Loading...
HomeMy WebLinkAbout20090134 Ver 1_Information Letter_20090414 J?,tEO ST?TFP m UNITED STATES ENVIRONMENTAL PROTECTION w REGION 4 i ° ATLANTA FEDERAL CENTER ; o F 61 FORSYTH STREET t c PRO, E° ATLANTA, GEORGIA 30303-8960 April 7, 2009 Colonel Jefferson Ryscavage District Engineer Attn: Mr. William Wescott, Project Manager Washington Regulatory Field Office Wilmington District, Corps of Engineers P.O. Box 1000 Washington, North Carolina 27889-1000 (5q of -3 / ?? „ ??Qc?-c?nbP G >.ryrtrFq_ ?Op9 Q Subject: North. Carolina Department of Transportation; Daniel Street Extension TIP No. U-3826 Action I.D. #SAW-2009-00101 Dear Colonel Ryscavage: This is in response to the Public Notice for the North Carolina Department of Transportation's (NCDOT) Daniel Street Extension project (TIP No. U-3826). According to the public notice, the applicant proposes to construct a two-lane facility on new location, including a new bridge across the Tar River. Impacts are proposed to the Tar River and an unnamed tributary to the Tar River, and 1.48 acres of adjacent wetlands (Riverine Swamp Forest and Bottomland Hardwood Forest). As compensation for the permanent wetland impacts, NCDOT proposes to use a combination, of on-site and off-site mitigation, at a 1:1 ratio. The impacts and the proposed mitigation are located in the Tar River Basin (HUC code 03020103). No compensation is proposed for the temporary impacts or stream impacts. The U.S. Environmental Protection Agency (EPA), Region 4, Wetlands and Marine Regulatory Section has reviewed the public notice, the permit application (and March 17, 2009 revisions to the application), the mitigation plans and monitoring reports for the Mildred Woods mitigation site, and other information related to the project. We also discussed this project with your staff by phone on March 19, 2009. We have the following comments for your consideration. As stated above, NCDOT proposes to utilize a combination of on-site and off-site mitigation to compensate for the permanent impacts, at a l:1 ratio. However, EPA does not believe that a 1:1 mitigation ratio is appropriate. The on-site mitigation consists of removal of an old railroad bed to grade, restoring 0.94 acre of wetlands adjacent to the site. EPA recommends a mitigation ratio of 2:1 for the on-site mitigation. This mitigation site has not been constructed yet. The impacts from the road project are to high quality, mature wetlands. An unconstructed forested wetland mitigation site does not provide an equivalent level of function as a mature Intemet Address (URL) • http://www.epa.gov Recycled/Recyclable -Printed with Vegetable Oil Based Inks on Recycled Paper jMlnim um 30%Postconsumer)