HomeMy WebLinkAbout20090491 Ver 1_Approval Letter_20090604Amr.'WA
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Division of Water Quality
Coleen H. Sullins
Director
June 4, 2009
USMC Camp Lejeune
Attn: Carl Baker, Deputy Public Works Officer
Public Works Division
1005 Michael Road
Camp Lejeune, NC 28542
Dee Freeman
Secretary
DWQ Project # 09 0491
Onslow County
Subject Property: MCON P-03113; Sneads Ferry Road and Marines Road Utilities
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Baker:
You have our approval, in accordance with the attached conditions and those listed below, to temporarily impact
0.698 acres of jurisdictional wetlands and converting 3.42 acres of jurisdictional wetlands by mowing of a
maintenance corridor for the installation of approximately 7 miles of utilities (water and power), as described
within your permit application dated April 24, 2009 and received by the Wilmington Regional office on May 7,
2009. After reviewing your application, it has been determined that the impacts are covered by General Water
Quality Certification Number 3699 (GC3699). The Certification allows you to use Nationwide Permit 12
when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise
comply with any other required federal, state or local permits before you go ahead with your project including
(but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application
shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your project,
you must notify us and you may be required to send us a new application. If the property is sold, the new owner
must be given a copy of this Certification and approval letter and is thereby responsible for complying with all
conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of
stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval
requires you to follow the conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
L Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions of
this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including
incidental impacts:
Wilmington Regional Office
127 Cardinal Drive Extension Wilmington, NC 28405
Phone: 910-796-7215 / FAX: 910-350-2004
Internet: www.ncwaterguality.org
An Equal Opportunity/Affirmative Action Employer
50% Recycled/ 10% Post Consumer Paper
NorthCarolina
Naturally
Customer Service 1-877-623-6748
Page Two
USMC Camp Lejeune
Attn: Carl Baker, Deputy Public Works Officer
DWQ # 09 0491
Jun 4, 2009
Amount Approved (Units) Plan Location or Reference
Stream N/A (feet)
404/401 Wetlands
Temporary
Converted (maintenance corridor)
0.698 acres
3.42 acres
P-031 Utility installation
Figures 5 - 22 (in File)
Waters N/A (acres)
2. Sedimentation and Erosion Control
Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-Construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur.
4. No Sediment & Erosion Control Measures within Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within six months of the date that the Division of
Land Resources has released the project.
Page Three
USMC Camp Lejeune
Attn: Carl Baker, Deputy Public Works Officer
DWQ # 09 0491
Jun 4, 2009
5. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES
General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project.
This General Permit allows stormwater to be discharged during land disturbing construction activities as
stipulated by conditions in the permit. If your project is covered by this permit [applicable to
construction projects that disturb one (1) or more acres], full compliance with permit conditions including
the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required.
A copy of this permit and monitoring report forms may be found at
lat1p://h2o.enr.state.ixc.iis/su/F'orms Documents.htni.
6. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return the attached certificate of
completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service
Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to
waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the
404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland impacts),
you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To
ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes
to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification
and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone Ian McMillan in the Central Office in Raleigh at 919.733.1786 or
Joanne Steenhuis in the DWQ Wilmington Regional Office at 910.796.7215.
Sincerely,
Coleen H. Sullins, Director
i" Division of Water Quality
Enclosures: GC 3699
Certificate of Completion