
\
\
,
SC250
( II -\\ \ \\ \ \- \\ \_ \\\\\ \ \ ^\_ - / / /' / K \ / / / N SC250, /
\\ \ \\ \ \ \ \` --\ `\ - T/ / / `/'
__ _
\ `- '\1 -\ \\ ) / � TEMPO Y
ENTR NCE E IT
PRE C
0.29 ACRES
V: �51.0
\ 1 \
V / /' / / J � 1 ; '�
/ l / \ 1 / / \ _CH -6 / J I l
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
7r0
'r \ \ \ \ \ \ \
/ / / / ' /' / / / \ \ \ S RIb,NGLE
l H7
Y505 D
1-----
- \-
Book7E �. 213
vm. �
Qb\o-34- 5 \ \ \
\ I I 1 \ \ \ \ / \ \ \ , , / , / 1 � �` '� � , •%�� � j / l \ 1Nor
PRE A
\ \ i 24.53 ACRES
I I 111 I I I ( /
Din:l
96
7 --/
I \
/ / / / \ I I I I 1 \ \ \ \ \ j (/ / •\ \ \ \ � \ \ \ I I / 1 //� \\1\ l ( / I I I I / \ 1 , I / 1 r / / l / I \ I \ \
/ / \ \ \ -\ /
! \ \ \ I / /
/ I \ 1 \ / PRE B
1.29
e //
!�. 9z,vg.�\ / ACRES
\Pin: 9620-44-5656\
\
/
/0'R1ght/ -,1 /I
-9Y4gyAs / ' ' / l / '
------- /
�\
f1l I/I , //(\ � ) / /// I
JOB NUMBER:
18012
,••llc•:
M 1:�
N I Lou
a -
z
O
F-
a_
0f
U
N
W
0
00
0)
N
CO
O
0
W
W
U
W
N
Z
cW
L
O
U
U
Z
O
N
W
0
Z
W
2
W
a_
0
W
N
W
ch
N
H
Z
W
c�
L
O
U
N
ch
U
Z
ch
W
W
W
r�
W
ch
I�H"IMI,40I(0I
I HEREBY CERTIFY THAT THIS
PLAN AND SPECIFICATION
WAS PREPARED BY ME OR
UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED
ARCHITECT OR ENGINEER
UNDER THE LAWS OF THE
STATE OF NORTH CAROLINA
AS SIGNIFIED BY MY HAND
AND SEAL.
LO
re's
W
WJ
z
Z
O
T In
i or-,
W
0
Z
W
V•a'J
W
M
N �
U 1�
Z
•�'"� ONO
iv w
i. kn
O ON
r� 'v
4 r
61 �
N
00
�y N
O �
SCALE: 1 " = 60' 1
08/09/18
BY: JTP
r —III)\ 1 I \ \ -\\ \\ \---_ \ \ \\ // / / / / / --- \\ \\ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \, /'
\` I j / / / , \ � / / / / / I
\ \\ \
CHECKED BY: BSR
i \ \ \ `\----------
0\ _ PROJECT MGR: BSR
1 \ \ \ \ \ \ / / ,/ �\\ ,/ // (1 1 / / \ \ \ \ \ I I I I I 1 \ \ \ \ \ \\ - \ �___----_ \ \ \ \ \ \ � I / � Il / I / / l l / / / / \� \ \ \ \ \ \ \ \ \ \\ \ \ \ \ I
/ / / / \\ � \ \ \ \ \ \ \ SHEET:
I 1 \I / � \ I 1 \ I I I I l \ \ \ \ \ - \ \ / I / f/ / / / / I / 1 1 '-� / /\ \ \ \ \ \ \ \ \ \ \ \ / / , , / / / / \ I
\ \ \ \ \ \ \ \
y
/1 0/ / r l X8V l
DATE:
\ \
3 / I I //
/
DRAWN
—_,/—
_'
/ I I
08/09/18
BY: JTP
r —III)\ 1 I \ \ -\\ \\ \---_ \ \ \\ // / / / / / --- \\ \\ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \, /'
\` I j / / / , \ � / / / / / I
\ \\ \
CHECKED BY: BSR
i \ \ \ `\----------
0\ _ PROJECT MGR: BSR
1 \ \ \ \ \ \ / / ,/ �\\ ,/ // (1 1 / / \ \ \ \ \ I I I I I 1 \ \ \ \ \ \\ - \ �___----_ \ \ \ \ \ \ � I / � Il / I / / l l / / / / \� \ \ \ \ \ \ \ \ \ \\ \ \ \ \ I
/ / / / \\ � \ \ \ \ \ \ \ SHEET:
I 1 \I / � \ I 1 \ I I I I l \ \ \ \ \ - \ \ / I / f/ / / / / I / 1 1 '-� / /\ \ \ \ \ \ \ \ \ \ \ \ / / , , / / / / \ I
\ \ \ \ \ \ \ \
3
h
ryN
W
366900
35° 22'E3" N 2
2 Ift
1
993
Soil Map—Henderson County, North Carolina
(White Oak 5)
369000 369100 3692W 369300
it MMi of be valid at this scale.
35° 21'37 N
368900 369000 365100 369200 369300
3
h
N Map Scale: 1:4,540 if printed on A portrait (8.5" x 11") sheet
Meters
NN 0 50 10D 200 300
/VD
0 200 400 800 1200
Map projection: Web Mercator Comer coordinates: WG584 Edge tics: UTM Zone 17N WGS84
uisDA Natural Resources Web Soil Survey
� Conservation Service National Cooperative Soil Survey
3
ryN
W
369500
1 35° 22'8"N
8
a
3
& 93
35° 21'37'N
369500
3
o+
N
8/9/2018
Page 1 of 3
Soil Map—Henderson County, North Carolina
(White Oak 5)
MAP LEGEND
MAP INFORMATION
Area of Interest
(AOI)
Ig
Spoil Area
The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI)
jo
Stony Spot
1:20,000.
Soils
Very Stony Spot
Warning: Soil Map may not be valid at this scale.
0
Soil Map Unit Polygons
Wet Spot
Enlargement of maps beyond the scale of mapping can cause
,y
Soil Map Unit Lines
misunderstanding of the detail of mapping and accuracy of soil
Other
line placement. The maps do not show the small areas of
Soil Map Unit Points
w
Special Line Features
contrasting soils that could have been shown at a more detailed
Special Point Features
scale.
Blowout
Water Features
Streams and canals
Please rely on the bar scale on each map sheet for map
®
Borrow Pit
measurements.
Transportation
)K
Clay Spot
«-rr
Rails
Source of Map: Natural Resources Conservation Service
Q
Closed Depression
Web Soil Survey URL:
,y
Interstate Highways
Coordinate System: Web Mercator (EPSG:3857)
Gravel Pit
US Routes
Maps from the Web Soil Survey are based on the Web Mercator
Gravelly Spot
Major Roads
projection, which preserves direction and shape but distorts
_
distance and area. A projection that preserves area, such as the
®
Landfill
Local Roads
Albers equal-area conic projection, should be used if more
y
Lava Flow
accurate calculations of distance or area are required.
+L
Background
Marsh or swamp
.
Aerial Photography
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Mine or Quarry
Soil Survey Area: Henderson County, North Carolina
Q
Miscellaneous Water
Survey Area Data: Version 17, Sep 26, 2017
O
Perennial Water
Soil map units are labeled (as space allows) for map scales
V
Rock Outcrop
1:50,000 or larger.
+
Saline Spot
Date(s) aerial images were photographed: May 21, 2015—Nov
28, 2017
Sandy Spot
The orthophoto or other base map on which the soil lines were
Severely Eroded Spot
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
Sinkhole
shifting of map unit boundaries may be evident.
Slide or Slip
Sodic Spot
LSLaq Natural Resources Web Soil Survey 8/9/2018
Conservation Service National Cooperative Soil Survey Page 2 of 3
Soil Map—Henderson County, North Carolina
Map Unit Legend
White Oak 5
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
HyB Hayesville loam, 2 to 7 percent 22.1 55.9%
slopes
HyC Hayesville loam, 7 to 15 17.4 44.1%
percent slopes
Totals for Area of Interest 39.5 100.0%
LSot Natural Resources Web Soil Survey 8/9/2018
Conservation Service National Cooperative Soil Survey Page 3 of 3