Loading...
HomeMy WebLinkAboutNC0003425_Special Order By Consent_20180816 { i a, •,LKi ,.. NORTH CAROLINA ROY COOPER Environmental Quality Governor MICHAEL S.REGAN secretory LINDA CULPEPPER Interim Director August 16, 2018 Mr. Paul Draovitch, Senior Vice President EHS Duke Energy 526 S. Church Street Mail Code EC3XP Charlotte,NC 28202 Subject: SPECIAL ORDER BY CONSENT SOC No. S18-005 Duke Energy Progress, LLC Mayo Plant and Roxboro Plant NPDES Permits NC0038377 &NC0003425 Person County Dear Mr. Draovitch: Attached for your records is a copy of the Special Order by Consent(SOC) approved by the Environmental Management Commission and signed by the Chairman of the Commission on August 15, 2018. The terms and conditions of the SOC are in full effect, including those requiring submittal of written notice of compliance or non-compliance with any schedule date. The following items are brought to your attention as they pertain to the terms and conditions of the SOC: • Payment of the upfront penalty is due no later than September 20, 2018. • Monitoring performed per the terms of the SOC shall commence during the current calendar quarter(July- September), with results submitted to DWR no later than October 30, 2018. Subsequent monitoring and reporting shall occur as specified in the SOC. , IDIEQ.00) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000 Mr. Paul Draovitch S18-005 Transmittal p. 2 Pursuant to North Carolina General Statute 143-215.3D, water quality fees have been revised to include an annual fee for activities covered under a Special Order by Consent. Duke Energy will be subject to a fee of$500.00 on a yearly basis while under the Order. The initial fee payment will be invoiced at a later date, with future fee invoicing done on an annual basis. If you have any questions concerning this matter, please contact Bob Sledge at(919) 807-6398. Sincerely, Linda Culpepper .rot Attachment cc: Central Files NPDES Unit— SOC File ec: Raleigh Regional Office—DWR/Water Quality Regional Operations Shannon Langley—Duke Energy Sara Janovitz—EPA Region 4 Jeff Poupart—DWR/WQPS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION COUNTY OF PERSON IN THE MATTER OF ) NORTH CAROLINA ) SPECIAL ORDER BY CONSENT NPDES PERMITS NC0038377 & ) NC0003425 ) EMC SOC WQ S18-005 ) HELD BY ) DUKE ENERGY PROGRESS, LLC ) Pursuant to the provisions of North Carolina General Statutes (G.S.) 143-215.2, this Special Order by Consent is entered into by Duke Energy Progress, LLC, hereinafter referred to as Duke Energy, and the North Carolina Environmental Management Commission, an agency of the State of North Carolina created by G.S. 143B-282, and hereinafter referred to as the Commission. Duke Energy and the Commission are referred to hereafter collectively as the "Parties." 1. Stipulations: Duke Energy and the Commission hereby stipulate the following: a. This Special Order by Consent("Special Order") addresses issues related to the elimination of seeps (as defined in subparagraphs e, f, and g below)from Duke Energy's coal ash basins during the separate and independent process of basin closure under the Coal Ash Management Act, G.S. 130A-309.200 through 130A- 309.231 ("CAMA") and the Federal Coal Combustion Residuals Rule, 40 CFR Parts 257 and 261. The Environmental Protection Agency first directed permitting authorities to consider potential impacts on surface water of seeps from earthen impoundments in 2010. At that time, Duke Energy began discussions with the North Carolina Department of Environmental Quality ("the Department")regarding seeps at multiple Duke Energy facilities, including identifying certain seeps in permit applications and providing data to the Department regarding seeps. In 2014, Duke Energy provided a comprehensive evaluation of all areas of wetness and formally applied for NPDES permit coverage of all seeps. Since 2014, Duke Energy has performed periodic inspections and promptly notified the Department of new seeps and sought NPDES permit coverage where appropriate. On March 4, 2016, the Department issued Notices of Violation("NOVs") to Duke Energy related to seeps. EMC SOC WQ S 18-005 Duke Energy Progress,LLC p.2 Decanting(i.e., removal of the free water on the surface of the coal ash basins), which is required before ash basins can be closed, is expected to substantially reduce or eliminate the seeps. In order to accomplish this goal of substantially reducing or eliminating seeps, this Special Order affords certain relief to Duke Energy related to the non-constructed seeps (as defined in subparagraphs f and g below), while requiring Duke Energy to accelerate the schedule for decanting as specified more fully below. Constructed seeps (as defined in subparagraphs e and f below) will be addressed in the NPDES permits. After completion of decanting, for any remaining seeps, whether constructed or non-constructed, Duke Energy must take appropriate corrective action as specified more fully below. b. Duke Energy has been issued North Carolina NPDES permits for operation of an existing wastewater treatment works at each of the following coal fired, electric generation facilities ("Duke Energy Facilities," or in the singular, "Facility"): Permit Issuance Receiving Water Facility Number County Date for Primary Outfall Mayo NC0038377 Person 07/13/2018 Mayo Reservoir Roxboro NC0003425 Person 04/09/2007 Hyco Reservoir c. The Duke Energy Facilities listed above will continue to operate and generate coal ash, and each is subject to the provisions of this Special Order. d. Wastewater treated at coal-fired electric stations includes water mixed with ash produced through the combustion of coal for the steam generation process. Ash is controlled and collected through the use of water, creating a slurry that is conveyed to impoundments or basins with earthen dike walls. In the ash basin, the solids separate from the liquid portion, with the resulting supernatant discharged under the terms of the NPDES permit. EMC SOC WQ S18-005 Duke Energy Progress,LLC p. 3 e. The coal ash basins at the Duke Energy Facilities are unlined, having no impermeable barrier installed along their floors or sides. Earthen basins and dike walls are prone to the movement of liquid through porous features within those structures through a process known as seepage. Each of the Duke Energy Facilities covered by this Special Order exhibits locations adjacent to, but beyond the confines of, the coal ash basins where seepage of coal ash wastewater from the coal ash basins may intermix with groundwater,reach the land surface (or "daylight"), and may flow from that area. Once such seepage reaches the land surface, it is referred to as a"seep." Each of the seeps identified at the Duke Energy Facilities and addressed in this Special Order exhibit some indication of the presence of coal ash wastewater. Both(a) confirmed seeps and(b) areas identified as potential seeps that were later dispositioned, are identified in Attachment A. f. Some of Duke Energy's coal ash impoundments contain constructed features on or within the dam structures (such as toe drains or filter blankets)to collect seepage. This wastewater is conveyed via a pipe or a constructed channel directly to a receiving water. These discrete, identifiable, point source discharges are or will be covered and regulated by the respective NPDES permits and designated as outfalls therein. The characteristics of these wastewater flows are similar to those discharging from other permitted outfalls for ash basin effluent. In this Special Order, seeps that are (1) on or within the dam structures and (2) convey wastewater via a pipe or constructed channel directly to a receiving water are referred to as "constructed seeps." Seeps that are not on or within the dam structure or that do not convey wastewater via a pipe or constructed channel directly to a receiving stream are referred to as "non-constructed seeps." g. Non-constructed seeps at the Duke Energy Facilities often exhibit low flow volume and may be both transient and seasonal in nature, and may, for example, manifest as an area of wetness that does not flow to surface waters, a point of origin of a stream feature, or flow to an existing stream feature. These circumstances of the non-constructed seeps make them difficult to discern, characterize, quantify and/or monitor as discrete point source discharges. This creates challenges in permit development and compliance monitoring because it is difficult to accurately monitor for flow and discharge characterization. Non- constructed seeps at the Duke Energy Facilities present significant challenges to their inclusion in NPDES permits as point source discharges, but they do cause or contribute to pollution of classified waters of the State. Therefore, these non- constructed seeps are addressed in this Special Order rather than in an NPDES permit. EMC SOC WQ S 18-005 Duke Energy Progress, LLC p.4 h. A subset of these non-constructed seeps at the Duke Energy Facilities do not flow directly to surface waters, but flow to some portion of an NPDES permitted wastewater treatment system. In such instances,the seeps may be referenced in NPDES permits as contributing flow-to a permitted outfall. Any non-constructed seep that falls within this subset is identified in Attachment A by the following statement in its description: "This non-constructed seep flows to a portion of an NPDES wastewater treatment system." Investigations and observations conducted by the Department and U. S. Army Corps of Engineers staff have concluded that some seeps emanating from Duke Energy's coal ash ponds create and/or flow into features delineated as classified waters of the State or Waters of the United States. j. Collectively,the volume of non-constructed seeps is generally low compared to the volume of permitted wastewater discharges at the Duke Energy Facilities. k. In 2014, Duke Energy conducted a survey of each coal-fired electric generation station to identify potential seeps from the coal ash surface impoundments. Duke Energy included all areas of wetness identified around the impoundments as seeps, and submitted applications to include those seeps in NPDES permits. Beginning in 2015, Duke Energy has implemented semi-annual surveys to identify new seeps in the vicinities of the coal ash basins. Additional seeps have been observed and documented during these surveys and reported to the Department pursuant to a Discharge Identification Plan mandated by CAMA. Additional investigation has determined that not all of areas identified in 2014 are seeps, but each Duke Energy facility does have multiple seeps. 1. The Department issued NOVs to Duke Energy on March 4, 2016 for the seeps that emanate from the unlined coal ash surface impoundments at the Duke Energy Facilities. m. Non-constructed seeps create conditions such that certain surface water quality standards may not consistently be met at all Duke Energy monitoring sites. n. The presence of coal ash influenced water in the non-constructed seeps causes or contributes to pollution of the waters of this State, and Duke Energy is within the jurisdiction of the Commission as set forth in G.S. Chapter 143, Article 21. EMC SOC WQ S18-005 Duke Energy Progress,LLC p. 5 o. A list of seeps identified in the vicinities of the coal ash surface impoundments at the Mayo and Roxboro plants, as well as their locations, and the bodies of water those seeps may flow into (if applicable), can be found in Attachment A to this Special Order. P. Duke Energy must close the coal ash surface impoundments at all North Carolina coal-fired electric generating stations in accordance with applicable requirements set out in CAMA and the Federal Coal Combustion Residuals Rule,requirements of which are independent of the resolution of seeps addressed in this Special Order. q. Decanting of wastewater performed at Duke Energy's coal ash basins is expected to eliminate or substantially reduce the seeps from the ash basins at the Duke Energy Facilities. r. Since this Special Order is by consent,the Parties acknowledge that review of the same is not available to the Parties in the N.C. Office of Administrative Hearings. Furthermore, neither party shall file a petition for judicial review concerning the terms of this Special Order. 2. Duke Energy, desiring to resolve the matters causing or contributing to pollution of the waters of the State described above,hereby agrees to do the following: a. Penalties 1) Upfront Penalty. As settlement of all alleged violations due to seepage at these Duke Energy Facilities,pay the Department, by check payable to the North Carolina Department of Environmental Quality, a penalty in the amount of$150,000, calculated based upon$12,000 each for ten constructed seeps identified prior to January 1, 2015 and $6,000 each for five non-constructed seeps identified prior to January 1, 2015. A certified check in the amount of$150,000.00 must be made payable to the Department of Environmental Quality and sent to the Director of the Division of Water Resources (DWR) at 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 by no later than thirty(30) days following the date on which this Special Order is approved and executed by the Commission, and received by Duke Energy. EMC SOC WQ S 18-005 Duke Energy Progress,LLC p. 6 No penalty shall be assessed for seeps identified after December 31, 2014, given Duke Energy's inclusion of seeps in permit applications and compliance with the Discharge Identification Plan required under CAMA. By entering into this Special Order, Duke Energy makes no admission of liability, violation or wrongdoing. Except as otherwise provided herein,' payment of the upfront penalty does not absolve Duke Energy of its responsibility for the occurrence or impacts of any unauthorized discharges in the area of the Duke Energy Facilities that may be discovered in the future, nor does the payment preclude DWR from taking enforcement action for additional violations of the State's environmental laws. 2) Stipulated Penalties. Duke Energy agrees that unless excused under paragraph 5, Duke Energy will pay the Department, by check payable to the North Carolina Department of Environmental Quality, stipulated penalties according to the following schedule for failure to perform activities described in paragraphs 2(b, c, and d), or for failure to comply with interim action levels listed in Attachment A. Failure to meet a deadline in the Compliance $1,000.00/day for the first seven Schedule in 2(b) of this Special Order days; $2,000.00/day thereafter Failure to meet any other deadline in this $1,000.00/day for the first seven Special Order days; $2,000.00/day thereafter _ Exceedance of an interim action level listed in Attachment A $4,500.00 per monitored exceedance Monitoring frequency violations $1,000.00 per violation Failure to submit, within 210 days of the completion of decanting at each Facility, adequate amendments to groundwater Corrective Action Plans or Closure Plans to $5,000.00 per day,to a maximum of address all remaining seeps, whether $1,000,000.00 per electric generating constructed or non-constructed,through facility. corrective action as applicable under paragraph 2(d) of this Special Order.2 1 See especially paragraph 2(a)(2) excepting newly identified seeps from future penalties under certain conditions. 2 Failure to adequately implement any amended Corrective Action Plan or Closure Plan will be handled in the normal course. EMC SOC WQ S 18-005 Duke Energy Progress, LLC P. 7 As long as Duke Energy remains in compliance with the terms of this Special Order, as well as CAMA and conditions of any approvals issued thereunder, the Department shall not assess civil penalties for newly identified seeps. b. Compliance Schedule. Duke Energy shall undertake the following activities in accordance with the indicated time schedule. No later than fourteen(14) calendar days after any date identified for accomplishment of any activity, Duke Energy shall submit to the Director of DWR written notice of compliance or noncompliance therewith. In the case of compliance, the notice shall include the date compliance was achieved along with supporting documentation if applicable. In the case of noncompliance,the notice shall include a statement of the reason(s) for noncompliance, remedial action(s)taken, and a statement identifying the extent to which subsequent dates or times for accomplishment of listed activities may be affected. Duke Energy shall accelerate compliance with the requirements of G.S. 130A- 309.210(d) and (f) such that all projects necessary to eliminate discharges of stormwater into the surface impoundments at the Duke Energy Facilities and to convert to dry bottom ash handling shall be complete prior to the deadline for initiating decanting set out below. 1) Complete dry ash handling projects in accordance with the following schedule Facility Fly Ash Bottom Ash Mayo Complete Complete Roxboro Complete 5/31/2019 2) Initiation of Decanting Mayo 6/30/2019 Roxboro 6/30/2019 3) Completion of Decanting Mayo 12/31/2020 Roxboro 6/30/2020 This schedule is premised upon timely issuance of necessary permits or approvals, and no requirement imposed by DWR to implement physical/chemical treatment during decanting except as required by an NPDES permit. Should any of these assumptions prove to be incorrect, the Parties shall renegotiate these deadlines, provided that the final expiration date of this Special Order will not be affected by such renegotiation. EMC SOC WQ S 18-005 Duke Energy Progress,LLC p. 8 4) Termination of Special Order This Special Order shall terminate on a facility-by-facility basis on the later of the following dates: • 180 days following completion of decanting; or • ` 30 days following the approval of an amended groundwater Corrective Action Plan and/or Closure Plan as appropriate (if an amendment is submitted in compliance with subparagraph d. below). c. Additional Compliance Measures. Duke Energy shall undertake the following additional compliance measures: 1) If the monitoring of any classified water of the State receiving flow from seeps regulated by this Special Order indicates exceedance of any interim action level established by the Special Order, Duke Energy shall increase monitoring at that location from quarterly to monthly until concentrations of monitored characteristics return to those observed at the initiation of the Special Order. If any interim action level established by the Special Order is exceeded by more than 20%in a single sampling event, or exceeded for two (2) consecutive monitoring events, in addition to paying the associated stipulated penalty,Duke Energy shall conduct a re-assessment of the contributing seep(s), including, but not limited to, evaluation of proposed remedial actions for treatment and/or control of the seep such that impacts to the receiving waters are quickly mitigated. A report compiling the findings of the re-assessment, including proposed remedial actions, shall be provided to the Director of DWR within 60 days of any applicable exceedance. Following its review, DWR shall notify Duke Energy of its concurrence or disapproval of Duke Energy's proposed remedial actions. 2) Once the decanting process is initiated, within thirty (30) days after the end of each quarter, Duke Energy shall provide reports on the status of decanting work and other activities undertaken with respect to closure of each coal ash surface impoundment to DWR. The quarterly reports are due by April 30, July 30, October 30 and January 30 while this Special Order is in effect. The reports are to be submitted as follows: one copy must be mailed to the appropriate Regional Office Supervisor for each facility and one copy must be mailed to the Water Quality Permitting Program, Division of Water Resources, 1617 Mail Service Center, Raleigh,NC 27699-1617. EMC SOC WQ S 18-005 Duke Energy Progress,LLC P. 9 3) Duke Energy shall conduct annual comprehensive surveys of areas down gradient of ash basins identifying new seeps, and documenting the physical characteristics of previously documented seeps. All examinations of seeps must include identification of seeps by approximate latitude and longitude and date-stamped digital photographs of their appearance. A report summarizing the findings of the surveys, including a section analyzing the effect decanting of the basin(s)has on seep flows, accompanied by copies of the photographs noted above ("Annual Seep Report"), shall be submitted to DWR in conjunction with submittal of the April 30 quarterly report noted in 2(c)(2) above. This Annual Seep Report must list any seep that has been dispositioned (as described below) during the previous year, including an analysis of the manner of disposition. For purposes of this Special Order, "dispositioned"includes the following: (1) the seep is dry for at least three consecutive quarters; (2)the seep does not constitute, and does not flow to, waters of the State or Waters of the United States for three consecutive quarters; (3)the seep is no longer impacted by flow from any coal ash basin as determined by the Director of DWR in accord with applicable law and best professional judgment; or(4) the seep has been otherwise eliminated(e.g., through an engineering solution). If a seep that has been dispositioned through drying up reappears in any subsequent survey, such a seep will no longer be deemed dispositioned and can be subsequently re-dispositioned as specified above. Non-constructed seeps described in paragraph 1(h) of this SOC cannot be dispositioned through option(2) above. 4) No later than 90 days following the completion of decanting at each Facility, and in the same manner as in the annual surveys, Duke Energy shall conduct a comprehensive survey of areas down gradient of ash basins identifying new seeps, and documenting the physical characteristics of previously documented seeps. All examinations of seeps must include identification of seeps by approximate latitude and longitude and date- stamped digital photographs of their appearance. A report summarizing the findings of this survey, including a section analyzing the effect decanting of the basin(s) has had on seep flows, accompanied by copies of the photographs noted above, shall be submitted to the Director of DWR ("Final Seep Report"). This Final Seep Report must list any seep that has been dispositioned (as described in subparagraph(3) above) during decanting process, including an analysis of the manner of disposition. The determination of whether a seep is dispositioned rests with the Director of DWR. At, or at any time prior to, submission of the Final Seep Report, Duke Energy shall seek formal certification from the Director of DWR, certifying the disposition of any seep that Duke Energy has characterized 'as dispositioned. Any seeps not certified as dispositioned by the Director of DWR shall not be deemed as dispositioned. EMC SOC WQ S 18-005 Duke Energy Progress, LLC p. 10 d. Further Corrective Action. Following completion of decanting, if any seeps (including both constructed and non-constructed seeps)have not been certified by the Director of DWR as dispositioned (as described in subparagraph c. above), Duke Energy shall conduct a characterization of those seeps.3 Duke Energy shall submit a report on the findings of these characterizations ("Seep Characterization Report")to the Director of DWR within 150 days of completion of decanting at each Facility (i.e., within 60 days of the submittal of the Final Seep Report). The Seep Characterization Report must include all sampling data for each remaining seep as well as Duke Energy's evaluation of the jurisdictional status of all seeps at the relevant Facility. The determination regarding whether a surface water feature is a classified water of the State rests with DWR. Within 60 days of the submittal of the Seep Characterization Report, Duke Energy shall submit a complete and adequate proposed amendment to the groundwater Corrective Action Plan and/or Closure Plan as appropriate for the Facility describing how any seeps identified in the Seep Characterization Report will be managed in a manner that will be sufficient to protect public health, safety, and welfare, the environment, and natural resources. This proposed amendment will go to public comment. Duke Energy shall submit documentation that the proposed modification has been submitted to the appropriate division within the Department that has authority for approving modification of the groundwater Corrective Action Plan and/or Closure Plan. The content of, and DEQ's review of, an amendment to a groundwater Corrective Action Plan shall be consistent with Title 15A, Chapter 2L of the N.C. Administrative Code (specifically including 2L.0106(h)-(o)). The amendment to the Corrective Action Plan and/or Closure Plans shall be implemented by Duke Energy in accordance with the deadlines contained therein, as approved or conditioned by the Department. Failure by Duke Energy to implement the amendment will be handled in the normal course by the Department in accordance with its enforcement procedures (i.e., outside this Special Order). 3 If any seep is dispositioned between the time that the Final Seep Report is submitted and the time the Seep Characterization Report is submitted, an analysis of the manner of disposition must be included in the Seep Characterization Report, and Duke Energy must seek certification of such a disposition from the Director of DWR. Only if such certification is received prior to the due date of the proposed amendment described in paragraph 2(d)may such a seep, certified as dispositioned, be omitted from the proposed amendment. EMC SOC WQ S18-005 Duke Energy Progress,LLC p. 11 For clarity, listed below is a summary of the timetable for the documents due after completion of decanting (as described in 2(c)(4) and 2(d) above): Document Due Date Final Seep Report 90 days after completion of decanting 150 days after completion of Seep Characterization Report decanting (i.e., 60 days after submission of Final Seep Report) Proposed amendment to groundwater 210 days after completion of Corrective Action Plan and/or Closure decanting(i.e., 60 days after Plan submission of Seep Characterization Report) e. Interim Action Levels. 1) Duke Energy shall perform monitoring of waters receiving flow from non- constructed seeps in accordance with the schedules listed in Attachments A and B, except as noted in paragraph 2(c)(1) above. 2) Upon the complete execution of this Special Order, with regard to non- constructed seeps, interim action levels for the receiving waters (which are minor tributaries) are hereby established as noted in Attachment A. The interim action levels are site-specific. Duke Energy shall monitor at approved sampling sites to ensure interim action levels are met. Interim action levels shall remain effective in the designated surface waters until the applicable termination date in paragraph 2(b)(4) is reached. 3) Monitoring associated with seeps covered by this Special Order is exempt from the electronic reporting requirements associated with NPDES permits. Results of monitoring required exclusively per the terms of this Special Order shall be reported to the Director of DWR in a spreadsheet/worksheet format agreed to by Duke Energy and DWR. Monitoring data shall be submitted to the Director of DWR in a digital t format no later than 30 days following the end of each calendar quarter for as long as the Special Order is in effect. Monitoring data shall be sent to the following email address: desocdata@ncdenr.gov. Data from those sites with monitoring required exclusively per the terms of the Special Order will be posted on DWR's website to provide the public with the opportunity for viewing. 3. Duke Energy will continue to operate its coal ash surface impoundments in such a manner that their performance is optimized, and potential for surface waters to be affected by seeps is minimized. EMC SOC WQ S 18-005 Duke Energy Progress, LLC p. 12 4. Duke Energy shall make available on its external website the NPDES permits,this Special Order and all reports required under this Special Order for each of the Duke Energy Facilities no later than thirty(30) days following their effective or submittal dates. 5. Duke Energy and the Commission agree that the stipulated penalties specified in paragraph 2(a)(2) are not due if Duke Energy satisfies DWR that noncompliance was caused solely by: a. An act of God; b. An act of war; c. An intentional act or omission of a third party, but this defense shall not be available if the act or omission is that of an employee or agent of Duke Energy or if the act or omission occurs in connection with a contractual relationship with Duke Energy; d. An extraordinary event beyond the Duke Energy's control, specifically including any court order staying the effectiveness of any necessary permit or approval. Contractor delays or failure to obtain funding will not be considered as events beyond Duke Energy's control; or e. Any combination of the above causes. 6. Failure within thirty(30) days of receipt of written demand by DWR to pay the stipulated penalties, or challenge them by a contested case petition pursuant to G.S. 150B-23,will be grounds for a collection action, which the Attorney General is hereby authorized to initiate. The only issue in such an action will be whether the thirty(30) days has elapsed. 7. Any non-constructed seeps causing or contributing to pollution of waters of the State associated with the coal ash impoundments at Duke Energy's Mayo and Roxboro electric generation stations, and listed in Attachment A to this Special Order, are hereby deemed covered by this Special Order. Any newly-identified non-constructed seeps discovered during the annual investigations for seeps referenced in paragraph 2(c)(3) above, or at any other time while this Special Order is in effect, and timely reported to the Department per the terms of CAMA and this Special Order, shall be deemed covered by the terms of the Special Order, retroactive to the time of their discovery. Newly-identified non- constructed seeps must be sampled for the presence of those characteristics listed in Attachment B to this Order. Newly-identified non-constructed seeps found to be causing or contributing to pollution of the waters of the State, with the effect of causing a violation of water quality standards in surface waters not already referenced in the Special Order, may require modification of the Special Order to address those circumstances. EMC SOC WQ S18-005 Duke Energy Progress, LLC p. 13 8. Noncompliance with the terms of this Special Order is subject to enforcement action in addition to the above stipulated penalties, including, but not limited to injunctive relief pursuant to G.S. 143-215.6C or termination of this Special Order by the Director of DWR upon ten(10) days' notice to Duke Energy. Noncompliance with the terms of this Special Order will not be subject to civil penalties in addition to the above stipulated penalties. 9. This Special Order and any terms or conditions contained herein,hereby supersede any and all previous Special Orders,Enforcement Compliance Schedule Letters, terms, conditions, and limits contained therein issued in connection with NPDES permits NC0038377 and NC0003425. 10. This Special Order may be modified at the Commission's discretion,provided the Commission is satisfied that Duke Energy has made good faith efforts to secure funding, complete all construction, and achieve compliance within the dates specified. In accordance with applicable law, modification of this Special Order will go to public notice prior to becoming effective. 11. Failure to pay the up-front penalty within thirty (30) days of execution of this Special Order will terminate this Special Order. 12. In addition to any other applicable requirement, each report required to be submitted by Duke Energy under this Special Order shall be signed by a plant manager or a corporate official responsible for environmental management and compliance, and shall include the following certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. 13. This Special Order shall become effective in accordance with state law, and once effective, Duke Energy shall comply with all schedule dates,terms, and conditions herein. EMC SOC WQ S 18-005 Duke Energy Progress,LLC • p. 14 This Special Order by Consent shall expire no later than June 30,2022. FoWuke Energy Progress, LLC: \\....) Amp - vt 111111111, .10 .--__, .org OP -.......r/Illiw g(if ( st Paul Draovikh Date Senior Vice President, Environmental, Health& Safety For the Nort Par V ina En./ronmental Management Commission: 4(/ g3/ 1 I ►� J. D, fo om.n, P.E. C 4 it of the Commission Date Attachment A S18-005 Duke Energy Progress, LLC—Mayo Steam Station, p.1 Constructed Seeps Seep ID Approximate Location Coordinates Receiving Number Description Receiving Waterbody Waterbody SOC Monitoring Interim Action Latitude Longitude Classification Levels N/A—Flow is collected and pumped back to NPDES- 5-01 36.538849 -78.893512 Seep flow from west permitted wastewater toe drain system in accordance with N/A N/A N/A ' the pumping system's design capacity. N/A—Flow is collected and pumped back to NPDES- S-02 36.537964 -78.891364 Seep flow from east permitted wastewater toe drain system in accordance with N/A N/A N/A the pumping system's design capacity. *Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A S18-005 Duke Energy Progress, LLC—Mayo Steam Station, p.2 Non-Constructed Seeps Seep ID Approximate Location Receiving Number — Coordinates Description Receiving Interim Action g Waterbody Waterbody SOC Monitoring Latitude Lon itude Classification– Levels Minor seep forming within filter bed at the Monitoring in toe of the west dam and flowing into an UT to Crutchfield eld B Branch N/A–2B Standards S-01A 36.538903 -78.89351 Crutchfi unnamed tributary(UT)to Crutchfield Branch • downstream of Apply Branch all seep flow contributions Minor seep forming within filter bed 20 feet Monitoring in upslope of east dam toe drain(5-02) Crutchfield S-02A 36.538005 -78.891611 Crutchfield Branch N/A–2B Standards collection box,flowing into Crutchfield Branch B Branch. downstream of Apply all seep flow contributions Monitoring in Minor seep forming just downgrade of S-02 Crutchfield S-02B 36.537989 -78.891339 collection box,flowing into Crutchfield Crutchfield Branch N/A–2B Standards B Branch. Branch downstream of Apply all seep flow contributions S-03** 36.538654 -78.890714 Sampling Location;not a seep Crutchfield B N/A–Seep N/A–Seep Branch Dispositioned Dispositioned S-04** 36.538896 -78.89341 Sampling Location;not a seep Crutchfield B N/A–Seep N/A–Seep Branch Dispositioned Dispositioned 5-05** 36.535039 -78.891693 Ash Basin Sampling Location;not a seep Mayo Lake Ws-v N/A–Seep N/A–Seep Seep flow to small channel that originates Dispositioned Dispositioned S-06* 36.521971 -78.88526 southeast of power plant. Flows to Mayo Mayo Lake WS-V N/A–Seep N/A–Seep _______ Lake. Dispositioned Dispositioned *Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A 518-005 Duke Energy Progress, LLC—Mayo Steam Station, p.3 Seep ID Approximate Location I Receiving Number Coordinates Descri tion Receiving p Waterbody SOC Monitoring Interim Action Latitude Longitude Waterbody Levels ��" Classification Intermittently observed area of wetness downslope from former production well location. No flow observed during recent 5407* 36.521798 -78.892152 evaluations.Any flow would drain Mayo Lake WS-V N/A—Seep N/A—Seep southeast,merging with flow at S-06 before Dispositioned Dispositioned reaching Mayo Lake. From sampling—No CCR impacts. Monitoring in Seep forms one ridge over(east)from east Crutchfield S-08 36.537502 -78.890398 toe drain,flowing northwest in small Crutchfield Branch N/A—2B Standards channel to Crutchfield Branch. Branch B downstream of Apply all seep flow Natural stream flow to Mayo Lake contributions S-09* 36.522902 -78.886868 originating southeast of plant. Location is upstream of,and flowing toward S-06. From Mayo Lake WS-1/ N/A—Seep N/A—Seep sampling—No CCR impacts. Dispositioned Dispositioned Monitoring in Minor seep to small channel,flowingCrutchfield S-10 36.538422 -78.890395 Crutchfield Branch N/A—2B Standards northwest into Crutchfield Branch. Branch B downstream of Apply all seep flow contributions *Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Mayo Steam Electric Power Plant — Water Quality Monitoring Locations b ' '• IV / — S-01A ••c. 'C'' c () •,.., .c S-C-I213---- ----44 = \ -----• J - — ._.... . . 1--------- S-10 -.... ' ,.. . ki/ Ash ' ) • • ' , Basin • ilial, / 4• ,. , • ... . .,. v , of 'v, • e, . . • r • ..0.° .„- N., 9 Mayo Lake \ v - , .,•• / - , r,.. , , / t t ,. . • • I-, 4'„ '4. ' : I , .de • : • '.. . A ,' •-*% . ' ,.'' 1;4:- - , .. ve • 4. ;- , . - ,. # 1 It • -... ,- 1%-: 44111.14140e • fi , , , ,,ey ,,,,40 * Stream Monitoring Attachment A 518-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.1 Constructed Seeps Seep ID Approximate Location Receiving Number Coordinates Description Receiving Interim Action — -- Waterbody SOC Monitoring Waterbody Levels Latitude Longitude Classification IHeated — ^� Water N/A—Seep Chimney drain discharge from active ash Discharge N/A—Not a S-01 36.47704 -79.0765 I basin dam to Heated Water Discharge Pond flowingj Classified contribution N/A—Not a Pond. Surface analyzed in Classified Surface to NPDES NPDES Permit Water permit outfall Water — J— ( monitoring 1 003 Heated Water N/A—Seep Chimney drain discharge from active ash Discharge N/A—Not a g contribution N/A—Not a 5-02 36.47706 -79.0767 basin dam to Heated Water Discharge Pond flowin Classified Pond. g Surface analyzed in Classified Surface to NPDES NPDES Permit Water permit outfall Water monitoring —~ 003 Heated Water N/A—Seep Chimney drain discharge from active ash Discharge N/A—Not a S-03 36.47699 -79.077 basin dam to Heated Water Discharge Pond flowingcontribution N/A—Not a Classified Pond. Surface analyzed in Classified Surface to NPDES NPDES Permit Water I permit outfall Water monitoring — — — I 003 — -- Heated - Water N/A—Seep Chimney drain discharge from active ash ' Discharge N/A—Not a contribution S-04 36.47692 -79.0772 basin dam to Heated Water Discharge Pond flowingClassified N/A—Not a Pond. Surface analyzed in Classified Surface to NPDES NPDES Permit Water --1 — permit outfall I WatereI monitoring ---- 003 * Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A S18-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.2 Seep ID Approximate Location — Coordinates Receiving i Number — Description Receiving j Interim Action Waterbody Waterbody I SOC Monitoring Latitude — Longitude — Classification ` Levels Heated Water N/A—Seep Chimney drain discharge from active ash Discharge N/A—Not a S-OS F 36.47675 79.0774 basin dam to Heated Water Discharge Pond flowingClassified contribution N/A—Not a Pond. , Surface analyzed in Classified Surface to NPDES NPDES Permit Water Water permit outfall I monitoring -- — 003 Heated -- I1 Water N/A_Nota N/A—Seep Chimney drain discharge from active ash Discharge contribution N/A—Not a S-06 36.47669 -79.0776 basin dam to Heated Water Discharge Pond flowin Classified Pond. g Surface analyzed in Classified Surface to NPDES NPDES Permit Water permit outfall Water — — — monitoring 003 Heated Water J N/A—Seep Chimney drain discharge from active ash Discharge N/A—Not a g contribution N/A—Not a S-07 36.47674 -79.078 basin dam to Heated Water Discharge Pond flowing Classified analyzed in Classified Surface Pond. Surface to NPDES Water NPDES Permit Water permit outfall monitoring — — --_—_ 003 N/A— Unnamed Monitoring S-09 36.47823 -79.05607 Discharge from extension of East Ash Basin I tributary(UT) WS-v;B Established per See page 6 of this to Hyco Lake Terms of NPDES Attachment A .... Permit ___ * Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A S18-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.3 Non-Constructed Seeps Approximate Location Tr. _ Seep ID Receiving Coordinates DescriptionReceiving Number i WaterbodyWaterbody SOC Monitoring Interim Action Levels Latitude Longitude Classification Heated Seepage area approximately 30 feet west of Water Discharge N/A—Nota N/A—Seep chimney drain#7.Drainage/flow is to thecontribution 5-08 36.47672 -79.0781 Heated Water Discharge Pond.This non- Pond Classified N/A—Not a Classified constructed seep flows to a portion of an flowing to Surface analyzed in NPDES wastewater treatment system. NPDES Water Surface Water NPDES Permit permit monitoring outfall 003 Minimal AOW with no flow located on N/A—Not a S-10** northern portion of East Ash Basin berm. Extension of 5-10 36.47917 79,057 Classified N/A—Seep Any flow would drain to extension of east East AshN/A—Seep Basin Surface Dispositioned ( Dispositioned ash basin. _ Water Minimal AOW with no flow located on N/A—Not a ** central portion of East Ash Basin berm. An Extension of 36.47857 -79.0567 y East Ash Classified N/A—Seep N/A—Seep 5-11 flow would drain to extension of east ash Basin Surface Dispositioned Dispositioned basin. Water Minimal AOW with no flow located ono N/A—Not a S-12** 36.4781 -79.0567 southern portion of East Ash Basin berm. Extension of Classified Any flow would drain to extension of east East Ash N/A—Seep N/A—Seep Basin Surface Dispositioned Dispositioned ash basin. Water Not a seep.Outfall of culvert channeling flow from UT on east side of facility that See page 6 of S-13** 36.48618 -79.0596 receives flow from East Ash Basin extension Hyco Lake WS-V;B this Attachment See page 6 of this and S-21.Flows to facility water intake A Attachment A channel(Hyco Lake). *Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A S18-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.4 See ID Approximate Location - pI Coordinates ��- Receivin Receiving Number - __- Description E g Waterbody SOC Monitoring Interim Action Levels Latitude Longitude Waterbody Classification Location is the end of a 24"pipe draining a ! Heated boggy area south of the gypsum pad. Pipe Water extends under the pad toward the Discharge N/A-Not a N/A-Seep S-14 36.48374 -79.0638 northwest,under railroad tracks,with Pond Classified contribution analyzed in N/A-Not a Classified discharge to a ditch that drains to the I flowing to , Surface ! Surface Water Heated Water Discharge Pond.This non- NPDES Water NPDES Permit constructed seep flows to a portion of an permit monitoring _ NPDES wastewater treatment system. outfall 003 Seepage to wet area north of active ash Small -�� " stream Quarterly basin.Flows north into a waterbody flowing monitoring at to Heated Water Discharge Pond. flowing to Hardness 1200 mg/L S-18 36.47795 -79.0737 Heated WS-V;B point prior to i ! Waterbody is potentially WOTUS.This non (Nyco Lake) flowing into TDS 1600 mg/L I constructed seep flows to a portion of an Water Sulfates 1000 mg/L I Discharge Heated Water NPDES wastewater treatment system. Discharge Pond. ---- Pond Heated AOW with minimal flow located adjacent to Water the 5-01 chimney drain at the east end of Discharge N/A-Not a N/A-Seep S-19 36.47718 -79.0764 the 1973 ash basin dam.Any flow moves Pond Classified contribution toward the Heated Water Discharge Pond. flowing to Surface analyzed in N/A-Not a Classified This non constructed seep flows to a portion NPDES Water NPDES Permit Surface Water of an NPDES wastewater treatment system. permit monitoring outfall 003 Seep flow to small stream channel northeast Small �. stream Quarterly of West Ash Basin dam.Drains west through monitoring at wetland to Heated Water Discharge Pond. flowing to WS-V;B Hardness 1200 mg/L S-20 i 36.47799 -79.0749 Heated point prior to No sample data due to lack of flow.This (Hyco Lake) flowing into TDS 1600 mg/L i non constructed seep flows to a portion of Water Sulfates 1000 mg/L Discharge Heated Water an NPDES wastewater treatment system. Pond Discharge Pond. __ ___._ -._._ ___ * Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A 518-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.5 See ID Approximate Location P Receiving Receiving Number — Coordinates Description Waterbody SOC Monitoring Interim Action Levels Latitude Longitude Waterbody, --- Classification Monitoring of Seep emerging downgradient of stormwater basin below East Ash Basin. Flow drains UT to Hyco Lake Sulfates 1000 mg/L S-21 36.48246 -79.0559 adjacent to East Ash Basin effluent channel UT to Hyco WS V; B at established Hardness 1000 mg/L from point of emergence to UT to Hyco Lake (Hyco Lake) Duke Energy TDS 1000 mg/L Lake. S-13 monitoring Copper 5 p.g/L ___.._. ___._--- location Located just east of the cooling tower Heated ponds.Wetness emerges from several Water Discharge N/A–Nota N/A–Seep points on the hill side of the area. Minimalcontribution S-22 1 36.48184 -79.0657 flow could eventually reach Outfall 003. No Pond Classified N/A–Not a Classified owing to Surface analyzed in Classified_. sample data to date due to lack of flow.This NPDES Permit Surface Water non-constructed seep flows to a portion of NPDES Water permit monitoring an NPDES wastewater treatment system. out_fa_ll003 Located on sloped area along the southwest _ end of the East Ash Basin dam. Large AOW Heated but with little to no flow. Diffuse flow is Water Discharge N/A–Not a N/A–Seep directed to channel with discharge to contribution S-23 36.48035 -79.0685 Heated Water Discharge Pond and Outfall Pond Classified N/A–Not a Classified flowing to Surface analyzed in Surface Water 003. No sample data to date due to lack of NPDES Permit flow.This non-constructed seep flows to a NPDES Water permit monitoring portion of an NPDES wastewater treatment system. outfall 003 *Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Attachment A • S18-005 Duke Energy Progress, LLC—Roxboro Steam Station, p.6 Instream Monitoring Description Receiving Waterbody Receiving Waterbody -- Classification SOC Monitoring Interim Action Levels Instream Monitoring to Sulfates 1000 m L Unnamed Tributary Monitoring of UT to Hyco Lake at evaluate potential impacts WS-V;B established Duke EnergyS-13 monitoring Hardness 1000 mg/L from 5-9 and S-21 (UT)to Hyco LakeTDS 1000 mg/L location Copper 5µg/L * Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals. **Seep dispositioned via repair and/or non-flowing condition to potentially reach WOTUS,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map. All monitoring shall be conducted per the requirements found in Attachment B of this Order. Roxboro Steam Electric Plant — Water Quality Monitoring Locations 1 N telaks . , _ , . \ ; „ .. CN"'•I t ' • 4i -i, • -1 " --1 , 0.70- \1\12' ' ' )S tt." ...4: • ;0°' ,..,11r ), r Heated ' - '. 1.1or4.---,..4 , irk , , 1 -.. f Water .‘,.., ---: . Hyco / Discharge Ji . , Pond Lake /..4„---iti S-18 Ash Landfill ,—.." S-20 .. --— 1 - -.------ 4k / •411111 ,--i'v.e-, - ijell it *0.\ 7-----7-:- si._ I / 1 \ East Ash Basin 4' i , , 1 ie / „ -- : . _ • West Ash Basin . - , ,.. 1 ; r' , .., * Stream Monitoring Stream Monitoring SOC S18-005 Duke Energy Progress, LLC—Mayo &Roxboro Plants Attachment B Monitoring Requirements The following represents the parameters to be analyzed and reported at all monitoring locations designated within this Special Order. Parameter Reporting Units Monitoring ----- Frequency TSS mg/L Annually Oil and Grease mg/L Annually pH Standard Units(s.u.) Quarterly Fluoride pg/L Quarterly Total Mercury ng/L Quarterly Total Barium -�� N9/L Quarterly 'vy Total Zinc pg/L Quarterly Total Arsenic l.►g/L Quarterly Total Boron pg/L Quarterly Total Cadmium _ — pg/L Quarterly Total Chromium pg/L Quarterly Total Copper pg/L Quarterly Total Thallium pg/L Quarterly Total Lead pg/L Quarterly Total Nickel pg/L Quarterly Total Selenium pg/L Quarterly Nitrate/Nitrite as N mg/L Quarterly Bromides mg/L Quarterly Sulfates mg/L Quarterly Chlorides mg/L Quarterly TDS mg/L Quarterly Total Hardness mg/L Quarterly Temperature °C Quarterly Conductivity, { mho/cm pmho/cm Quarterly