HomeMy WebLinkAbout20190397_Site Visit on August 22, 2018_20180810Wanucha, Dave
From: Chambers, Marla J
Sent: Friday, August 10, 2018 12:11 PM
To: Adima, Nathan N; Steve Kichefski; Wanucha, Dave; Buncick, Marella; 'militscher.chris@epamail.epa.gov';
Beaver, Brian T; Dagnino, Carla S; Paschal, Keith; Bob May; David Petty; Cochran, Cameron; Lipscomb, Brian S;
Dilday, Jason L; Lee, Craig J; Cox, Marissa R; Beaver, G Trent; Slaughter, Johnathan H
Cc: Zerman, William S; Robinson, Beverly G
Subject: RE: R-2566BA Watauga River Bridge Replacement , Division 11; County: Watauga - Site visit - August 21,
2018
It appears that Lori Williams and I can both make it on the 22na
Marla
IP'��urlll� �Ill�m�i�r�ll��ur� �� II'��III':'�t�..�.. ���ur�°�liiu�����ur
II...W�Il�lid.�d. ��u���:u���d.li�u� Il:�ir��ir�u�
II'�� liilll�°�Illlii�� III'����u�ur��� ��i�r�i�r�lii��lii�u��
��� II��II::��.'ll..
��Dc� �Il��u�d.�:ir �d.ir�:�:d.
�Illl��:u��irll�:, II��u�ll� ��ir�llliu�� ����°�
Il:�liir�;��q ���'u� �� Il...liu��� ��D�...��� ����D.�
u tt��ll�li II�;: .��D�...���... � �D.��D
IVl_�.irl�..�.Ih�m�b�ir�Ca�u��wildlif�.r�irq
ncwildlife.orq
j� ,�r��"
From: Adima, Nathan N
Sent: Wednesday, August 08, 2018 2:55 PM
To: Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chambers, Marla J
<marla.chambers@ncwildlife.org>; Buncick, Marella <marella_buncick@fws.gov>;'militscher.chris@epamail.epa.gov'
<militscher.chris@epamail.epa.gov>; Beaver, Brian T<btbeaver@ncdot.gov>; Dagnino, Carla S<cdagnino@ncdot.gov>; Paschal,
Keith <kpaschal@ncdot.gov>; Bob May <BMay@wetherilleng.com>; David Petty <dpetty@tgsengineers.com>; Cochran,
Cameron <acochran@ncdot.gov>; Lipscomb, Brian S<blipscomb@ncdot.gov>; Dilday, Jason L<jldilday@ncdot.gov>; Lee, Craig J
<cjlee@ncdot.gov>; Cox, Marissa R<mrcox@ncdot.gov>; Beaver, G Trent <tbeaver@ncdot.gov>; Slaughter, Johnathan H
<hslaughter@ ncdot.gov>
Cc: Zerman, William S<bzerman@ncdot.gov>; Robinson, Beverly G<brobinson@ncdot.gov>
Subject: RE: R-2566BA Watauga River Bridge Replacement , Division 11; County: Watauga - Site visit - August 21, 2018
AI I,
Aft�r a r�consid�ration of th� trav�l tim� from Ral�igh ar�a to �oon� (about 4 hrs.), it s��ms b�tt�r to sch�dul� th� sit� visit in
th� �rnin �f � n�s ay, �a �ast 22, 2 1�. In that way it will b� cool�r for th� sit� visit, th� CFI will b� in th� aft�rnoon and
th� conv�ni�nc� of thos� trav�ling from Ral�igh ar�a to trav�l th� night b�for�.
Pl�as� I�t m� knovv your thoughts.
Thanks.
Nathan N. Adima, PE
Project Manager
Project Management Unit — Divisions 11-14
North Carolina Department of Transportation
919 707 6210 office
919 707 6200 main
u�_� d. i_m� �_� u� � d r� t.�
1000 Birch Ridge Drive
Raleigh, NC 27610
1582 Mail Service Center
Raleigh, NC 2699-1582
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
From: Adima, Nathan N
Sent: Wednesday, August 08, 2018 12:38 PM
To: Steve Kichefski <�teven..:.l.:_k%�h_e�s_ki_(c�_u_sa_ce.._a_rrn�.y.:_rn�i.l>; Wanucha, Dave <dave_:wa_n_u�ha_(c�_n_cd_e_n_r.:.�crv>; Chambers, Marla J
<m�arla.cham�k�ers(c�ncwildlife.crr >; Buncick Marella <m�arella k�uncick(c�fws. crv>; m�ilitscher.chris(c�e am�ail.e a. crv; Beaver
.................................................................................�.............................................................� , ...............................................................................,,,�......................�............ ........................................................................._..........�...................................�.........�........... ,
Brian T<k�tk�eaver(c�_n�dcrt.:.�ca.v>; 'hslaughter@ncdot.go' <hs.la_u.�_hter(c�_n�d_crt:.�ca>; Carla S Dagnino (�d_a.�n_i_ncr_..C,�_n_cdca.t.:.�crv)
<cda nincr(c�ncdcrt crv>; Keith Paschal k aschal(c�ncdcrt. crv <k aschal(c�ncdcrt. crv>;'Bob Ma '<I�If�lla (c�wetherillen ccrm�>;
................�........................,,,�.................................�........... �.....�?.................................�..................................k�.............) .....�?.................................�..................................k�............. Y .....................Y..._.........................................................�.......................
'David Petty' <d.pett.��t�s_e_n.�i_n_eers..�ca.rn�>; Cochran, Cameron <a�ca.�hra_n_..C,�_n_cdca.t:.�crv>; Lipscomb, Brian S
<�I_i.�s�ca.m��(e�_n�dcrt �ca.v>; Jason L Dilday (Illdilday(e�ncdcrt.�crv) <jldilda�v(e�ncdcrt.�crv>; Craig J Lee (ca.lee(e�_n�d_crt:.�crv)
<ca.lee(�_n�d_crt...�crv>; Cox, Marissa R<m�.rccrx(�_n�dcrt.:.�ca.v>; G Trent Beaver (tk�eaver(�_n�dcrt.:.�ca.v) <tk�eaver(�_n�dca.t...�ca.v>
.... ..
Cc: William S Zerman k�zerrn�anC�_n�dcrt �ca.v) <k�ze_r_rn�an(e�_n�d_crt:.�crv>; Beverly G Robinson (�rca.�i_n_scr_nC�n�dcrt �ca.v)
..........................................._.
<k� rcr k� i nscr n C`"�.._n�dca.t.:..�.ca.v>
..................................................� _ .
Subject: R-2566BA Watauga River Bridge Replacement, Division 11; County: Watauga - Site visit - August 21, 2018
AI I,
During our meeting today on the above referenced project, the Agencies reiterated their interest in visiting the site of the
proposed bridge section of this project- R-2566BA. We are tentatively scheduling the site visit on Tuesday August 21, 2018 in the
morning (the exact time will consider travel time to Boone and prevalent hot temperature in the afternoon). The Combined Field
Inspection of this project is also scheduled for August 22, 2018. The site visit will precede the Combined Field Inspection to allow
a discussion in the CFI meeting of the comments from the Agencies' site visit. Due to challenges of site parking, I am arranging
for Car/Van pool from the NCDOT County Maintenance Yard located at
1829 NC-194, Boone, NC 28609. Both the NCDOT District Office and the County Maintenance Yard are 8 miles or 15 minutes'
drive from the bridge site.
Please let me know if you have any comments or concerns about the date and time by end of business tomorrow, August 9,
2018, so that I can send out the final site visit invite.
Tha n ks.
Nathan N. Adima, PE
Project Manager
Project Management Unit — Divisions 11-14
North Carolina Department of Transportation
919 707 6210 office
919 707 6200 main
u�_� d. i_m� �_� u� � d r� t.�
1000 Birch Ridge Drive
Raleigh, NC 27610
1582 Mail Service Center
Raleigh, NC 2699-1582
a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`��
�V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�.
I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,