Loading...
HomeMy WebLinkAbout20181116 Ver 1_100% Final 2018-08-03_20180809VICINITY MAP SCALE: 1" = 1000' HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION 2801 GLENWOOD GARDENS LANE RALEIGH, NORTH CAROLINA 27608 GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION H&S JOB NO. 31301-000 July 2018 DRAWING INDEX SHEET DRAWING TITLE G-01 COVER SHEET G-02 GENERAL ABBREVIATIONS AND GENERAL NOTES C-01 EXISTING CONDITIONS C-02 GRADING AND PROFILE PLAN C-03 GRADING AND PROFILE PLAN C-04 REVETMENT DETAILS C-05 REVETMENT DETAILS C-06 EROSION AND SEDIMENT CONTROL NOTES C-07 EROSION AND SEDIMENT CONTROL PLAN C-08 EROSION AND SEDIMENT CONTROL DETAILS 100% DRAFT - NOT FOR CONSTRUCTIONENVIRONMENTAL IMPACTS TOTAL LIMITS OF DISTURBANCE 0.28 ACRES AREA OF WATERS OF THE US 0.26 ACRES LENGTH OF STREAM 178 LF WETLANDS IMPACT NO WETLANDS PRESENT PLOT DATE: 7/25/2018 2:11 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\GENERAL\G-02 Saved by BTHARRINGTON Save date: 7/25/2018 2:07 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL G-02 GENERAL GENERAL ABBREVIATIONS AND GENERAL NOTEST. SCHUELER LEGEND WATER SURFACE CONCRETE CONCRETE STORMAT GRADE OR EARTH SAND ASPHALT PAVING GRAVEL MATERIALS EXISTING SYMBOLS EXIST. FIRE HYDRANT EXIST. POWER POLE EXISTING LINETYPES EXIST. GROUND PROFILE EXIST. EDGE OF PAVEMENT EXIST. CREEK / STREAM SD SS EXIST. SANITARY SEWER EXIST. STORM DRAIN STREAM CENTERLINE DETAIL KEYING SEE 1509203 1509203 OR: REFERENCED ITEM REFERENCED ITEM STANDARD DETAILS ARE REFERENCED BY A UNIQUE SEVEN DIGIT NUMBER AND ARE SHOWN ON THE CONTRACT DRAWINGS BY ONE OF THREE METHODS: DETAIL X/DX OR: REFERENCED ITEM SEDIMENT CONTROL SYMBOLS ROCK OUTLET PROTECTION SAND BAG DIVERSION TEMPORARY PUMP AROUND PUMPCONTOUR MAJOR CONTOUR MINOR GROUND PROFILE FILTER BAG STABILIZED CONSTRUCTION ENTRANCE (SCE) EX TREE COIR MAT TPA EXIST. 100-YR FLOOD100-YR PROPOSED SYMBOLS RIPRAP STAGING AREA PAVEMENT REPAIR PROPOSED LINETYPES EX BENCHMARK GENERAL NOTES APPROX APPROXIMATE CF CUBIC FEETCL CENTER LINE CONC CONCRETE DIA DIAMETER DIM DIMENSION DWG DRAWING EL OR ELEV ELEVATION FEETFT HORIZONTALHORZ INVERTINV LINEAR FEETLF MINIMUMMIN MISC MISCELLANEOUS MH MANHOLE NTS NOT TO SCALE REINFORCED CONCRETE PIPERCP SQUARE FEET STORM/SITE DRAIN SECT SD SF SECTION STANDARDSTD TYP TYPICAL VELOCITYVELVOL VOLUME YR YEAR EX OR EXIST EXISTING ABBREVIATIONS 1. CONTRACT DRAWINGS ARE REFERENCED TO THE N.C. GRID NAD83/2011 HORIZONTAL SURVEY DATUM AND NAVD88 VERTICAL SURVEY DATUM. 2. TOPOGRAPHIC INFORMATION FROM FIELD SURVEY PERFORMED BY COOPER AND ASSOCIATES DATES MAY 19, 2017. 3. NO WETLANDS ARE PRESENT WITHIN PROJECT SITE. 4. THE PROJECT SITE IS LOCATED WITHIN THE 100-YR FEMA FLOODPLAIN, AS SHOWN ON FIRM MAP NUMBER 327009500J, PANEL 0795, EFFECTIVE MAY 2, 2006. 5. THESE PLANS WERE PREPARED WITH FIELD INFORMATION AND/OR GIS DATA AVAILABLE AT THE TIME OF PROJECT DESIGN. IT IS POSSIBLE THAT FIELD CONDITIONS AT THE TIME OF CONSTRUCTION MAY VARY FROM THESE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY FIELD CONDITIONS SUCH AS ELEVATIONS AND DEPTHS PRIOR TO PROCEEDING WITH WORK. 6. EXISTING UTILITIES ARE SHOWN FOR GENERAL INFORMATION ONLY AND MAY NOT BE ALL INCLUSIVE. CONTRACTOR IS TO DIG TEST PITS TO FIELD LOCATE ALL EXISTING UTILITIES THAT THE NEW WATER MAIN AND APPURTENANCES CROSS OR COME IN CLOSE PROXIMITY TO WELL IN ADVANCE OF PIPE LAYING OPERATIONS TO DETERMINE SIZE, ELEVATION AND LOCATION OF ALL UTILITIES. CONTRACTOR IS TO NOTIFY ENGINEER WITHIN 48 HOURS OF ANY CONFLICTS BETWEEN EXISTING UTILITIES AND PROPOSED ROUTE OF WATER MAIN TO ALLOW ADEQUATE TIME FOR ENGINEER AND OWNER TO CONSIDER REALIGNMENT OR CHANGES THAT MAY BE REQUIRED. ALL EXISTING UTILITIES ARE TO BE LOCATED PRIOR TO CONSTRUCTION. 7. ANY CUT AND FILL QUANTITIES AS LISTED HEREON SHALL BE CONSIDERED APPROXIMATE ONLY AND ARE SUBJECT TO CHANGE DEPENDING ON ACTUAL SITE CONDITIONS AND CONSTRUCTION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES THROUGH A FIELD VISIT AND HIS/HER OWN QUANTITY TAKE-OFFS. 8. CONTRACTOR IS TO REPLACE ANY DAMAGED STORM DRAINAGE WITH SAME SIZE RCP. 9. CONTRACTOR TO PROVIDE ADEQUATE SUPPORT FOR POWER POLES. COMPACT TRENCH FIVE (5) FEET EACH SIDE OF POWER POLES TO 95%-98% STANDARD PROCTOR 10. RESTORE ALL DRIVES, FENCING, PAVEMENT, AND GRASSED AREAS TO THEIR ORIGINAL CONDITION AND MAINTAIN UNTIL FINAL ACCEPTANCE OF THE PROJECT. 11. ALL ITEMS THAT ARE REMOVED AND REPLACED OR DISTURBED DURING CONSTRUCTION ARE TO BE REPLACED WITH EQUAL OR BETTER QUALITY THAN THE ORIGINAL. 12. WHEN EXISTING UTILITY LINES ARE EXPOSED DURING CONSTRUCTION THE CONTRACTOR SHALL PROVIDE SUPPORT AS NECESSARY TO PREVENT DAMAGE TO THE EXISTING UTILITY. ANY UTILITY DAMAGED SHALL BE IMMEDIATELY REPLACED AT NO COST TO OWNER. 13. ROADS IN WORK AREA TO REMAIN CLEAR AT ALL TIMES. CONTRACTOR SHALL REPAIR ANY PAVEMENT DAMAGED, AND ROADS IN WORK AREA TO BE CLEAN AT END OF EACH DAY AT THEIR OWN EXPENSE. 14. NOT ALL TREES MAY HAVE BEEN SHOWN. MORE SIGNIFICANT TREE HAVE BEEN SHOWN FOR CONTRACTOR CONVENIENCE. 15. CONTRACTOR SHALL MAINTAIN ACCESS TO AFFECTED PROPERTIES AT ALL TIMES DURING CONSTRUCTION. 16. ANY EXISTING AC WATERLINE THAT IS DISTURBED SHALL BE HANDLED AND DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAWS. 17. WHERE GUY WIRES ARE TO BE DISTURBED BY THE MAIN INSTALLATION THE CONTRACTOR SHALL CONSULT WITH THE AFFECTED UTILITY TO PROVIDE SUPPORT, RELOCATIONS, OR REPAIRS AS NEEDED FOR WATER MAIN INSTALLATION. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED. 18. APPROVAL OF THIS PLAN SHALL NOT CONSTITUTE AUTHORIZATION TO BEGIN SYSTEM CONSTRUCTION. ALL APPLICABLE PERMITS MUST BE OBTAINED PRIOR TO CONSTRUCTION. 19. CONTRACTOR SHALL PROVIDE ALL MATERIALS AND MATERIAL CERTIFICATIONS FOR THIS SITE UTILITY SYSTEM IN ACCORDANCE WITH THE APPROVED DRAWINGS AND SPECIFICATIONS. 20. CONTRACTOR IS RESPONSIBLE FOR CONTROL OF WATER THROUGHOUT THE CONSTRUCTION SITE, INCLUDING RUNOFF THROUGH DISTURBED AREAS. 21. THE TEMPORARY STREAM BYPASS PUMPS AND PIPING SHALL BE CONTAINED WITHIN THE WORK AREA DEFINED BY SILT FENCE AND TREE PROTECTION FENCING UNLESS THE CONTRACT DRAWINGS EXPLICITLY IDENTIFY AN ALIGNMENT FOR THE TEMPORARY PUMPS AND PIPING OUTSIDE OF THESE AREAS. 22. IN-STREAM WORK AREAS MUST BE STABILIZED DAILY ONCE THE PUMP-AROUND IS REMOVED OR DE-ACTIVATED AT THE END OF THE WORKDAY. DISTURBED AREAS ABOVE THE WATERLINE SHALL RECEIVE STRAW/MULCH/COIR MAT ONCE STREAM FLOW IS RE-ESTABLISHED AT THE END OF THE WORKDAY. THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME TO INSPECT THE NEW FLOW PATTERN AND MAKE ADJUSTMENTS AS NECESSARY TO ENSURE NON-EROSIVE CONDITIONS BEFORE VACATING THE SITE. 23. CONTRACTOR IS RESPONSIBLE FOR ENSURING SMOOTH TRANSITIONS AT UPSTREAM AND DOWNSTREAM ENDS OF WORK AREAS AND BETWEEN THE STREAMBED AND ITS BANKS. 24. VOIDS SHOULD NOT BE LEFT IN ANY COMPLETED STREAM STRUCTURES. STRUCTURES SHOULD BE FILLED IN WITH CHINKING STONE, STREAM BED MATERIAL AND/OR ORGANIC MATERIAL (TOP SOIL). 25. ALL DISTURBED AREAS WITHIN THE LIMIT OF DISTURBANCE (EXCEPT CHANNEL) SHALL BE RE-SEEDED AND/OR RE-PLANTED. ALL PLANTING AREAS ARE TO BE COVERED WITH COIR MAT. INSTALL A WELL-MIXED COMBINATION OF THREE INCHES OF TOP SOIL AND THREE INCHES OF COMPOST ONTO ALL GRADED AREAS REQUIRING COIR MAT. INSTALL STRAW ON TOP OF THIS MIXTURE BEFORE INSTALLING AND STAKING COIR MAT. 26. SPECIFIED AND/OR PROPRIETARY PRODUCTS SHOWN HEREON MAY BE SUBJECT TO SUBSTITUTION WITH OTHER PRODUCTS OF EQUAL OR SUPERIOR QUALITY AS RECOMMENDED BY THE CONTRACTOR SUBJECT TO THE WRITTEN PREVIEW AND APPROVAL OF THE DESIGN ENGINEER. WHEN THE CONTRACTOR USES PROPRIETARY PRODUCTS, IT THE CONTRACTOR'S RESPONSIBILITY TO VERIFY WITH THE SUPPLIER/MANUFACTURER THAT IT WILL FUNCTION PER THE DESIGN OR THE GIVEN FIELD CONDITIONS. THE DESIGN ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY DEVIATIONS FROM EXISTING FIELD CONDITIONS EXIST WHICH MAY AFFECT PRODUCT FUNCTION. 27. DRY WEATHER STREAM BASE FLOW IS A FUNCTION OF WEATHER PATTERNS, TIME OF YEAR, GROUNDWATER, SNOW MELT, UPSTREAM MAN-INDUCED RELEASES, AND OTHER FACTORS AND THEREFORE WAS NOT ESTIMATED FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CARRY OUT SITE RECONNAISSANCE TO DETERMINE PUMP-AROUND NEEDS SUCH AS THE NUMBER AND SIZE OF PUMPS HE/SHE WILL NEED TO SUCCESSFULLY COMPLETE THE PROJECT. 28. CONTRACTOR IS RESPONSIBLE FOR CREATING AND MAINTAINING A SAFE AND APPROPRIATE TRAFFIC SAFETY PLAN AND IS RESPONSIBLE FOR MAINTAINING A SAFE WORK SITE INCLUDING ADHERENCE TO LOCAL STATE AND FEDERAL REQUIREMENTS INCLUDING OSHA. SHT SHEET SANITARY SEWER STA SS STATION RIPRAP ABC STONE DEMO DEMOLITION LIMITS OF DISTURBANCE TREE PROTECTION FENCE SILT FENCE SECTION 100-YR FLOOD FEMA EXIST. CONTOUR MAJOR EXIST. CONTOUR MINOR EXIST. EASEMENT BOUNDARY EXIST. ITEMS EX LIGHTPOLE EX ELECTRICAL HANDHOLD ELECTRICAL HANDHOLDHH EX COMMUNICATIONS MANHOLE EX ROAD SIGN EX TRANSFORMER CONSTRUCTION SEQUENCE 1. CONDUCT A PRE-CONSTRUCTION MEETING WITH CONTRACTOR, OWNER, AND DESIGN ENGINEER. CONTRACTOR TO ARRANGE MEETING; ALL PARTIES REQUIRE SEVEN (7) DAYS NOTICE. PRIOR TO MEETING, CONTRACTOR IS TO HAVE LIMITS OF DISTURBANCE AND TREE PROTECTION FENCING STAKED OUT FOR EXAMINATION. CONTRACTOR RESPONSIBLE FOR HAVING ALL UTILITIES MARKED IN THE FIELD. 2. CLEAR FOR PERIMETER SEDIMENT CONTROL DEVICES, TREE PROTECTION FENCING, AND/OR SILT FENCE. INSTALL DEVICES AND FENCING. 3. ALL WORK ASSOCIATED WITH CROSSVANE IS TO BE COMPLETED "IN THE DRY." INSTALL STREAM PUMP AROUND AND SAND BAG DIVERSION AS DENOTED ON THE CONSTRUCTION DOCUMENTS. INSTALL PUMP-AROUND SYSTEM ONLY FOR AS MUCH WORK AS CAN BE COMPLETED IN ONE DAY. PUMP-AROUNDS ARE ONLY TO BE OPERATED DURING NORMAL WEEKLY CONSTRUCTION BUSINESS HOURS AND SHALL NOT BE OPERATED OVERNIGHT OR DURING STORM EVENTS. 4. REMOVE AND RE-DEPLOY PUMP AROUND SYSTEM AS NEEDED. 5. EXCAVATE AREA ADJACENT TO RIGHT ABUTMENT FOOTER TO EXPOSE FOOTER. 6. INSTALL CONCRETE BAGS AND FILL WITH GROUT ALONG RIGHT ABUTMENT AS SHOWN ON CONSTRUCTION DOCUMENTS. ENGINEER TO APPROVE INSTALLATION. 7. CONSTRUCT CROSSVANE AS SHOWN ON CONSTRUCTION DOCUMENTS. ENGINEER TO APPROVE INSTALLATION. 8. PLACE TOP SOIL, SEED, AND COIR MATTING IN ALL DISTURBED AREAS AND AS NOTED ON DRAWINGS. ALL DISTURBED AREAS SHALL BE RETURNED TO ORIGINAL OR BETTER CONDITION. 9. EROSION AND SEDIMENT CONTROL DEVICES SHALL REMAIN IN PLACE FOR THE DURATION OF PROJECT. UPON PROJECT COMPLETION AND APPROVAL FROM ENGINEER, REMOVE REMAINING EROSION AND SEDIMENT CONTROL DEVICES. 100Y R 100 Y R 100YR 100YR 100 Y R 100YR 100YR 100YR 10 0YR 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 00 Y R 10 0Y R 1 00 Y R POINT #1015 PLOT DATE: 8/3/2018 12:27 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-01 Saved by BTHARRINGTON Save date: 8/3/2018 12:22 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 NOTES: 1. EXISTING INFORMATION AND TOPOGRAPHY FROM FIELD SURVEY PERFORMED BY COOPER AND ASSOCIATES DATED MAY 19, 2017. 2. CONTRACT DRAWINGS ARE REFER3ENCED TO N.C. GRID NAD83/2011 HORIZONTAL SURVEY DATUM AND NAVD88 VERTICAL SURVEY DATUM. 3. THE N.C. GRID COORDINATES SHOWN WERE DETERMINED USING REAL TIME KINEMATIC GPS OBSERVATIONS TAKEN ON THE DATE OF THIS SURVEY. 4. NO DETERMINATION HAS BEEN MADE BY THE SURVEYOR AS TO THE EXISTENCE OF WETLANDS, UNDERGROUND UTILITIES, UNDERGROUND STORAGE FACILITIES, OR CEMETERIES. 5. WATERS OF THE UNITED STATES WITHIN THE PROJECT AREA WERE DELINEATED BY HAZEN AND SAWYER ON NOVEMBER 20, 2017. 6. THIS PROPERTY IS LOCATED WITHIN THE FEMA 100-YR FLOODPLAIN AS SHOWN ON FIRM MAP NUMBER 3720079500J, PANEL 0795, EFFECTIVE MAY 2, 2006. T. SCHUELER C. McNICOL C-01 CIVIL EXISTING CONDITIONST. SCHUELER 0 10'5 SCALE: 1" = 10' 10 1 5 "R C P 15"RCP 1 8 "R C P 18"RCP18"RCPFLOW SOUTHWEST PRONG BEAVERDAM CREEK FLOW EL.=245.58' CONC. BRIDGE POINT #1013 CONTROL POINT N.C. GRID (NAD 83/2011) Y = 752,135.98 X = 2,100,135.54 Z = 246.68' SEE NOTE #8 PROPERTY LINE, TYP.GLENWOOD GARDENS LANEM A R K E T B R I D G E L A N E G L E N WO O D G A R D E N S L A N E 100-YEAR FLOODPLAIN POINT #1014 4 STORY APARTMENT BUILDING NOW OR FORMERLYSTERLING GLENWOOD VILLAGE LLC DB 8701 PG 439 PB 2000 PG 1664 PIN: 1705022013 SYMBOL AND LINETYPE LEGEND EXIST. ITEMS EXIST. SANITARY SEWER EXIST. STORM DRAIN EXIST. 100-YR FLOODPLAIN EXIST. CREEK/STREAM CL EXIST. CONTOUR MAJOR EXIST. CONTOUR MINOR EXIST. EASEMENT BOUNDARY EXIST. FIRE HYDRANT EXIST. POWERPOLE EXIST. TREE EXIST. BENCHMARK EXIST. LIGHT POLE EXIST. ELECTRICAL HANDHOLD EXIST. COMMUNICATIONS MANHOLE EXIST. ROAD SIGN EXIST. TRANSFORMERS 9" 12" 14" 24" 10" 18" 18" STUMP 5" EXIST. EDGE OF WATER/ WATERS OF THE US 100 Y R 100Y R 100YR 100YR 100 Y R 100YR 100YR 100YR 10 0YR 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 00 Y R 10 0Y R 1 +0 5 0+00 0 +5 0 1 +0 0 FB TPATPATPATPATPATPATPATPATPA TPA TPA TPA T PA TPA T P A T P A T P A T P A T P A T P A T P A T P A TPAP TPFTPFTPF TPFTPFTPFTPF TPFTPFTPFTPF TPFT P FTPFTPF TPFP S F S F S F SFSFSFLODLODLODLODLODLODLODLODLODLODLODLODLODLODTPFTPFTPFTPFLODLODLODLODLODLODLODLODLODLODLODLODLODLODL O D L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODL OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD230 240 250 230 240 250 -0+50 0+00 0+50Proposed Stream CenterlinePLOT DATE: 7/30/2018 4:46 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-02 Saved by BTHARRINGTON Save date: 7/30/2018 4:45 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-02 CIVIL GRADING AND PROFILE PLANT. SCHUELER 0 10'5 SCALE: 1" = 10' 10 FLOW BEAVERDAM CREEK FLOW EL.=245.58' CONC. BRIDGE PROPERTY LINE, TYP.GLENWOOD GARDENS LANEM A R K E T B R I D G E L A N E G L E N WO O D G A R D E N S L A N E 4-STORY DWELLING SCALE: 1" = 10' PLAN 100-YR FLOODPLAIN, TYP. A A B B DIVERTER ROCK APEX ROCK ARM STONE COIR MAT, TYP. HORIZONTAL VERTICAL SCALE: 1"=2' SCALE: 1" = 20' SECTION A-A FILTER CLOTH, TYP. APEX ROCKS, TYP. FOOTER STONES, TYP. EXISTING GRADE C C 2 - 16" STORMAT 12.5' X 6', SEE NOTE 1 VIEW LOOKING DOWNSTREAM ELEV. 239.5 ELEV. 233.5 1.5:12:1COIR MAT PROPOSED GRADE 225 230 240 250 225 230 240 250 -0+25 0+00 1+00 1+75 235 240 250 235 240 250 -0+50 0+00 0+50Proposed Stream Centerline225 230 240 250 225 230 240 250 -0+60 0+00 0+60Proposed Stream CenterlinePLOT DATE: 7/30/2018 11:56 AM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-03 Saved by BTHARRINGTON Save date: 7/30/2018 11:40 AM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 NOTES: 1. ABUTMENT FOOTER ELEVATIONS AND DIMENSIONS ESTIMATED FROM SUNGATE DESIGN GROUP SURVEY DATED JULY 26, 2016, AND SHOULD BE CONSIDERED APPROXIMATE. IF ACTUAL DIMENSIONS VARY SIGNIFICANTLY FROM THOSE SHOWN (+/- 0.5 FT CONTACT THE ENGINEER IMMEDIATELY). ALL OTHER ELEVATIONS PROVIDED BY COOPER AND ASSOCIATES SURVEY DATED MAY 19, 2017. 2. 16" CONCRETE STORMAT SHALL BE PLACED DIRECTLY ON TOP OF BRIDGE ABUTMENT FOOTER. NCDOT CLASS B RIPRAP SHALL BE PLACED UNDERNEATH STORMAT TO A DEPTH OF 24". T. SCHUELER C. McNICOL C-03 CIVIL GRADING AND PROFILE PLANT. SCHUELER HORIZONTAL VERTICAL SCALE: 1"=2' SCALE: 1" = 20' STREAM CENTERLINE PROFILE HORIZONTAL VERTICAL SCALE: 1"=2' SCALE: CUSTOM SECTION B-B COIR MAT, TYP. FILTER FABRIC, TYP. ARM STONES, TYP. FOOTER STONE, TYP. EXISTING GRADE PROPOSED GRADE DIVERTER ROCK FILTER FABRIC APEX ROCK FOOTER STONE APPROVED FILL EXISTING GRADE2:1PROPOSED GRADE CONCRETE BRIDGE TOP ELEV = 245.58' BRIDGE FLANGE, TYP OF 4 BOTTOM ELEV = 243.00' ELEV. 236.0 FLOW CONCRETE BRIDGE TOP ELEV = 245.58' 16" CONCRETE STORMAT 6'W X 12'L, SEE NOTE 2 ABUTMENT FOOTER, SEE NOTE 1 BRIDGE FLANGE BOT. ELEV = 243.00' PROPOSED GRADE EXISTING GRADE NCDOT CLASS B RIP RAP SEE NOTE 2 HORIZONTAL VERTICAL SCALE: 1"=2' SCALE: 1" = 20' SECTION C-C2:1VIEW LOOKING DOWNSTREAM VIEW LOOKING DOWNSTREAM2:116" CONCRETE STORMAT3.5:1ELEV. 241.0 ELEV. 237.0 ELEV. 236.8 ELEV. 240.8 ELEV. 236.0 ELEV. 234.8 ELEV. 233.5 ELEV. 231.5 TEMPORARY GRADE LINE FOR INSTALLATION OF STORMAT AND RIP RAP2.4:1ELEV. 236.0 STA: 0+90ELEV: 234.8STA: 0+65ELEV: 234.8STA: 0+12ELEV: 239.5STA: 0+90ELEV: 238.6STA: 0+26ELEV: 236.0STA: 0+65ELEV: 236.0STA: 0+12ELEV: 239.5STA: 0+26ELEV: 231.0 PLOT DATE: 7/30/2018 11:56 AM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-04 Saved by BTHARRINGTON Save date: 7/27/2018 3:42 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-04 CIVIL REVETMENT DETAILST. SCHUELER NTS 1/3 TO 1/2 ROCK DIAMETER GAPS BB A FLOW X Y FLOW Y Z 1/3 W FLOW W FLOW S LO P E V A R I E S , S E E P R O F I L E PROFILE VIEW ZS L O P E V A R I E S Df* VANESLOPE ( %) APEX ROCK LS FILTER FABRIC (NON-WOVEN) RIFFLE GRADE CONTROL, SEE STREAM PROFILE FOR LIMITS 1. ALL DIMENSIONS/ELEVATIONS TO BE FIELD ADJUSTED TO ENSURE STABLE INSTALLATION, FISH PASSAGE, AND TIE-IN TO BANKS. 2. VANE STONES SHALL BE BOULDERS WITH RECTANGULAR BLOCK SHAPE AND MINIMUM DIMENSION OF 18 INCHES IN ANY DIRECTION UNLESS NOTED OTHERWISE (SEE ROCK SIZING CHART). 3. ROCKS/BOULDERS SHALL BE TIGHT FITTING WITH NO VOIDS/GAPS LARGER THAN 1 INCH. VOIDS ALONG APEX AND VANE ARMS SHALL BE CHINKED-IN WITH SMALLER NON-WEATHERING STONE TO ESTABLISH SURFACE FLOW AND INTERCONNECTION OF ROCKS. 4. ROCKS/BOULDERS ALONG APEX AND VANE ARMS SHALL BE FLUSH WITH THE TOP SURFACES OF ADJACENT STONES. 5. TOP ROCKS SHALL BE SUPPORTED BY A FOOTER ROCK AND SHINGLED UPSTREAM. 6. STONE PLACEMENT SHALL BE FIELD ADJUSTED TO ENSURE STONE WILL REMAIN IN PLACE OVER FULL RANGE OF FLOW CONDITIONS. 7. REPLACEMENT OF ROCKS/BOULDERS MAY BE REQUIRED BASED UPON INSPECTION OF COMPLETED INSTALLATION TO MEET DESIGN INTENT AND PERMIT REQUIREMENTS. 8. SPACING BETWEEN DIVERTER ROCKS SHALL BE 1/3 TO 1/2 THE LENGTH OF THE APEX STONE LENGTH UNLESS NOTED OTHERWISE (SEE DETAIL TABLE). DIVERTER STONES SHALL BE PLACED SO THAT THE TOP SURFACE IS 3 TO 6 INCHES ABOVE THE APEX ROCK ELEVATION. 9. ANGLE OF VANE ARM SHALL BE BETWEEN 20 (MIN.) AND 30 (MAX) DEGREES UNLESS NOTED OTHERWISE (SEE DETAIL TABLE). 10. SLOPE OF VANE ARM SHALL BE BETWEEN 2% (MIN.) AND 7% (MAX.) UNLESS NOTED OTHERWISE (SEE DETAIL TABLE). ARM SLOPE IS MEASURED FROM APEX POINT X TO BANK TIE-IN POINT Y. 11. PLACE FILTER FABRIC (NON-WOVEN) ON UPSTREAM SIDE OF APEX AND VANE ROCKS. FABRIC SHALL COVER THE UPSTREAM FACE OF THE ENTIRE STRUCTURE INCLUDING THE TIE-IN SILLS AND EXTEND BENEATH THE FOOTER ROCKS. 12. WHERE STRUCTURE IS LOCATED DOWNSTREAM OF UTILITY CROSSING, REPLACE RIFFLE GRADE CONTROL STONE WITH PIPE PROTECTION DETAIL. LOCATE STRUCTURE APEX 10 FEET (MIN.) DOWNSTREAM OF UTILITY AND SET ORIENTATION TO MATCH CHANNEL. 13. WHERE EXISTING BED MATERIAL IN SCOUR POOLS MATCHES SIZE AND MATERIAL OF STREAM BED MATERIAL (SBM) MIX, SCOUR POOL STONE LINING IS NOT REQUIRED UNLESS NOTED OTHERWISE. WHERE SCOUR POOL LIES IN CLAY OR OTHER SUBSTRATE FINER THAN THE SBM MIX, THE CONTRACTOR SHALL OVER EXCAVATE BY 6 INCHES (MIN.) UNLESS NOTED OTHERWISE (SEE DETAIL TABLE) AND PLACE SBM MIX TO PROPOSED GRADE OR AS DIRECTED BY THE ENGINEER. 14. STREAM BED MATERIAL SHALL COME FROM SALVAGED SOURCE FIRST AND THEN FURNISHED AS NECESSARY. OFFSITE STREAMBED MATERIAL SHALL BE USED TO CHOKE BOTTOM LAYERS OF ROCK WITH SALVAGED MATERIAL SAVED FOR TOP. 15. ROCKS (APEX, ARM, AND FOOTERS) ARE PLACED AT 6:1 CAMBER WITH HORIZONTAL. 16. SEE ROCK SIZING CHART FOR STONE SIZES. 3-6" Df* X + FOOTER ROCK/BOULDER FOOTER STONES (SEE ROCK SIZING TABLE) BASE FLOW DIVERTER ROCKS FILL IN VOIDS WITH SMALLER STONE AND TRANSITION WITH SCORE POOL STONE *NUMBER OF STONE FOOTERS ROCKS VARIES. SEE CV SCHEDULE AND ROCK SIZING CHART FOR STONE DIMENSIONS AND MIN FOOTER DEPTHS D f. BANKFULL BENCH ELEVATIONY + 3-6" DIVERTER ROCK SPACING (S) 1/3 W1/3 W BANKFULL+ FILTER FABRIC (NON-WOVEN) X W NOTE: CROSS VANE STONE SHOWN IN THIS VIEW FOR PERSPECTIVE. A VANE ANGLE α ARM STONES, TYP (SEE ROCK SIZING CHART) STREAM BED MATERIAL (SBM) APEX DESIGN POINT FILTER FABRIC (NON-WOVEN)BENCHAPEX DESIGN POINT AT TOP OF ROCK/BOULDER RETURN TEMPORARILYSTOCK-PILED STREAM BED MATERIAL (SBM) UPSTREAM OF VANE ONCE INSTALLED PLOT DATE: 7/25/2018 2:14 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-05 Saved by CMCNICOL Save date: 11/29/2017 10:23 AM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-05 CIVIL REVETMENT DETAILST. SCHUELER THIS DRAWING REQUIRES SUPPORTING TECHNICAL DOCUMENTATION PRIOR TO USE AND MUST BE ADAPTED TO THE SPECIFIC SITE. 1. COCONUT EROSION CONTROL BLANKET SHALL BE 'ROLANKA BIO-D 70' OR APPROVED EQUAL, ABLE TO WITHSTAND 12 FPS WATER VELOCITIES AND 4.5 PSF SHEAR STRESS. FABRIC EMBEDMENT 3.0 FT. 2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER AND SEED. 3. BEGIN AT THE BOTTOM OF THE SLOPE, WORKING FROM DOWNSTREAM UP, AND ANCHOR FIBER MATTING IN A 12" DEEP INITIAL ANCHOR TRENCH. BACKFILL TRENCH AND TAMP EARTH FIRMLY. 4. OVERLAP EDGES OF ADJACENT PARALLEL ROLLS 12" AND ANCHOR AT 12" CENTERS WITH THE UPPER ROLL OVERLAPPING THE TOP OF THE LOWER ROLL. 5. WHEN FIBER MAT MUST BE SPLICED, PLACE END OVER END (SHINGLE STYLE IN DIRECTION OF FLOW) WITH 12" OVERLAP AND ANCHOR USING TWO STAGGERED ROWS OF STAKES AT 6" CENTERS. ADDITIONAL FASTENING MAY BE REQUIRED WHERE MATTING IS CUT TO INSTALL PLANTINGS. 6. LAY FIBER MAT LOOSELY AND ANCHOR SUFFICIENTLY TO MAINTAIN DIRECT CONTACT WITH THE SOIL - DO NOT STRETCH. 7. FOR SLOPES 2:1 AND STEEPER USE A MINIMUM OF (3) 18-INCH WOOD STAKES PER SQUARE YARD AND FOR SLOPES FLATTER THAN 2:1 USE A MINIMUM OF (2) 18-INCH WOOD STAKES PER SQUARE YARD. PROVIDE ADDITIONAL STAKING ALONG CHANNEL BOTTOM WHERE COIR MAT FORMS TOE OF SLOPE. 8. WOOD STAKES SHALL BE ANGLED SUCH THAT EXPOSED PORTION (2"-4") FACES UPSTREAM. 9. ANCHOR, FILL, AND COMPACT END OF FIBER MATTING IN 12"x6" TERMINAL ANCHOR TRENCH (MIRROR IMAGE OF INITIAL TRENCH). 10. ANCHORING DIMENSIONS TO BE REDUCED IN AREAS OF NATURAL RESOURCES TO BE PROTECTED. 11. EROSION CONTROL MATTING MAY BE EXTENDED UP STREAM BANK AS DIRECTED. STAKE FABRIC TO BOTTOM OF TRANSITION TRENCH, 1 STAKE PER 3 L.F. WOODEN STAKE WOVEN COIR FABRIC FILL KEY TRENCH WITH TOPSOIL AND COMPACT. EDGE OF FABRIC 4-INCHES MIN. FROM WOODEN STAKE FABRIC WRAP WOVEN COIR FABRIC 1'MINFILL KEY TRENCH WITH TOPSOIL AND COMPACT EDGE OF FABRIC 4-INCHES MIN. FROM WOODEN STAKE 1'MIN18" MINSAW A 2 X 4 DIAGONALLY TO PRODUCE 2 DEAD STOUT STAKES. TOP OF BANK FLOW TOE SLOPE PROTECTION TO BE PROVIDED AS IDENTIFIED ON DETAIL. UPSTREAM FABRIC OVERLAPS DOWNSTREAM FABRIC 1' (SEE OVERLAP DETAIL) UPSTREAM FABRIC DOWNSTREAM FABRIC 3.0' DOWNSTREAM FABRIC LAYER LAPS UNDER STAKE THROUGH BOTH FABRIC LAYERS STAKE THROUGH BOTTOM FABRICLAYER UPSTREAM FABRIC LAYER LAPS OVER TOP UPSTREAM FABRIC OVERLAPS DOWNSTREAM FABRIC 1'1'MINSEE KEY TRENCHDETAIL ALL FABRIC FORMS WILL BELAPPED IN AN UPSTREAM TO DOWNSTREAMDIRECTION. MAXIMUM ANGLE 15 DEGREES STAKES ON 3' CENTERS, TYP A A B B 1'MINTOP OF BANK TOE OF SLOPE STAKE FABRIC TO BOTTOM OF TRANSITION TRENCH, 1 STAKE PER 3 L.F. WOODEN STAKE 1' FLOW FLOW 18" WOOD STAKE (EXPOSED PORTION TO FACE UPSTREAM) BANKFULL BASE FLOW TIE-IN MATTING (12" MIN) 12" * 1-FT MIN 6" MIN. ** COIR FIBER MAT BACKFILL AND TRANSITION INTO STREAMBANK * ** PROPOSED SLOPE COIR MAT TO OVERLAY STRAW, SEED AND 6 INCHES OF TOP SOIL EXISTING GROUND TRIANGULAR WOOD STAKE STAKES THROUGH BOTTOM FABRIC LAYER STAKES THROUGH BOTH FABRIC LAYERS SEE TRANSITION TRENCH DETAIL TOE OF SLOPE KEY-IN VERTICAL EDGE AT UPSTREAM BOUNDARY LIMITS KEY-IN VERTICAL EDGE AT DOWNSTREAM BOUNDARY LIMITS NTS PLOT DATE: 7/25/2018 2:18 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-06 Saved by BTHARRINGTON Save date: 7/25/2018 2:18 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-06 CIVIL EROSION AND SEDIMENT CONTROL NOTEST. SCHUELER PLANTING RATE 200 LBS/ACRE 70 LBS/ACRE PLANTING RATE 80 LBS/ACRE 1. FERTILIZE WITH 15 LBS. PER 1,000 SQ. FT. WHEN SEEDING. TOP DRESS WITH 10 LBS. PER 1,000 SQ. FT. WHEN COVER IS ESTABLISHED. 2. BETWEEN FEBRUARY AND MAY AND SEPTEMBER AND NOVEMBER, SEED WITH 130 LBS. PER ACRE OF RYE; BETWEEN JUNE AND AUGUST SEED WITH 40 LBS. PER ACRE OF BROWNTOP MILLET. 3. APPLICATION RATES AND/OR CHEMICAL ANALYSIS FOR LIME RATES SHALL BE ESTABLISHED BY SOIL TEST. 4. TACK MULCH BY APPLYING ASPHALT TACK AT A RATE OF 0.10 GAL/SQ. YDS (10 GAL/1,000 SQ. FT.) CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. SLOPES (GREATER THAN 4:1) TALL FESCUEFEB 15 - APR 30 DATE TYPE SLOPES (MAX. 4:1) 3 TURF-TYPE TALL FESCUE VARIETIESBERMUDA GRASS AUG 1 - OCT 15 FEB 15 - APR 15 DATE TYPE PERMANENT SEEDING PLANTING RATE 120 LBS/ACRE 40 LBS/ACRE RYE GRAIN GERMAN MILLET AUG 15 - APR 15 APR 15 - AUG 15 DATE TYPE TEMPORARY SEEDING OR SEP 1 - OCT 30 50 LBS/ACREPENSACOLA BAHIAFEB 15 - APR 30 OR SEP 1 - OCT 30 40 LBS/ACREKOBE LESPEDEZAFEB 15 - APR 30 OR SEP 1 - OCT 30 PERMANENT & TEMPORARY SEEDING SCHEDULE LIME 2000 LBS/ACRE 2000 LBS/ACRE MULCH 4000 LBS/ACRE 4000 LBS/ACRE LIME BY SOIL TEST BY SOIL TEST MULCH 4000 LBS/ACRE 4000 LBS/ACRE BY SOIL TEXT 4000 LBS/ACRE LIME BY SOIL TEST MULCH 4000 LBS/ACRE BY SOIL TEST 4000 LBS/ACRE PLANTING RATE 120 LBS/ACRE 40 LBS/ACRE RYE GRAIN GERMAN MILLET AUG 15 - APR 15 APR 15 - AUG 15 DATE TYPE WETLAND, RIPARIAN BUFFER AND SLOPES (GREATER THAN 2:1) LIME 2000 LBS/ACRE 2000 LBS/ACRE MULCH 4000 LBS/ACRE 4000 LBS/ACRE ALL TEMPORARY STOCK PILES ARE TO BE TEMPORARILY SEEDED WHEN SOIL IS NOT NEEDED IN THE NEXT 21 CALENDAR DAYS. 1. FROM MID-APRIL THROUGH MID-AUGUST ADD 10 LBS/ACRE GERMAN MILLET OR 15 LBS/ACRE SUNDANGRASS. PRIOR TO MAY OR AFTER AUGUST 15TH ADD 40 LB/ACRE RYE (GRAIN). 2. LIME AND FERTILIZER ARE TO BE DISKED INTO SOIL SURFACE TO A MINIMUM DEPTH OF 4 INCHES. 3. MULCH SHALL BE GRAIN STRAW OR EQUIVALENT. 4. ANCHOR BY TACKING WITH ASHPALT (0.10 GAL./SQ. YDS), ROVING, OR NETTING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. GRASS 1. CONDUCT A PRE-CONSTRUCTION MEETING WITH CONTRACTOR, OWASA PROJECT MANAGER, TOWN OF CHAPEL HILL REPRESENTATIVE, DESIGN ENGINEER, SEDIMENT CONTROL INSPECTOR, AND APPLICABLE AGENCY STAFF (E.G., US ARMY CORPS OF ENGINEERS, NC DEPARTMENT OF WATER QUALITY). CONTRACTOR TO ARRANGE MEETING; ALL PARTIES REQUIRE SEVEN (7) DAYS NOTICE. PRIOR TO MEETING, CONTRACTOR IS TO HAVE LIMITS OF DISTURBANCE AND TREE PROTECTION FENCING STAKED OUT FOR EXAMINATION. CONTRACTOR RESPONSIBLE FOR HAVING ALL UTILITIES MARKED IN THE FIELD. 2. INSTALL TEMPORARY SIGNAGE REGARDING EMINENT PROJECT CONSTRUCTION FOR PUBLIC KNOWLEDGE AS WELL AS PEDESTRIAN SAFETY FENCING AS DENOTED ON THE CONSTRUCTION DOCUMENTS. 1. CLEAR FOR PERIMETER SEDIMENT CONTROL DEVICES TREE PROTECTION FENCING, AND/OR SILT FENCE. INSTALL DEVICES AND FENCING. 2. ALL STREAM WORK IS TO BE COMPLETED “IN THE DRY.” INSTALL STREAM PUMP-AROUND AND SAND BAG COFFER DAMS AS DENOTED ON THE CONSTRUCTION DOCUMENTS. 3. INSTALL PUMP-AROUND SYSTEM ONLY FOR AS MUCH LINEAR FOOTAGE OF STREAM WORK WHICH CAN BE COMPLETED AND TEMPORARILY OR PERMANENTLY STABILIZED IN ONE DAY. PUMP-AROUNDS ARE ONLY TO BE OPERATED DURING NORMAL WEEKLY CONSTRUCTION BUSINESS HOURS AND SHALL NOT BE OPERATED OVERNIGHT OR DURING STORM EVENTS. 4. ALL WORK TO BE IMMEDIATELY STABILIZED WITH TOP SOIL, SEED AND COIR MAT AS SHOWN ON THE CONSTRUCTION DOCUMENTS. 5. REMOVE AND RE-DEPLOY PUMP AROUND SYSTEM(S) AS NEEDED. 6. INSTALLATION OF PERMANENT VEGETATIVE PRACTICES MAY COMMENCE IMMEDIATELY ASSUMING PROPER WEATHER CONDITIONS AND GROWING SEASON. 7. CONTRACTOR TO SCHEDULE AND CONDUCT FINAL SITE WALK. AFTER APPROVAL BY OWASA, THE AS-BUILT SURVEY MAY BE SCHEDULED. 8. WITH SEDIMENT CONTROL INSPECTOR’S PERMISSION, CONTRACTOR TO REMOVE SEDIMENT CONTROL FEATURES, RESTORE ANY DISTURBED AREAS TO ORIGINAL OR BETTER CONDITION AND DEMOBILIZE. 1. CONTRACTOR TO POST EROSION CONTROL PERMIT ON JOB SITE AS REQUIRED. 2. PERIMETER SEDIMENT AND EROSION CONTROL MEASURES SHALL BE IN PLACE BEFORE ANY LAND CLEARING OR DISTURBANCE ACTIVITIES MAY BEGIN. 3. A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN MONITORING DEVICE HAS BEEN APPROVED BY THE NC DIVISION OF WATER QUALITY. 4. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EROSION CONTROL MEASURES WHETHER OR NOT SHOWN ON THE PLANS TO PROTECT ADJACENT CREEKS, RIVERS, ROADWAYS, ETC. FROM SILTATION AND EROSION. 5. CONTRACTOR SHALL NOTIFY THE STATE LAND QUALITY SECTION (919) 791-4200 AT LEAST 72 HOURS PRIOR TO START OF CONSTRUCTION TO SCHEDULE A PRE-CONSTRUCTION MEETING. 6. CONTRACTOR STAGING/STOCKPILING AND PARKING AREAS SHALL BE CONFINED TO AREAS WITHIN THE LIMITS OF CONSTRUCTION. 7. ALL EROSION MEASURES SHALL BE INSPECTED WEEKLY AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT OF 12 INCH OR GREATER OF RAIN. MEASURES SHALL BE REPAIRED OR REPLACED AS NECESSARY. 8. ALL EROSION CONTROL MEASURES SHALL BE CLEANED OF ACCUMULATED SEDIMENT ONCE THE MEASURE HAS BECOME HALF FULL BY VOLUME. 9. SEDIMENT SHALL BE DISPOSED OF IN AN APPROVED MANNER SUCH THAT FURTHER SEDIMENT TRANSPORT DOES NOT OCCUR. OFFSITE DISPOSAL AREA, IF USED, SHALL HAVE ALL NECESSARY LOCAL AND STATE PERMITS. 10. ALL EXCESS SOIL RESULTING FROM INSTALLATION OF RAMPS SHALL BE REMOVED FROM SITE BY THE CONTRACTOR. ANY SOILS TAKEN OFF SITE BECOMES THE CONTRACTORS RESPONSIBILITY AND SHALL BE STOCKPILES AT LOCATIONS WITH ALL REQUIRED STATE AND LOCAL PERMITS. 11. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL ENTIRE SITE IS COMPLETELY STABILIZED WITH VEGETATION AS PER SEEDING SPECIFICATIONS AND SCHEDULE. ALL TEMPORARY EROSION CONTROL DEVICES ARE TO BE REMOVED AFTER COMPLETE STABILIZATION HAS BEEN ACHIEVED. 12. THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREA INCLUDING DITCHES/SWALES TO ORIGINAL CONTOUR AND SLOPE AND TO ORIGINAL OR BETTER CONDITION, EXCEPT WHERE NOTED ON THE CONTRACT DRAWINGS. 13. TOTAL ACREAGE DISTURBED = 0.12 ACRES. 1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF PRODUCING RAINFALL. STRUCTURES THAT SHALL BE INSPECTED INCLUDE: 2. ANY FABRIC WHICH COLLAPSES, TEARS, DECOMPOSES OR BECOMES INEFFECTIVE SHALL BE REPLACED IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED WHEN SEDIMENT BEHIND THE FENCE REACHES SIX INCHES. 3. SEEDED AREAS SHALL BE INSPECTED FOR FAILURE AND NECESSARY REPAIRS AND RE-SEEDINGS SHALL BE MADE IMMEDIATELY, OR WITHIN THE SAME SEASON, IF POSSIBLE. 4. INSPECT CONSTRUCTION ROAD SURFACE REGULARLY, MAINTAIN IN A CONDITION TO PREVENT SEDIMENT FROM LEAVING THE SITE, AND TOPDRESS WITH ADDITIONAL STONE WHEN NEEDED. SWEEP EXISTING ROADWAY TO REMOVE ANY ACCUMULATED SEDIMENT. SEDIMENT MAY BOT BE WASHED FROM ROADWAYS. 5. REMOVE SEDIMENT FROM AROUND INLET AFTER EACH STORM. CLEAN OR REPLACE PROTECTIVE MEASURES AS NEEDED. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF-INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF-INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF-INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM: HTTP://WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. 1. CONTRACTOR SHALL PREPARE ALL AREAS TO RECEIVE TEMPORARY OR PERMANENT SEEDING MEASURES PRIOR TO PLANTING. 2. TOPSOIL SHALL BE PLACED IN AREAS TO BE SEEDED AND ROUGHENED WITH TRACKED EQUIPMENT OR OTHER SUITABLE MEASURES. SLOPES STEEPER THAN 3:1 MAY BE ROUGHENED BY GROOVING, FURROWING, TRACKING, OR STAIR-STEP GRADING. SLOPES FLATTER THAN 3:1 SHOULD BE GROOVED BY DISKING, HARROWING, RAKING, OPERATING PLANTING EQUIPMENT ON THE CONTOUR. 3. SOIL AMENDMENTS INCLUDING, BUT NOT LIMITED TO, LIME AND FERTILIZER SHALL BE SPREAD AS NECESSARY, AND AT THE RATES SHOWN IN THE SEEDING SCHEDULE. SEEDING SHALL BE AS PER TYPE AND RATES SHOWN IN THE SEEDING SCHEDULE. SEED SHALL BE BROADCAST AS SOON AS POSSIBLE FOLLOWING ROUGHENING, BEFORE SURFACE HAS BEEN SEALED BY RAINFALL. 1. MULCH MUST COVER A MINIMUM OF 80 PERCENT OF THE SOIL SURFACE AND MUST BE SECURED BY TACKING, CRIMPING, OR NETTING. 2. WOOD CELLULOSE FIBER MULCH SHALL BE USED IN HYDROSEEDING GRASS SEED IN COMBINATION WITH FERTILIZERS AND OTHER APPROVED ADDITIONS. 3. NETTING WITH PLASTIC MESH AND/OR PLASTIC TWINE SHALL BE USED IN WETLAND AND RIPARIAN BUFFERS TO PROTECT SMALL ANIMALS. 1. HYDROSEEDING SHALL BE CARRIED OUT IN THREE STEPS. STEP ONE SHALL CONSIST OF THE APPLICATION OF LIME. IN STEP TWO THE SEED MIXTURE SHALL BE MIXED WITH THE FERTILIZER, WOOD CELLULOSE FIBER MULCH, AND ANY REQUIRED INOCULANTS AND APPLIED TO THE SEED BED. STEP THREE SHALL CONSIST OF APPLICATION OF TOP DRESSING DURING THE FIRST SPRING OR FALL, WHICHEVER COMES FIRST, AFTER STEP TWO. 2. INGREDIENTS FOR THE MIXTURE AND STEPS SHOULD BE DUMPED INTO A TANK OF WATER AND THOROUGHLY MIXED TO A HOMOGENEOUS SLURRY AND SPRAYED OUT UNDER A MINIMUM OF 300-350 POUNDS PRESSURE, IN SUITABLE PROPORTIONS TO ACCOMMODATE THE TYPE AND CAPACITY OF THE HYDRAULIC MACHINE TO BE USED. APPLICATIONS SHALL BE EVENLY SPRAYED OVER THE GROUND SURFACE. THE CONTRACTOR SHALL FREE THE TOPSOIL OF STONES, ROOTS, RUBBISH AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. THE BARE SOIL, EXCEPT EXISTING STEEP EMBANKMENT AREA, SHALL BE ROUGH RAKED TO REMOVE STONES, ROOTS, AND RUBBISH OVER 4-INCH IN SIZE, AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. 3. NO SEEDING SHOULD BE UNDERTAKEN IN WINDY OR UNFAVORABLE WEATHER, WHEN THE GROUND IS TOO WET TO RAKE EASILY, WHEN IT IS IN A FROZEN CONDITIONS, OR TOO DRY. ANY BARE SPOTS SHOWN IN TWO TO THREE WEEKS SHALL BE RECULTIVATED, FERTILIZED AT HALF THE RATE, RAKED, SEEDED, AND MULCHED AGAIN BY MECHANICAL OR HAND BROADCAST METHOD ACCEPTABLE TO THE OWNER. 100Y R 100 Y R 100YR 100YR 100 Y R 100YR 100YR 100YR 10 0YR 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 0 0 Y R 1 00 Y R 10 0Y R 1 00 Y R FB TPATPATPATPATPATPATPATPATPA TPA TPA TPA T PA TPA T P A T P A T P A T P A T P A T P A T P A T P A TPAP TPFTPFTPF TPFTPFTPFTPF TPFTPFTPFTPF TPFT P FTPFTPF TPFP S F S F S F SFSFSFLODLODLODLODLODLODLODLODLODLODLODLODLODLODTPFTPFTPFTPFLODLODLODLODLODLODLODLODLODLODLODLODLODLODL O D L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODL OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD L OD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODPLOT DATE: 8/3/2018 12:27 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-07 Saved by BTHARRINGTON Save date: 8/3/2018 12:23 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-07 CIVIL EROSION AND SEDIMENT CONTROL PLANT. SCHUELER 1 5 "R C P 15"RCP 1 8 "R C P 18"RCP18"RCPFLOW BEAVERDAM CREEK FLOW EL.=245.58' CONC. BRIDGE PROPERTY LINE, TYP.GLENWOOD GARDENS LANEM A R K E T B R I D G E L A N E G L E N WO O D G A R D E N S L A N E 0 10'5 SCALE: 1" = 10' 10 DEWATERING PUMP LINE C-08 FILTER BAG SEE SHEET C-08 TREE PROTECTION FENCE, TYP. SEE SHEET C-08 LIMITS OF DISTURBANCE, TYP. DEMO EXISTING TREE, TYP.CLEANWATER DIVERSION PUMP LINE SEE SHEET C-08 SAND BAG DIKE, TYP. SEE SHEET C-08 DEWATERING PUMP SEE SHEET C-08 CONTRACTOR LAYDOWN/STAGING AREA EROSION CONTROL LEGEND ROCK OUTLET PROTECTION SAND BAG DIVERSION TEMPORARY PUMP AROUND PUMP FILTER BAG CONSTRUCTION ENTRANCE COIR MAT STAGING AREA LIMITS OF DISTURBANCE TREE PROTECTION FENCE SILT FENCE FLOODPLAIN, TYP. C O N T R A C T O R L A Y D O W N /S T A G I N G A R E A SILT FENCE, TYP. SEE SHEET C-08 CONTRACTOR TO PROVIDE CURB PROTECTION DURING CONSTRUCTION AND IS RESPONSIBLE FOR REPAIR EFFORTS AND COST IF CURB OR PAVEMENT IS DAMAGED CLEANWATER DIVERSION PUMP SEE SHEET C-08 PLOT DATE: 7/25/2018 2:17 PM BY: BTHARRINGTONFile: O:\31301-RAL\31301-000\DESIGN\DRAWINGS\CIVIL\C-08 Saved by BTHARRINGTON Save date: 7/25/2018 2:09 PM IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: GLENWOOD GARDENS LANE BRIDGE ABUTMENT PROTECTION REV ISSUED FOR DATE BY GARDENS ON GLENWOOD HOME OWNER'S ASSOCIATION RALEIGH, NORTH CAROLINA 0 1"1/2" 31301-000 CLIENT N0.: HAZEN NO.: DATE: DRAWING NUMBER: T. SCHUELER 100% DRAFT - NOT FOR CONSTRUCTIONHAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. : C-0381 JULY 2018 T. SCHUELER C. McNICOL C-08 CIVIL EROSION AND SEDIMENT CONTROL DETAILST. SCHUELER 0227000 STEEL POST 3'-0" MINFILTER FABRIC3'-0" MINGRADE LINELINE WIRESBOTTOM STRAND TOP STRAND STAY WIRES MIN 8"MIN2'-0"MIN8" 2'-2" MIN 8'-0" MAX GALV WIRE FABRIC AND FILTER FABRIC. BURY TOE OF FILTER FABRIC A MIN OF 8" ELEVATION SILT FENCE SECTION SILT FENCE 1. EXTRA STRENGTH FILTER FABRIC (AS APPROVED BY ENGINEER) WITH 6'-0" POST SPACING DOES NOT REQUIRE MESH SUPPORT FENCE. 2. FILTER FABRIC SHALL BE WIRED DIRECTLY TO POST. NOTE: