Subject: Application for Section 404 Nationwide Permit 23, Section 401 Water
Quality Certification and Revised Application for Section 404
Nationwide Permit 33 for the proposed replacement of Bridge No. 99 over
Long Creek on SR 1968 in Stanly County, Federal Aid Project No. BRZ-
1968(1); State Project No. 8.2681701; Division 10; TIP No. B-3909, $240.00
Debit Work Order 8.2861701, WBS Element 33344.1.1.
Reference: February 4, 2009 Application for Section 404 Nationwide Permit 33
Dear Sir:
The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No.
99 over Long Creek on SR 1968'. In addition to the 0.05 acre (49 linear feet) of temporary
stream impacts requested in the original permit application dated February 4, 2009, there
will be 90 linear feet of permanent stream impacts and <0.01 acre (45 linear feet) of
temporary stream impacts to a previously undocumented intermittent unnamed tributary to
Long Creek. Therefore, final impacts total 0.05 acre (94 linear feet) of temporary stream
impacts and 90 linear feet of permanent stream impacts on this project.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONNENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-715-1934
FAX: 919-7156501
WESSITE: WWW..NCDOTORG
LOCATION:
4701 ATLANTIC AVENUE
SUITE 116
RALEIGH NC 27604
Please see enclosed copies of the Revised Pre-Construction Notification (PCN), revised
permit drawings and plan sheet 4 of the design plans for the above-referenced project. The
Categorical Exclusion (CE) was completed in March 2003 and the CE Addendum was
completed in July 2006. Documents were distributed shortly thereafter. Additional copies
are available upon request.
This project calls for a letting date of August 17, 2010 and a review date of June 29, 2010.
A copy of this permit application will be posted on the NCDOT Website at:
http://www.nedot.org/doh/preconstruct/pe/. If you have any questions or need additional
information, please e-mail Erin Cheely at ekcheely@ncdot.gov.
Sincerely,
u.. Gregory Thorpe, Ph.D.
Environmental Management Director, PDEA
W/attachment:
Mr. Brian Wrenn, NCDWQ (5 Copies)
Ms. Marella Buncick, USFWS
Ms. Marla Chambers, NCWRC
W/o attachment (see website for attachments):
Dr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
Mr. Victor Barbour, P.E., Project Services Unit
Mr. Mark Staley, Roadside Environmental
Mr. Barry Moose, P.E., Division Engineer
Mr. Larry Thompson, DEO
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USACE, Wilmington
Mr. Ahmad Al-Sharawneh, PDEA Project Planning Engineer
2
oNi? t
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
la. Type(s) of approval sought from the
Corps:
® Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 23 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ®No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Replacement of Bridge No. 99 over Long Creek on SR 1986
2b. County: Stanly
2c. Nearest municipality / town: Albemarle
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B-3909
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 431-6697
3g. Fax no.: (919) 431-2002
3h. Email address: ekcheely@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
41'. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
2
B. Project Information and Prior Project History
1. Property Identification
la. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 35.266667 Longitude: - 80.256944
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 5.11 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Long Creek flows into Rocky River approximately 4.6
proposed project: stream miles from project area. The Hydrological
Cataloguing Unit is 03040105.
2b. Water Quality Classification of nearest receiving water: Class "C"
2c. River basin: Yadkin-Pee Dee
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Land use is approximately 60% forest land (broadleaf deciduous forest) and 40% disturbed land (inlcuding pasture and
residential)
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
135
3d. Explain the purpose of the proposed project:
The purpose of this project is to replace a functionally obsolete and structurally deficient structure (sufficiency rating 48.5
out of 100). The replacement of this inadequate structure will result in safer and more efficient traffic operations.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing an 82.5-foot bridge with a 264-foot, 3-span bridge on close to the existing alignment with
an off-site detour. Standard construction equipment will be used (backhoes, bulldozers, cranes and/or other heavy
machinery).
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property
/
® Yes ? No ? Unknown
project (including all prior phases) in the past?
Comments: Verified on 4/23/02, but has since expired
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ®Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Environmental Services,
Name (if known):
Inc
Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Verified on April 23, 2002, expired April 23, 2007
5. Project History
5a. Have permits or certifications been requested or obtained for ®yes ? No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
A Section 404 Nationwide Permit 33 was applied for on February 4, 2009. At the time, the only impacts on this project
were from the temporary causeways in Long Creek. Polly Lespinasse (NCDWQ) informed NCDOT in late February about
the existence of a previously undocumented intermittent stream that would likely be impacted by the project. NCDOT
went out to the site on 3/4/09 to fill out stream fortes and GPS the stream. Updated drawings were prepared and this
application is a revision to the previous NW 33 and a request for a NW 23 and written 401 certification to account for the
impacts to this intermittent tributary to Lang Creek.
6. Future Project Plans
6a. Is this a phased project? ? Yes ®No
6b. If yes, explain.
4
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams -tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
Site 1 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 2 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 3 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 4 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 5 ? P ? T ? Yes ? Corps
? No ? DWQ
Site 6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 Permanent
0 Temporary
2h. Comments: No wetlands exist within the construction limits of this project.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average Impact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermittent (Corps - 404, 10 width
Temporary (T) (INT)? DWQ - non-404, (feet)
other)
Site 1 ? P ® T causeways Long Creek ® PER
? INT ® Corps
? DWQ 75 49
Site 2
®P ? T stream UT1 to Long ? PER ® Corps
2
90
relocation Creek ® INT ? DWQ
Site 3 P
® T stream UT1 to Long El PER ® Corps
2
45
relocation Creek ® INT ? DWQ
Site 4 ? P ? T ? PER ? Corps
? INT ? DWQ
Site 5 ? P ? T ? PER ? Corps
[I INT ? DWQ
Site 6 E] P E] T El PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 90 Perm
94 Temp
3i. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual) list all open water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number - waterbody Type of impact Waterbody type Area of impact (acres)
Permanent (P) or (if applicable)
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts 0 Permanent
0 Temporary
4g. Comments: There is no open water within the construction limits of this project.
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Excavat
Flooded Filled ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse
?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Temporary T required?
61 ?P?T ?Yes
? No
82 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
7
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
No deck drains will be used and NCDOT's Best Management Practices will be followed. The bridge will be replaced in-
place with an off-site detour. In addition, the new bridge will be 264 feet long, which is significantly longer than the
existing 82.5-foot bridge.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Temporary causeways will not be installed at the same time to maintain adequate flow in the creek. The temporary
causeways will be removed after construction has been completed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c.
If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete If Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ
6a . Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b . If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b . If yes, then is a diffuse flow plan included? If no, explain why.
Yes No
? ?
Comments:
2. Stormwater Management Plan
2a . What is the overall percent imperviousness of this project? N/A
2b . Does this project require a Stormwater Management Plan? ® Yes ? No
2c . If this project DOES NOT require a Stormwater Management Plan, explain why:
2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Stormwater Management Plan is attached.
? Certified Local Government
2e . Who will be responsible for the review of the Stormwater Management Pian? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? not applicable
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a. Which of the following state-implemented Stormwater management programs apply ? HOW
(check all that apply): ? ORW
? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No
5b. Have all of the 401. Unit submittal requirements been met? ® Yes ? No
10
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ® Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)? -
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ® Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Welland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes
additional development, which could impact nearby downstream water quality? ®No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The new bridge will be constructed in the same location as the old bridge.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
11
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ® Yes ? No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. E] Raleigh
® Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NCDOT field surveys, last conducted September 27, 2007
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ®No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ®No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
Dr. Gre¢ory J. Thorpe, Ph D o I '"" 1
A
' D
pplicant/Agent
s Printed Name
Ap icanUAgent's Signature ate
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.
12
U.S. ARMY CORPS OF ENGINEERS (OO [Py
Wilmington District ?0
Action ID: 200230733 County: Stanly
Notification of Jurisdictional Determination
Property Owner: NCDOT Authorized Agent: Environmental Services, Inc.
Address: William D. Gilmore, Project Attn. Matt K Smith
Development and Environmental Analysis Address: 524 New Hope Road r
1548 Mail Service Center Raleigh, NC 27610 Raleigh, NC 27699-1548 Telephone:919-212-1760
Telephone: 919-733-3141
OR Size and Location of Property (waterbody, Highway name/number, town, etc.). TIP No. B-3909, Bridge over Long Creek on SR 1968 near Albemarle, Stanly C Basis for Determination: Delineation Map and Data Forms dated March 6, 2002
Indicate Which of the Following apply:
0 There are wetlands on the above described property which we strongly suggest should be delineated and surveyed
The surveyed wetland lines must be verified by our staff before the Corps will make a final jurisdictional
.
determination on your property
0 On the undersigned inspected the Section 404 jurisdictional line as determined by the NCDOT and/or
its representatives for the subject NCDOT project/comdor. A select number of sites were inspected and all were
found to accurately reflect the limits of Corps jurisdiction. The Corps believes that this jurisdictional delineation
can be relied on for planning purposes and impact assessment.
The surface waters and wetlands on this project have been delineated and the limits of the Corps jurisdiction have
been explained to you. Unless there is a change in the law or our published regulations, this detenrunation may be
relied upon for a period not to exceed five year from the date of this notification.
0 There are no wetlands present on the above described property which are subject to the permit requirements of
section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this detemrination may be relied upon for a period not to exceed five years from the date of this
notification.
0 The project is located in one of the 20 Coastal Counties. You should contact the nearest State Office of Coastal
Management to detmnine their requirements.
Placement of dredged or fill material in wetlands on this property without a Department of the
Army permit is in most cases a violation of Section 301 of the Clean Water Act (33 USC 1311). A
permit is not required for work on the property restricted entirely to existing high ground. If you
have any questions regarding theiCorps of Engineers regulatory program, please contact
Steven W. Lund at 828-271-7980 x 4.
Project Manager Signature
Date: April 23, 2002
Expiration Date: April 23, 2007
SURVEY PLAT OR FIELD SKETCH OF DESCRIBED PROPERTY AND THE WETLAND
DELINEATION FORM MUST BE ATTACHED TO THIS FORM.
e'
a
, .a I
63 %
74 41?`
SITE i 24
27
/ 20
2t
SEE INSET 2] i
BE" I
0 52
I ,
? 00
, 1138
?J
2 ?1
STANLY COUNTY + `•1,? vl ?.,'
J,? p1
t1
ll ? °1?(Iti t?`/. I,• t ?/?..'!•,/!' ._,i?-•? ,%//C/.rf,.? ? PF I•l,
T + t ay r ./ 11 1 I \ r l_ ' , r, I1 / {y -
?? !\? \ r`r??p (! (G. '11[• I N Jr / ?" dpi t
j 1.
fi /v 1??\ \? / ? I ? ?',' I>r III / \ T"NAAGGGOOY/__
^\y
r P III' hl ,. '? 4 '• / Y I \?•-al/?i. r. r,\ f}v
II! ;' T ?i? \ I}SI ?. \? ham' J`, II IlI??? I fit/' w/ I ,:Y? I \ r r v. /r > I ? ? ry' `may ?A' : \ , y'i r 1 4?°• '?- ,?{ ,' ?
y ?`t.Jf r r`?, l
k. 11 •Ji" /.i21{ 2\. t A`1 f r M1'.1\}. ?. ?f\l f.i' 1 lv1 // / /
N.C DBPT.OF TRANSPORTATION
DIVISION OF HIGHWAYS
WETLANCYSTREAM IMPACTS STANLY COUNTY
VICINITY MAP PROJECT: 33344.1.1 (B-3909)
Re?;ur? BRIDGE NO. 99 OVER
LONG CREEK ON SR 1968
:mlt Orav4ng (HARTSELL RD)
yllixt J W 10
SHEET-OF- 10'02,08
1,,
PROPERTY OWNERS
NAMES AND ADDRESSES
PARCEL NO. NAMES ADDRESSES
JANET S. AND RICKY D. EUDY
245 JAMES RD
OAKBORO, NC 28129
4 THOMAS D. AND 290443 HARTSELL RD
CARISSA F. JORDAN ALBEMARLE, NC 28001
Gvise d
r'?rmit Drawing
Sheet a of 10
C)
a
a z a
A F+1 aU I z O, 0 =
a' ^PZ?
oz_ .4 Z = O v?Ow
3> F O MZzw?
06 Z z M"'=
w Q 00? rjo v
a > ? N pmz 0
L >_ O
x Z w
o N
W
v Q
W
N
W
E.y I I
II
II
II
II
I I •+ n
o
v ?
Ln T C _G
O
N
W so
r
CL CL
49 U)
¢ h
ya r _o
° v
3¢ W F
L) UJCL a
LLJ O V) N 0
Q- N (A
r
W N
Vt/1 W Q J M
0 0 a L) u,
M r
co M 3 ?vJ a C D m
Z W O p LLI
W E
r J O a' }
V1 W O Q W
X V1 >
W
3
i Kt?Sp.D
Permit Dravvitp
Sheet 3 pf ??
s
f
Q 0
d
a z o
a
,
Q
U J ma
=
Z moN°
0
x
1 O
2
= Z .
o O
j
::
e
t/1 J W K
U
?
?
W
a Wo
Q
N
?> omz
O
® a O
.. r
z w
°
LLI
v Q
W
? o
~
M N
W
L
l
n a
V o
T Q G
O O K
N Ln O
/ss
a W
cr 11 11
Q a a ?
2 4 . ai
r cr M o
Qc
X N aau
W
V
LLI
z
N D ?_ tll
° ac O N N F
LA IA 0
W
° -
? 1T
Y 4 -9 in
co
?"
. I Q U U
M 3 D:.. O O
z
> 0
J
LL ?
0
o La Q E
W
r
4A J
W +
U)
Q
1t
W
V;
W
0
>
3
2 RQJS(D
Permit DraWing
Sheet 4 of 16
_
0
z ?
P
P
F O
' y ? n
4
0
y Q LO
y 3 ? -
z
?1
a
C O j
W U - x O
CL
O O
n
? Q m
W
y
[L
6
a w O
w q a
CL U
Z
F
W
x
N
CL
CL o N
s
2-w
U
Parmtt Drawhg s
@
p(
?
,
??m
Z ?
01 d N
?
h p C U O.
mny'?
v
v
m
U y
'XLE?
y C
C C U C
W ?= C (p y? O p
a x t E E C
WU rn rn
3 a
W
U
Q
LL
Ti
?
U
u>
O
?n
y
E
in
10 0
o
v O
o
} D E
F
C ?
a
y N
C ? U
d ?
?
O
O
y U ? 0 0
v a
¢ ? N
a c c
? m m c -M
m
U 3
?
y
° p'C ? p O
?
rd o
z 3
U
F U ?
c
? -
a d O
J W
H
W y
a
c
E
- ?
C N
C C C
O
CIL?
a O
d n w
j T (n
a
w
J J
C O N
? 2 O In
o r
?
O J
a
_
y z N F
-
Q
lest 5
H
?CONTRACT:
o p o I u s ,
T N r N N IJ
m T N N
O 2 p ~
2 N Z
~
N }n?
?O
C O ? C ? y
Fs I
o $ o ? 8
c gg?b
N N
(? < -1 0 < O 0 h fl1
II II II II II 11 II x jI
c Oc o w 0 j o a
39 ee2e° a
m°
I CID
fr ? 2 r
cZi r 2
Z 2
0
i 2 ? ?
O 0
o > c=, w
1
O 9 O
O (? D
a ? ? y s
II b ? i
II II 'ti ?h
p p p ??
P O lJ -
P
m m
H ! N VI i (/1 j)
a ? a
I
Oa t
tin try ? " :_
a >4
A ?
1 Y a
p; CCCa
93 ?? aaa
n ?1 00 i?n2
wW mm mm^o
? u vlt/1 ti?my
,Q {n o 22 per=
PI ? V1 ep `mc?
Ro rig
g?
?y
W?
s
c
? I
p I r ?
?? ?II of
/0'`00
15+00
rrn N
I O m
? ~O
I n ?
20+00
rn
(YI
ro
O
444
m m? ?
m
vmi2
m
n o
H
a?
O
b?
a +
r ++ n
(D -V ?t
g? ' O d
a ?
'
w
y F
3
p
? ?
9
uu
L
I 'I
m
O
? O
?nnC
?O
?P
!z
(D1 q
(Ax
TIP PROJECT: B 3909
b vJ
? a
y y
0o C
y? O
i
G7 ? ?
M?
`J
NAp as
f i
n I
s
o
9
I
c
yy?
3F
I
I ?
? y
xe wn
are wm mm
V
41 W
?x x
0 o I
A A I
co I
Z
mmm I„??p
?-I ?Imm zz?
STA 3 57.43 o„m
?
? J., \ i'xi o
nm
`
\ o x< 9
n r g
?c?c??v,mx Q? /
?
\
\ u ll
Il mommiF
mn /
,
\ ue
N `e 5?pmp? nm? C
= /
''\ O O O+ C
yymp SECS U(q
GIrA 9"per 50L /
?1• q mo ? n2 2 LPA.
\ \ 2 G -
t
' , I
I
11
11 II
Il
II 11 II
I
I
J \ \ 1 1 Q
?
:• ,? \ ?alwr-IW I
I ?
lal IaI ' mo m
SEA ? 0 I
- b E
C T ?ITAgi
?IT?ti ms; i 0N
=
ry2
V
InN Vf 00 O
y
e a A O m
J N END P T M1^ H m N W O
F
BE L
P
LAT
SS pSTL
ENO SP S A
r B
; to
.
$TA p
C
5p
R
D N O m ?p
EL
3fi25 j
El JI
S
\ 9 m I E SP AT
p 1.
H
arr3
yy' CH
CH % 0
EL 607
SiA I
EE L6
II w W W J
0
2S O
'
i m
E O SP AT N H =IDS I
Q
E
JNID
\
W W OO
I
N
n
•
\ / II
Y Y
t •
\ m J
/ Y II I
? fJ
I \ N +Oi O N u ?
I. W ? / ? q aS
\
7C x v
\ BE SP LAS I
V CH
16 m 1
\ S L
E /
7
5J m D w
2
W
j P 41 P
TFA e
/ I
N \ I / ?I
I
li \ I /
II \
I
m OWI
nl mi
D
T N?
ENO
N
T
N WW
9r
I EL I u
°n3
0
T r9
N
I I? C MOW
-
A EL
J M
2 A
+
UUrr
BEG AA I LT : Lam. y
7l?
N
AD v m .
m N
P Dug
y ma
STA
5 l
y
N c N
0
EL 3 i N
s W
5Ta I6L HT W
?
I
m m
b"li a
END LA U H I
V I O
M
F ,
V D O
EL JJ9D „ I
b' i I S W
4 W w
EN Ur V C
N q e
O
A L I
O m
L 395
I O
I \ ?1 I O
II
W
I
y I
a
A
:T CD
CD
W A l
Z
W ?, I W G
z
O
Z
P+
P x
SrA X Br
:0
N y E J \\ 357.43 B 3
q
.
$ E
8 0 1 z
O N I Z
O
.A
Wp
r
C
Z
N ®? u
14
L?LJ
mm {[IATFf
WafM1E{
ffllEf
N
I
YAI
N W
N
I W
N W
N
N
N
W
N
'P'
N
N
N
W
N A
N
W
N
N
_
I
l I
I I
I
° I
I
I I
I
? I
I
I I
I
I
I
I
I
I
i
I I
I
I
I
O I
I ? I I
I ? I
L I
I
I
I
I
I
I
I
I
I
I
I
I
O I
I
I I
I
I
I I
I
I I
I
I I
I I
I
I
\
I
I
?
\ I I
I \ I /
I
I ?
I
I ?
I
I I
II
I
I
I ,
I I
I
I I
I
I I
I
I
I
I I
I m
? I
I I
I I I
I i
I
I
? s
D?
inm
I
?
I
I
??
A? .
I I I Nn ??
N
I I
I
I ? I I I I sz
T
I I
i I I 'x
'I
D
- I m?
FF
-i
m?^
l
I
I
I z _
I
I . I ?
P+ !I I +
31214
N8 i $ I Ng ? ? mg
I I °
III 'I
/ I
j
I I
I I /
I
I
I
I
I
I
I
I
I
I
I I
I
I I
I
I
I I
I
I
I
I
I j
I
I I
I
I I
I
I
I I
I I
I I
/
I I I ?
I \
I
I
I I
I I
I m I
? m
I
I
I
I
? I
I
I I
I
I
I
I
I
I
I
?
I
I 0
I
I I
I I
I I
I
1 ?
I
I
I
I
I
I
I ?
°
I
I I I
I I
I
° ?7 CD 7
?? ? I I I o
I g I I I ??
I pN ? I m
I
I
$ ? ?
I I
i I
II Z
o
o ? j
O I I I
r
9? I ° m
nz A o
i
1
»
?K I i 11" o
o 9
r i MO
$9
T, ? W
W W
A W
N W
W W
A W
N W
N 'W
W W
'> W
N W
W W
L W
N {=fin
N N N N N N N N N tJl N N In N
10
^n
RPH
9?
M
m
g?
N
2
?rfer•is r? r-
al
grr
ea
??qq
? F .
10O w"
i5pp55x1I
Hp
Bs
I
B3
aq
ae. ? !
gas m aj-
C4G -
E E E
E E E
E E E
E E F
Y
n
Bas'
a p
¢ a
I
nnnb a -
a
Bass ?a 5
CC?S tv 5 g
P
0
9
?s
i
.i
g
94
O R?
4 5
b5\y?y?A`' ¦¦[[
/?\0\•5'r y C?
s?
\J T O Rf?w
Iv a
y<?
o?n
gig
olp -,-'
Half
R41
Q
i?
gs
E?
2?2w-I-oD-b
Ohhp 11 11 n5l?ii II55i y/
I
471100 I Ai?a rl
C N 16YIPf
Sta
ue.\T, r
A/w
ti7
I
?y I
I•
I
{
? I
C
15100
I
^ 510.16
?a
I
?I'419ia-51-oD? /
SAUnII,?
ror?d g??i''aa I e3
4 O NQ `Aj
/.0400 /
I
I
?m?A-II-oD?
?IIpMn II Q
g w+5?
I /
4
81
R?0 ??