Loading...
HomeMy WebLinkAbout20060973 Ver 3_More Info Received_20090604?` l I ?e,`r/• ?? l1_'r4 CA113 V3 II&IJ 4, KELLER ENVIRONMENTAL EN 9210 TS Haymarket Lane,, Raleigh, NC FAR r4, (919)844-7437 Fax(919)844-7438 LETTER OF TRANSMITTAL DATE: June 4, 2009 TO: NC Division of Water Quality ATTENTION: Cyndi Karoly RE: Birchwood Homes WE ARE SENDING YOU THE FOLLOWING: ® Pre-construction Notification (PCN) ? Plans ? Maps ® Documents ? Other THESE ARE TRANSMITTED AS CHECKED BELOW ® For approval ® As requested ® For review & comment ® Please reply ? See below ® For your files ? Specifications ? Regular Mail ? Fed-Ex ® Delivered by KE ? Picked Up COPIES DATE DESCRIPTION 5 6-4-09 Cover Letter 5 6-4-09 Revised PCN 5 4-29-09 NCEEP Wetland Mitigation Acceptance Letter THANK YOU! Rec'd By: Signed ?? '??9 KE KELLER ENVIRONMENTAL ENVIRONMENTAL CONSULTANTS June 4, 2009 Thomas Brown US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Cyndi Karoly DWQ 401 Wetlands Unit 2321 Crabtree Blvd Raleigh, NC 27604 Re: Birchwood Homes Keller Environmental Job No. 0732 DWQ Project # 06-0973 Nashville, North Carolina Dear Mr. Brown and Ms. Karoly: On behalf of MAEVCO, LLC, thank you for assistance from your offices. We are pleased to submit the following revised information that was requested last week from email and phone communications for US Army Corps of Engineers (COE) 404 and DWQ 401 approval. Nationwide Permits (NWP) 18 & 29 will be used for these non-riparian wetland impacts. NWP 18 will be used for the detention pond wetland impact (0.028-acre) on Lot 36. NWP 29 will be used for the remaining lot and road wetland impacts. Mitigation for the 0.243-acre wetland impacts will be provided by the NCEEP in-lieu fee mitigation program. Please refer to the attached acceptance letter received from Mr. Bill Gilmore via Mrs. Kelly Williams last month. Please provide us the 404 and 401 you for your assistance with this project. clarification please feel free to contact iayOkellerenvironmental.com. Sincerely, Keller Environmental, LLC Jay Keller Principal authorizations at your earliest convenience. Thank If you should have questions or require additional me at 844-7437 (office), 749-8259 (cell) or email: Cc: Nils Joyner, P.L.S. r ,-. o?0F w A rF9Q? o -? t) Lo - tC( 3 v3 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 & 18 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Birchwood 2b. County: Nash 2c. Nearest municipality / town: Nashville 2d. Subdivision name: Birchwood 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Maevco Development LLC 3b. Deed Book and Page No. 2122; 645 3c. Responsible Party (for LLC if applicable): Claude Mayo 3d. Street address: 3051 Sunset Avenue 3e. City, state, zip: Rocky Mount, NC 27804 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Jay Keller 5b. Business name (if applicable): Keller Environmental LLC 5c. Street address: 7921 Haymarket Lane 5d. City, state, zip: Raleigh, NC 27615 5e. Telephone no.: 919-844-7437 5f. Fax no.: 919-844-7438 5g. Email address: jay@kellerenvironmental.com Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 380016947624 1 b. Site coordinates (in decimal degrees): Latitude: 35.958595 Longitude: -77.952305 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 11.20 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Sapony Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV: NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Mostly forested tract with 2 existing roads and infrastructure. A dry detention pond exists in the southwest property corner. 3b. List the total estimated acreage of all existing wetlands on the property: 2 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 linear feet 3d. Explain the purpose of the proposed project: The proposed and existing impacts to the wetland areas are necessary to complete the subdivision, thus sustaining the development of the residential areas. 3e. Describe the overall project in detail, including the type of equipment to be used: 18 residential lots and one BMP lot are proposed for Birchwood Subdivision. The existing and proposed impacts to the wetland areas are associated with one road, stormwater structure, and 3 lots. Equipment used included trackhoes, bulldozers, and other land grading equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ®Yes ? No ? Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Keller Environmental Name (if known): Jay Keller Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. June 6, 2007 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ? No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. Include the Corps Action ID Number, DWQ Project Number, application date, and dates permits and certifications were issued or withdrawn. Provide copies of previously issued permits, certifications or other useful information. Corps Action ID #200420354; DWQ Project #06-0973; please refer to the attached correspondence. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T Lot 6 ®P ? T Land Clearing / Fill Headwater ® Yes ? No ® Corps ? DWQ 0.028 Lot 8 ®P ? T Land Clearing Headwater ® Yes ? No ® Corps ? DWQ 0.017 Lot 9 ®P ? T Land Clearing Headwater ® Yes ? No ® Corps ? DWQ 0.000 (10 SF) Lot 23 ® P ? T Land Clearing / Headwater ® Yes ® Corps 020 0 Fill ? No ? DWQ . Lot 36 ®P ? T Land Clearing, Headwater ® Yes ® Corps 028 0 Fill, Excavation ? No ? DWQ . Rdway ®P ? T Land Clearing / Headwater ® Yes ® Corps 0.150 Fill ? No ? DWQ 2g. Total wetland impacts 0.243 2h. Comments: Impacted wetlands include Lots 8, 9, and 36; and roadway. NWP 18 will be used for detention pond impacts (0.028-acre) on Lot 36. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ?P?T ?Yes ? No B2 ? P ? T ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed path of Par Drive will provide access to this property from Golfers Lane. Upon Par Drive entering the property, the road was immediately curved to the east to avoid the western wetland areas. The stormwater pond on Lot 36 was strategically placed to avoid the western wetland areas and large ditch while discharging to this adjacent ditch. The pond was also placed in an area where the pre-existing flow discharged. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment fence and numerous check dams were placed in the roadside swales and large southern ditch to protect downstream water quality. Minimal grading was conducted in the pre-existing ditch in front of Lots 8 &9 and the access area to Golfers Lane. Large logging mats were used during the initial clearing and grading to avoid additional wetland impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ®Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ® Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: 0.243 acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWO 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diff use flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 17.9% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Total acreage: 11.20 acres. Impervious areas: pre-existing-0; proposed- 2.00 acres. Proposed impervious areas include 0.76 acres of roads and 1.24 acres of houses and driveways. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Town of Nashville ? Phase II 3b. Which of the following locally-implemented stormwater management programs ® NSW ? USMP apply (check all that apply): ® Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ? No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ® Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): The April 18, 2007 Notice of Violation stated that approximately 12,000 square feet of wetlands and 765 linear feet of intermittent stream channel were impacted. After subsequent site visits with Mike Horan (DWQ), Thomas Brown (COE), & Jean Manuele (COE) and other involved parties on May 17, 2007, June 6, 2007, and thereafter, it was determined that southern drainageway was an ephemeral non-jurisdictional ditch. Also, the road and adjacent areas impacts along with the stormwater pond area was determined to be approximately 0.195 acres. Attempts to minimize wetland impacts to less than 1/10`h acre were conducted while the jurisdictional determination was on-hold due to the Rapanos Supreme Court isolated wetlands moratorium. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. To the Town of Nashville WWTP. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? F-1 Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS and NC Natural Heritage Databases and Maps were consulted. No endangered species or designated critical habitat impacts are anticipated. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC Natural Heritage and South Atlantic Habitat and Ecosystem IMS Databases and Maps. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office Databases and Maps. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? The surveyor confirmed that the project is not in a FEMA floodplain area. Jay Keller 6-4-2009 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 Epste,m PROGRAM April 29, 2009 David Combs Maevco Development 3051 Sunset Avenue Rocky Mount 27804 Project: Birchwood Expiration of Acceptance: January 29, 2010 County: Nash The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. You must also comply with all other state federal or local government permits, regulations or authorizations associated with the proposed activity including SL 2008-152• An Act to Promote Compensatory Mitigation by Private Mitigation Banks This acceptance is valid for nine months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer iI (Sq. Ft.) Cold Cool Warm Riparian Non-Ri arian Coastal Marsh Impact Tar-Pamlico 03020101 0 0 0 0 0.243 0 0 0 Credits Tar-Pamlico 03020101 0 0 0 0 0.243 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N.C. Department of Environment and Natural Resources and the U.S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Valerie Mitchener at (919) 715-1973 or Kelly Williams at (919) 716-1921. Sincerely, William D. Gilmore, PE Director cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Thomas Brown, USAGE-Raleigh Ian McMillan, NCDWQ- Wetlands/401 Unit Jay Keller, agent File Not-" oar state NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net