Loading...
HomeMy WebLinkAbout20190397_Site visit - August 21 2018_20180810Wanucha, Dave From: Buncick, Marella <marella_buncick@fws.gov> Sent: Friday, August 10, 2018 3:51 PM To: Wanucha, Dave Cc: Steve Kichefski; Chambers, Marla J Subject: Re: [External] RE: [Non-DoD Source] RE: R-2566BA Watauga River Bridge Replacement , Division 11; County: Watauga - Site visit - August 21, 2018 �� � �����i �u �i i� uuiu �.. �. .. ' �� . w w w w . � �� v� v� w� ��. w �� �� w �� „w .� ���� .� � v� � �� �� w v� �� �� � � A a luum u�l�u uum u�m uuuu ulll�m u uiiiiii imlm i�i iiiii i u�i liiuoi�illllll�uuli�i�i�i mio i u u uum uum i�i um m��u li uuu i�u i u u�i ulluu IVu luuu u� luuu � uum i�i umo m�uu uuoi uuu u�i i�i�i uiki i�i m um uum i�i i uiki uuii uim �u uiiki u� i ul�li uuu uuuu u uuu uuu u�i luum u�iIIIIIIGm�uum um i uuu u uum uuuu um uum u�i�i uuoi u i uuoi um uuoi u�i umo m m uuo uuu i�i u�i�i luuii u�i Iluu uu uum I'm also planning to attend. I think it will be fine to do this without you and we can fill you in. On Fri, Aug 10, 2018 at 2:06 PM, Wanucha, Dave <dave.wanucha@ncdenr.�ov> wrote: I'm planning to attend. DOT may want you there but I think we can keep you apprised of any potential problems of which you would likely hear about anyhow. Dave W Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.WanuchaC�ncdenr.�ov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Kichefski, Steven L CIV USARMY CESAW (US) [mailto:Steven.L.Kichefski@usace.army.mil] Sent: Friday, August 10, 2018 11:00 AM To: Marella Buncick@fws.�ov; Chambers, Marla J<marla.chambers@ncwildlife.or�>; Wanucha, Dave <dave.wanucha@ncdenr.�ov> Subject: [External] RE: [Non-DoD Source] RE: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.�ov> I am in Idaho for work that entire week and will be unable to join a field visit. I know there has been a desire to meet with NCDOT in the field, the timing seems important with the CFI meeting/final plan development and the main issues seem to be more stormwater/construction disturbance/temporary impacts both above and below the jd channel, so thinking it would best to keep the meeting scheduled without me. Just wanted your feedback before I respond regarding whether that date works for you and if you feel that I should reschedule so I can be present? Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 to complete the survey online. -----Original Message----- From: Adima, Nathan N [mailto:nadima@ncdot.�ov] Sent: Wednesday, August 8, 2018 2:55 PM To: Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.�ov>; Chambers, Marla J<marla.chambers@ncwildlife.or�>; Buncick, Marella <marella buncick@fws.�ov>; 'militscher.chris@epamail.epa.�ov' <militscher.chris@epamail.epa.�ov>; Beaver, Brian T <btbeaver@ncdot.�ov>; Dagnino, Carla S<cda�nino@ncdot.�ov>; Paschal, Keith <kpaschal@ncdot.�ov>; Bob May <BMay@wetherillen�.com>; David Petty <dpetty@t�sen�ineers.com>; Cochran, Cameron <acochran@ncdot.�ov>; Lipscomb, Brian S<blipscomb@ncdot.�ov>; Dilday, Jason L<ildilday@ncdot.�ov>; Lee, Craig J<cilee@ncdot.�ov>; Cox, Marissa R <mrcox@ncdot.�ov>; Beaver, G Trent <tbeaver@ncdot.�ov>; Slaughter, Johnathan H<hslau�hter@ncdot.�ov> Cc: Zerman, William S<bzerman@ncdot.�ov>; Robinson, Beverly G<brobinson@ncdot.�ov> Subject: [Non-DoD Source] RE: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018 � After a reconsideration of the travel time from Raleigh area to Boone (about 4 hrs.), it seems better to schedule the site visit in the morning of Wednesday, August 22, 2018. In that way it will be cooler for the site visit, the CFI will be in the afternoon and the convenience of those traveling from Raleigh area to travel the night before. Please let me know your thoughts. Thanks Nathan N. Adima, PE Project Manager Project Management Unit - Divisions 11-14 North Carolina Department of Transportation 919 707 6210 office 919 707 6200 main nadima@ncdot.�ov <mailto:nadima@ncdot.�ov> 1000 Birch Ridge Drive Raleigh, NC 27610 1582 Mail Service Center Raleigh, NC 2699-1582 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Adima, Nathan N Sent: Wednesday, August 08, 2018 12:38 PM To: Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.�ov>; Chambers, Marla J <marla.chambers@ncwildlife.or�>; Buncick, Marella <marella buncick@fws.�ov>; militscher.chris@epamail.epa.�ov; Beaver, Brian T<btbeaver@ncdot.�ov>; 'hslaughter@ncdot.go' <hslaughter@ncdot.go>; Carla S Dagnino (cda�nino@ncdot.�ov) <cda�nino@ncdot.�ov>; Keith Paschal (kpaschal@ncdot.�ov) <kpaschal@ncdot.�ov>;'Bob May' <BMay@wetherillen�.com>; 'David Petty' <dpetty@t�sen�ineers.com>; Cochran, Cameron <acochran@ncdot.�ov>; Lipscomb, Brian S <blipscomb@ncdot.�ov>; Jason L Dilday (jldilday@ncdot.�ov) <ildilday@ncdot.�ov>; Craig J Lee (cilee@ncdot.�ov) <cilee@ncdot.�ov>; Cox, Marissa R<mrcox@ncdot.�ov>; G Trent Beaver (tbeaver@ncdot.�ov) <tbeaver@ncdot.�ov> Cc: William S Zerman (bzerman@ncdot.�ov) <bzerman@ncdot.�ov>; Beverly G Robinson (brobinson@ncdot.�ov) <brobinson@ncdot.�ov> Subject: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018 � During our meeting today on the above referenced project, the Agencies reiterated their interest in visiting the site of the proposed bridge section of this project- R-2566BA. We are tentatively scheduling the site visit on Tuesday August 21, 2018 in the morning (the exact time will consider travel time to Boone and prevalent hot temperature in the afternoon). The Combined Field Inspection of this project is also scheduled for August 22, 2018. The site visit will precede the Combined Field Inspection to allow a discussion in the CFI meeting of the comments from the Agencies' site visit. Due to challenges of site parking, I am arranging for Car/Van pool from the NCDOT County Maintenance Yard located at 1829 NC-194, Boone, NC 28609. Both the NCDOT District Office and the County Maintenance Yard are 8 miles or 15 minutes' drive from the bridge site. Please let me know if you have any comments or concerns about the date and time by end of business tomorrow, August 9, 2018, so that I can send out the final site visit invite. Thanks Nathan N. Adima, PE Project Manager Project Management Unit - Divisions 11-14 North Carolina Department of Transportation 919 707 6210 office 919 707 6200 main nadima@ncdot.�ov <mailto:nadima@ncdot.�ov> 1000 Birch Ridge Drive Raleigh, NC 27610 1582 Mail Service Center Raleigh, NC 2699-1582 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Marella Buncick USFWS 160 Zillicoa St Asheville, NC 28801 (828) 258-3939 ext 237 fax (828) 258-5330 NOTE: This email correspondence and any attachments to and from this sender is subject to the Freedom of Information Act (FOIA) and may be disclosed to third parties.