Loading...
HomeMy WebLinkAbout20181124 Ver 1 - GREENS_AT_TRYON_PRELIMINARY_PLAN_07302018 - 8/13/2018 12:47 PMAS NOTEDCOVER1.1PROJECT DIRECTORY PROJECT OWNER FCP Brian Stai 703.357.6240 bstai@fcpdc.com CONSTRUCTION NORTH STATE ENVIRONMENTAL Nate Martin n.martin@nsenv.com ENGINEER JENNINGS ENVIRONMENTAL Greg Jennings, PHD, PE 919.600.4790 greg@jenningsenv.com SHEET INDEX COVER SHEET 1.0 SPECIFICATIONS AND STANDARDS 2.0 SPILLWAY CHANNEL CROSS-SECTION 3.0 SPILLWAY AND OUTFALL DETAILS 4.0 RE-VEGETATION PLAN 5.0 PERMITTING AND IMPACTS 6.0 GREENS AT TRYON POND SPILLWAY STABILIZATION THE GREENS AT TRYON - 2805 PAR DRIVE, RALEIGH, NORTH CAROLINA PRELIMINARY PLAN SUBMITTED ON JULY 30, 2018 PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018 AS NOTEDNOTES AND STANDS.2.1PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018GENERAL SPECIFICATIONS 1.THE PROJECT SHALL BE CONSTRUCTED ACCORDING TO THE CONTRACT AND APPLICABLE PLAN SHEET(S), DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER CONSTRUCTION DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE “CONSTRUCTION DOCUMENTS” MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. THE CONTRACTOR SHALL NOTIFY THE PROJECT OWNER AND ENGINEER OF ANY CHANGES PRIOR TO IMPLEMENTATION. THE PROJECT OWNER IS FCP AND THE ENGINEER FOR IS JENNINGS ENVIRONMENTAL. 2.THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. THE CONTRACTOR SHALL ADHERE TO THE PROVISIONS OF THE 1985 UNDERGROUND DAMAGE PREVENTION ACT, NORTH CAROLINA GENERAL STATUTES 887, CHAPTER 785, SENATE BILL 168, ARTICLE 3. TO ASSIST THE CONTRACTOR AND UTILITY OWNERS IN MEETING THE REQUIREMENTS OF THIS LAW, THERE IS A “ONE-CALL SYSTEM” CALLED “NC ONECALL.” MOST MAJOR UTILITIES WITH UNDERGROUND FACILITIES IN THE STATE SUBSCRIBE TO THIS SERVICE. FOR CALLS ORIGINATING WITHIN NORTH CAROLINA, THE NC ONECALL TELEPHONE NUMBER IS 811. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR DELAYS OR INCONVENIENCE SUSTAINED BY THE CONTRACTOR DUE TO UTILITY RELOCATION OR ADJUSTMENTS MADE SOLELY FOR THE CONVENIENCE OF THE CONTRACTOR. NO ADDITIONAL PAYMENT WILL BE MADE FOR RE-MOBILIZATION REQUIRED BY THE UTILITY'S FAILURE TO RELOCATE A UTILITY AT THE REQUEST OF THE CONTRACTOR. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ARRANGE FOR SUCH CHANGES, AND THE CONTRACTOR SHALL BEAR ALL COSTS OF SUCH CHANGES. 3.FIELD CONDITIONS AND PROJECT VARIABILITY MAY REQUIRE ADAPTATION OF THE PLANSHEETS AND/OR DETAILS PROVIDED IN THE CONSTRUCTION DOCUMENTS DEPENDING ON SITE CONDITIONS OR PROJECT NEEDS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN ON THE PLANSHEETS AND/OR DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK AND WILL NOT CONSTITUTE A CHANGE IN UNIT OR LUMP SUM PRICES. 4.THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED STOCKPILE LOCATIONS OR TO A LOCATION SPECIFIED BY THE PROJECT OWNER OR ENGINEER. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED ON THE PLAN SET OR ON THE MATERIALS LIST. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 5.COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE GENERAL SPECIFICATIONS, CONSTRUCTION DOCUMENTS, CONTRACTOR QUALIFICATIONS, CONSTRUCTION SPECIFICATIONS, SHALL BE THE EXPENSE OF THE CONTRACTOR. CONTRACTOR QUALIFICATIONS 1.THE CONTRACTOR SHALL HAVE AT LEAST TWO (3) YEARS OF RIVER RESTORATION CONSTRUCTION EXPERIENCE AND SHALL HAVE COMPLETED AT LEAST FIVE (5) RIVER RESTORATION PROJECTS. SIMILAR EXPERIENCE WILL BE EVALUATED ON A CASE BY CASE SCENARIO. 2.IF THE CONTRACTOR CHOOSES TO DESIGNATE AN EMPLOYEE WITHOUT QUALIFIED STREAM RESTORATION EXPERIENCE, THE CONTRACTOR SHALL BE ON-SITE AT ALL TIMES WHEN THE EMPLOYEE IS PERFORMING RIVER RESTORATION WORK. FAILURE TO ABIDE BY THIS CONDITION WITHOUT PREVIOUS AGREEMENT WITH THE PROJECT OWNER AND ENGINEER WOULD BE GROUNDS FOR TERMINATION. 3.THE CONTRACTOR SHALL MAINTAIN AT LEAST $2,000,000 IN LIABILITY INSURANCE AND HAVE PROOF OF LIABILITY INSURANCE ON-SITE DURING THE ENTIRETY OF PROJECT CONSTRUCTION. 4.THE CONTRACTOR SHALL HAVE PROOF OF WORKER'S COMPENSATION INSURANCE ON-SITE DURING THE ENTIRETY OF PROJECT CONSTRUCTION. 5.COPIES OF ALL PROJECT PERMITS SHALL BE ON-SITE. THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE PERMITS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY KNOWN CHANGES OR ACTIVITIES THAT COULD VIOLATE PERMIT REQUIREMENTS PRIOR TO IMPLEMENTATION. EROSION AND SEDIMENT CONTROL SPECIFICATIONS THE CONTRACTOR SHALL INSTALL AND MAINTAIN ALL NECESSARY EROSION AND SEDIMENTATION CONTROLS TO MINIMIZE SOIL EROSION AND TO CONTROL SEDIMENTATION FROM AFFECTING WATER RESOURCES OF THE STATE OF NORTH CAROLINA. ALL E&SC MATERIALS AND METHODS SHALL COMPLY WITH NCDOT'S 2018 STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SECTION 16. 1.ALL PROJECT AREAS (BANK ZONES, ACCESS AREAS, STOCKPILE AREAS, ETC.) DISTURBED DURING CONSTRUCTION SHALL BE RE-VEGETATED IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS UPON COMPLETION OF THE WORK. 2.EXCAVATED MATERIAL MAY BE TEMPORARILY STOCKPILED WITHIN THE LIMITS OF THE INDIVIDUAL PROJECT AREAS. SILT FENCE OR COIR WATTLES SHALL BE USED TO PREVENT SEDIMENT MIGRATION FROM THE TEMPORARY STOCKPILES TOWARD ANY WATER BODY AND/OR UNDISTURBED AREA ON THE SITE. ANY STOCKPILED SOIL WHICH IS NOT USED WITHIN 10 WORKING DAYS OR 15 CALENDAR DAYS, WHICHEVER IS SOONER, SHALL BE COVERED WITH TEMPORARY SEEDING OR WITH EROSION CONTROL MATTING. ALL TEMPORARILY STOCKPILED SOIL SHALL BE REMOVED AND/OR INTEGRATED INTO THE FINAL WORK. 3.PROJECT AREAS SHALL BE SEEDED AND MULCHED AND/OR MATTED WITH TEMPORARY AND WITH PERMANENT (PERENNIAL) GRASS SEED (OR SOD), WITHIN 10 CALENDAR DAYS OF COMPLETING THE FINAL GRADING WORK. 4.AREA SPECIFIC EROSION CONTROL MEASURES ARE SHOWN ON THE PROJECT CONSTRUCTION DOCUMENTS AND/OR DETAIL SHEETS. 5.EROSION CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH ALL APPLICABLE PERMITS. THE CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES UNTIL THE SITE IS STABILIZED. ALL EROSION CONTROL MEASURES AND MATERIALS SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO FINAL INSPECTION. 6.THE CONTRACTOR MAY BE REQUIRED BY THE PROJECT OWNER AND/OR ENGINEER TO INSTALL ADDITIONAL E&SC MEASURES BASED ON SITE CONDITIONS DURING CONSTRUCTION. STANDARD LINES AND SYMBOLS EXISTING SANITARY SEWER PIPESS EXISTING STORMWATER PIPE EXISTING PARCEL BOUNDARY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 315 314 TEMPORARY TREE PROTECTION FENCE TEMPORARY SILT FENCE LIMITS OF DISTURBANCE STANDARD CONSTRUCTION ENTRANCE STAGING AREA LOD PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED CHANNEL BANKFULL PROPOSED CHANNEL CENTERLINE EXISTING SANITARY SEWER MANHOLE PROPOSED FLOODPLAIN TOE OF SLOPE PROPOSED FLOODPLAIN GRADING LIMITS PROPOSED CHANNEL PLUG PROPOSED SPILLWAY CHANNEL EXISTING EASEMENT 315 314 SW EXISTING ZONE 1 RIPARIAN BUFFER EXISTING ZONE 2 RIPARIAN BUFFER PROPOSED BOULDER GRADE CONTROL EXISTING STORMWATER STRUCTURE 275 280 285 290 295 300 305 310 315 275 280 285 290 295 300 305 310 315 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+73 3.2% 13.0%STA: 0+00.0STA: 1+71.6STA: 1+10.7STA: 1+37.0STA: 0+84.4STA: 1+63.4STA: 1+28.1STA: 1+01.6STA: 1+54.2ELV: 302.1ELV: 288.0ELV: 295.9ELV: 292.5ELV: 299.4ELV: 288.5ELV: 289.6ELV: 293.0ELV: 285.5SSSSSSSSSSSSSSSSSSSSSSSSLOD LOD LOD LOD L O D LODL O D LODLODLOD LOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLOD LOD LOD LO D LOD LOD LOD LOD 303304301300291 292 301300309 3 0 2 308 307 306 305 304 303 296297298 293 294 295 293294295 S T A : 0 + 0 0 . 0 STA: 0+84.4STA: 1+01.6STA: 1+10.7STA: 1+28.1STA: 1+37.0STA: 1+54.2STA: 1+63.4STA: 1+71.60+000+25 0+50 0+75 1+00 1+25 1+50 1+72 SW SCALE: 1" = 20'1" = 20'PLAN - PROFILE3.1FILL GULLY AT BASE OF EMBANKMENT TOE OF SLOPE. RE-VEGETATE WITH DEEP ROOTING NATIVE GRASSES. Feet 0 10 20 PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018PROPOSED ARMORED SPILLWAY CHANNEL FROM POND. SEE DETAIL (SHEET 4.1). ARMORED STEP POOL SYSTEM PER PLAN, PROFILE AND DETAIL (SHEET 4.2). LOD = 11,000 FT2 SPILLWAY CHANNEL SEE DETAIL (SHEET 4.1). BOULDER GRADE CONTROL STRUCTURE SEE DETAIL (SHEET 4.2). ARMOR PRIMARY SPILLWAY FROM POND. 18" CMP POND OUTLET (NOT LOCATED). TYPICAL CROSS-SECTION NOT TO SCALESPILLWAY CHANNEL Q1% WSE W = 23 FT D = 1.3 FT 2 : 1 GRADE TO EXISTING GROUND AT 2:1 SLOPE PER PLAN 2 : 1 2 : 1 2 : 1 700 GRAM COIR FIBER EROSION CONTROL MATTING PER DETAIL PROPOSED SPILLWAY CENTERLINE ALIGNMENT NON-WOVEN GEOTEXTILE FILTER FABRIC AT ROCK - EARTH INTERFACE COMPACTED EARTH PROPOSED GRADE SPILLWAY CHANNEL LINING WELL-GRADED BLEND OF 20% NCDOT CLASS A 40% NCDOT CLASS B 40% NCDOT CLASS 1 1.ALL SPILLWAY CHANNEL MATERIAL SHALL BE QUARRIED STONE UNLESS NATIVE MATERIAL OF SIMILAR SIZE IS AVAILABLE ONSITE AND MEETS THE SPILLWAY CHANNEL SIZE SPECIFICATIONS. THE ENGINEER MUST APPROVE THE USE OF ALL ONSITE MATERIAL. 2.SPILLWAY CHANNEL MATERIAL SHALL HAVE A GRADATION AS DEFINED IN THE TABLE WITHIN THIS DETAIL OR AS APPROVED BY THE ENGINEER. SELECT RIFFLE MATERIAL SHALL BE WELL-GRADED AND MIXED WITH EARTH WHEN IT IS PLACED IN THE CHANNEL. 3.FOR CONSTRUCTION OF THE SPILLWAY CHANNEL, THE CONTRACTOR SHALL OVER EXCAVATE (OR PLACE FILL) THE LENGTH OF THE SPILLWAY. COMPACT THE UNDERLYING EARTH WITH THE EXCAVATOR BUCKET OR VIBRATORY PLATE COMPACTOR. PLACE 8 OZ. NON-WOVEN GEOTEXTILE FABRIC OVER THE COMPACTED EARTH. INSTALL SPILLWAY CHANNEL MATERIAL TO PROPOSED GRADES AND ELEVATIONS.SELECT CHANNEL MATERIAL DEPTH SHALL BE 1.5 FT WITH UNIFORM THICKNESS. 4.THE SPILLWAY CHANNEL MATERIAL SHALL BE PLACED SUCH THAT, IN CROSS-SECTION, ITS LOWEST ELEVATION OCCURS IN THE CENTER OF THE CHANNEL. THE MATERIAL SHALL BE COMPACTED USING TRACK EQUIPMENT OR AN EXCAVATOR BUCKET SUCH THAT FUTURE SETTLEMENT OF THE MATERIAL IS KEPT TO A MINIMUM. 5.THE SURFACE OF THIS CHANNEL SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE PLANSHEETS AND CONSTRUCTION DOCUMENTS. THE DEGREE OF FINISH FOR INVERT ELEVATIONS SHALL BE WITHIN 0.2 FT OF THE GRADES AND ELEVATIONS INDICATED. 6.SEE TYPICAL CROSS-SECTION FOR DIMENSIONS. D = 1.5 FT NOT TO SCALESPILLWAY CHANNEL4.1PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018 A' A FLOW 1.ALL BOULDERS USED FOR THE GRADE CONTROL STRUCTURE SHALL BE STRUCTURAL STONE, LARGE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDER DIMENSIONS: L: 3.5 - 5.5 FT, W: 2.0 - 3.0 FT, D: 1.5 - 2.5 FT. 2.ALL BEDDING COURSE MATERIAL SHALL CONSIST OF WELL-GRADED RIPRAP AND EARTH (40% NC DOT CLASS A, 40% NC DOT CLASS B, 20% ASTM #57 OR EQUIVALENT BLEND). 3.ALL COARSE BACKFILL MATERIAL SHALL CONSIST OF WELL-GRADED GRAVEL AND EARTH (20% NC DOT CLASS B, 60% NC DOT CLASS A AND 20% ASTM #57). 4.THE GRADE CONTROL STRUCTURE SHALL BE CONSTRUCTED IN AN ELLIPTICAL PATTERN PERPENDICUAR TO FLOW OF THE SPILLWAY CHANNEL. DIMENSIONS AND SLOPES OF STRUCTURE DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY ENGINEER TO FIT FIELD CONDITIONS. 5.GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 6.THERE SHALL BE NO DROP GREATER THAN 2.0 FT OVER A SINGLE STEP. 7.NON-WOVEN FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE AND ALONG THE BASE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOUNDATION BOULDERS TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. COARSE BACKFILL MATERIAL SHALL BE PLACED UPSTREAM OF THE STRUCTURE. ALL EXCESS FILTER FABRIC SHALL BE CUT AWAY FROM THE SURFACE OF THE STRUCTURE. 8.THE SCOUR POOL BELOW THE STRUCTURE SHALL BE ARMOR WITH RIPRAP USING THE ROCK BLEND USED FOR THE SPILLWAY CHANNEL LINING. 9.FOR CONSTRUCTION, THE CONTRACTOR SHALL PREPARE THE AREA OF INSTALLATION BY EXCAVATING OR FILLING THE WORK AREA TO THE APPROPRIATE ELEVATION. ALL EARTH BENEATH THE STRUCTURE SHALL BE SUFFICIENTLY COMPACTED WITH THE EXCAVATOR BUCKET OR A VIBRATORY PLATE COMPACTOR TO PREVENT FUTURE SETTLEMENT OF THE STRUCTURE. PLACE NON-WOVEN FILTER FABRIC OVER THE EXCAVATED AREA. INSTALL THE GRAVEL BEDDING COURSE AND FOUNDATION BOULDERS SUCH THAT THE BOULDERS ARE BURIED A MINIMUM OF THE BOULDER DIAMETER. USE COARSE BACKFILL MATERIAL TO FILL THE AREA BEHIND THE STRUCTURE AS ADDITIONAL BOULDERS ARE INSTALLED. BOULDER SETBACK SHALL BE A MINIMUM OF 1.0 FT AND NO DROP SHALL BE GREATER THAN 2.0 FT. INSTALL BOULDERS IN ROWS UNTIL THE PROFILE INVERT ELEVATION IS REACHED. SCOUR POOL GRADE CONTROL STRUCTURE DETAILED PLAN NOT TO SCALE GRADE CONTROL STRUCTURE SECTION A - A' GRADE CONTROL STRUCTURE CROSS-SECTION NOT TO SCALE GRADE CONTROL STRUCTURE NOTES KEY BOULDERS INTO STREAMBANK MIN. 6 FT OR TWO FULL BOULDER LENGTHS FLOW ARMORED SCOUR POOL BELOW STRUCTURE MIN. ROCK DEPTH = 1.5 FT NON-WOVEN FILTER FABRIC SPILLWAY CHANNEL BED FOUNDATION BEDDING COURSE SLOPE = 1 % INVERT ELEVATION PER PROFILE NOT TO SCALE FOUNDATION BOULDERS BOULDER SETBACK MIN. 1.0 FT BOULDER DROP MAX. 2.0 FT COMPACTED FILL OR UNDISTURBED EARTH COARSE BACKFILL ARMORED SCOUR POOL INVERT ELEVATION PER PROFILE SCOUR POOL ELEVATION PER PROFILE FOUNDATION BOULDERS INTO STREAMBED A MINIMUM OF THE BOULDER DIAMETER BEDDING COURSE COMPACTED FILL MATERIAL OR EXISTING EARTH COARSE BACKFILL MATERIAL FIT BOULDERS TIGHTLY TOGETHER HIGH DENSITY PLANTINGS NON-WOVEN FILTER FABRIC SPILLWAY CHANNEL TOP OF BANK EXTEND BOULDERS BEYOND TOB MIN. 6 FT OR 2 FULL BOULDER LENGTHS PLACE ALL BOULDERS IN ELLIPTICAL PATTERN W = 23 FT 1" = 30'GRADE CONTROL4.2PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018 3' BANKFULL 2.5' (TYP) 6" MIN. HORIZONTAL OVERLAP 2.5'(TYP)2.5'(TYP)2'(TYP)2' (TYP) 6" MIN. VERTICAL OVERLAP A A' 700 GRAM COIR FIBER MATTING FROM TOE OF CHANNEL TO 3 FT BEYOND BANKFULL BANKFULL CHANNEL TOE OF SLOPE 700 GRAM COIR MATTING 2' LONG 2" x 2" WOOD STAKES w/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING 6" MIN. HORIZONTAL OVERLAP EROSION CONTROL MATTING DETAILED STAKING PLAN NOT TO SCALE EROSION CONTROL MATTING DETAILED PLAN NOT TO SCALE 1.EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2.BEFORE INSTALLING COIR FIBER BLANKET, RAKE SOIL LEVEL AND ADD SEED, FERTILIZER, LIME AND MULCH. 3.700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 3 FT BEYOND THE BANKFULL ELEVATION. 4.SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE-TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 700 GRAM COIR FIBER MATTING SUPPLEMENT WOODEN STAKES WITH 12" ECO-STAKES 2' LONG 2" x 2" WOOD STAKES w/ 3" GALVANIZED ROOFING NAIL AT THE TOP TO SECURE MATTING EROSION CONTROL MATTING DETAILED CROSS-SECTION A - A' NOT TO SCALE EROSION CONTROL MATTING NOTES 1" = 30'MATTING4.3PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018 SSSSSSSSSSSSSSSSSSSSSSSSLOD LOD LOD LOD L O D LODL O D LODLODLOD LOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLOD LOD LOD LO D LOD LOD LOD LOD 303304301300291 292 301300309 3 0 2 308 307 306 305 304 303 296297298 293 294 295 2932942950+000+25 0+50 0+75 1+00 1+25 1+50 1+72 SW SCALE: 1" = 20'1" = 20'VEGETATION5.1Feet 0 10 20 PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018GENERAL RE-VEGETATION PLAN NOTES A.TREES IN 1 GALLON CONTAINERS SHALL BE PLACED IN TWO OFFSET LINES INSIDE THE ZONE 1 RIPARIAN BUFFER FOR RE-ESTABLISHMENT. B.SOIL PREPARATION ELEMENTS, TEMPORARY AND PERMANENT SEED AND GROUND COVER SHALL BE SPREAD OVER ALL AREAS WITHIN THE LOD THAT ARE DISTURBED DURING CONSTRUCTION. C.CONTAINERIZED PLANTS AND BARE ROOT STOCK SHALL BE LOCATED WHERE SHOWN ON PLAN. D.ADJUSTMENTS TO THE VEGETATION PLAN SHALL BE MADE ONLY IF APPROVED BY THE PROJECT OWNER OR PROJECT ENGINEER. BARE ROOTS, LIVE STAKES AND CUTTINGS E.CUTTINGS SHOULD BE INSTALLED THE SAME DAY THEY ARE CUT. THE STAKE SHOULD BE ORIENTED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND. F.ABOUT 3 4 OF THE LENGTH OF THE STAKE SHOULD BE BELOW GROUND AND ANGLED DOWNSTREAM. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION. CONTAINER STOCK G.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. H.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. I.THE DIAMETER OF THE PLANTING HOLES (PITS) FOR EACH PLANT SHOULD BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. J.SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. K.PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2 3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. VEGETATION PLANTING SPECIFICATIONS LIVE STAKES, BARE ROOTS, TRANSPLANTS AND / OR CONTAINERIZED PLANTINGS - 5,500 FT2 SCIENTIFIC NAME COMMON NAME SIZE (CAL)SPACING QTY Liriodendron tulipifera TULIP POPLAR 0.25" - 1.0"5 FT O.C.100 Salix sericea SILKY WILLOW 0.50" - 1.0"5 FT O.C.100 Platanus occidentalis SYCAMORE 0.25" - 1.0"5 FT O.C.50 Betula nigra RIVER BIRCH 0.25" - 1.0"5 FT O.C.50 Comus amomum SILKY DOGWOOD 0.25" - 1.0"5 FT O.C.100 PERMANENT SEEDING - 5,500 FT2 SCIENTIFIC NAME COMMON NAME TYPE APP. RATE QTY ------RIPARIAN SEED MIX SEED 4 LBS / 1000 SF 40 LBS Elymus virginicus VIRGINIA WILD RYE SEED 20 %.------ Agrostis perennans AUTUMN BENT GRASS SEED 15 %------ Pancicum virgatum SWITCHGRASS SEED 15 %------ Redbeckia hirta BLACK-EYED SUSAN SEED 10 %------ Coreopsis lanceolata LANCELEAF COREOPSIS SEED 10 %------ Andropogon gerardii BIG BLUESTEM SEED 10 %------ Juncus effusus SOFT RUSH SEED 10 %------ Schizachyrium scoparium LITTLE BLUESTEM SEED 5 %------ Sorghastrum nutans INDIAN GRASS SEED 5 %------ TEMPORARY SEEDING, MULCHING AND SOIL PREP - 5,500 FT2 SCIENTIFIC NAME COMMON NAME TYPE APP. RATE QUANTITY Secale Cereale MILLET SEED 5 LBS / 1000 SF 50 LBS ------GROUND AG. LIMESTONE PELLET 45 LBS / 1000 SF 450 LBS ------10-10-10 FERTILIZER PELLET 17 LBS / 1000 SF 170 LBS ------WHEAT STRAW MULCH STRAW 90 LBS / 1000 SF 900 LBS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSLOD LOD LOD LOD L O D LODL O D LODLODLOD LOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLOD LOD LOD LO D LOD LOD LOD LOD 303304301300291 292 301300309 3 0 2 308 307 306 305 304 303 296297298 293 294 295 2932942950+000+25 0+50 0+75 1+00 1+25 1+50 1+72 SW SW SW SW SCALE: 1" = 20'1" = 20'PREMITTING6.1Feet 0 10 20 PLAN TYPE:SHEET NUMBERREVISION:PROJECT:JE PID:ORIGINALPRELIMINARY PLANRALEIGH, NC 276032805 PAR DRIVEGREENS SPILLWAY STABILIZATIONGREENS SPILLWAY STABILIZATION1108DESIGN:GJD, JLPDRAWN:JLPSCALE:DATE:JULY 30, 2018APPROX. 30 FT TEMPORARY STREAM IMPACT AT CONFLUENCE OF SPILLWAY WITH UT WALNUT CREEK. POND ZONE 1 BUFFER TEMPORARY IMPACT = 1,215 FT2 UT WALNUT CREEK ZONE 1 BUFFER TEMPORARY IMPACT = 2,750 FT2 COMBINED ZONE 2 BUFFER TEMPORARY IMPACT = 3,715 FT2 EXISTING UT WALNUT CREEK CHANNEL