Loading...
HomeMy WebLinkAbout20090603 Ver 1_Application_20090529 STATE OF NORTH CAROLINA DEPART MNT OF TRANSPORTATION BEVERLY EAVES PERDUE covsxxOR S?nh H, yR 2'9 ST. R0 EUGE%='49 May 14, 2009 Mr. Rob Ridings Wetlands/401 Unit NC DENR Division of Water Quality 2321 Crabtree Blvd. 090603 Raleigh, NC 27604-2260 (Seven Copies) Subject: Courtesy Copy for the use of NWP 3 and NCDWQ Certification # 3687, for the demolition and reconstruction of Bridge No. 56, SR. 1141 (Green Pasture Road) over Cokey Swamp, Edgecombe County. TIP No. BK-5105 Dear Sirs: Please find enclosed the Pre-Construction Notification for the above referenced project. The existing bridge (61-feet long) will be replaced with a new bridge of approximately 112 feet in length on the existing alignment. Traffic will use an gffsite detour during construction. There are no impacts to the buffers or waters of the U.S./State associated with this project. The new bridge will span the creek and a much larger portion of floodplain. The bridge replacement will result in a better hydraulic opening and provide for increased wildlife passage beneath the future bridge. Cokey Swamp is located in the Tar-Pamlico River Basin and is classified by the Division of Water Quality at this bridge as C, NSW. The bridge will be removed by sawing the deck and lifting it out in sections. We will excavate behind the end bents and fold them back, then remove them without dropping any components into the creek. Steel piles from the existing bridge will be cut off at the mud line or simply pulled out of the streambed by means that do not require construction equipment to get into the water. Best Management Practices for the Protection of Surface Waters and for Bridge Demolition and Removal will be strictly adhered to during the removal of the existing bridge. (252) 237-6164 x 3532 ceoggins@ncdot.gov Post Office Box 3165, Wilson, North Carolina 27895-3165 FEDERALLY-PROTECTED SPECIES AND CULTURAL RESOURCES The Fish and Wildlife Service (FWS) currently list two federally protected species for Edgecombe County (Table' 1). Table 1- Federally Protected Species of Edgecombe County Federal Status Habitat Biological Common Name Scientific Name Present Conclusion Red-cockaded Picoides borealis E N No Effect woodpecker Tar spiny mussel Elliptio steinstansana E N No effect No element occurrences are fisted on the NHP database within one mile of this crossline. During an on-site visit, no pine trees suitable for RCW foraging or nesting are near, or adjacent to the crossline Mussel survey on April 14, 2009 indicated a biological conclusion of NO EFFECT for the Tar River Spinymussel. This project is not likely to jeopardize the continued existence of any of the federally protected species listed in Edgecombe County. No sites eligible for listing on the National Register occur within the area of potential effect. This project will not affect listed or eligible historic properties. MINIMIZATION INFORMATION Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of the US, and coordination (including a pre-construction meeting) with the Division Environmental Officer. Regulatory Approvals USACE Section 404 Permit: This project has no Waters of the US impacts. NCDWO Section 401 Certification: This project has no Waters of the US/State impacts. NCDWO Buffer Rules: This project has no buffer impacts proposed. Please contact Chad Coggins at (252) 296-3532 if you have any questions or need additional information. Your time and effort are appreciated. Respectfully Yours, R.E. Grp I Division Engineer - Division 4 (252) 237-6164 x 3532 ccoggins@ncdot.gov Post Office Box 3165, Wilson, North Carolina 27895-3165 oaOF WATF19 fi) Y j r o ? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 16. Has the NWP or GP number been verified by the Corps? ? Yes ®No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ? No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ®No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: Replacement of Bridge # 56 26. County: Edgecombe 2c. Nearest municipality / town: Elm City 2d. Subdivision name: N/A 2e. NCOOT only, T.I.P. or state project no: BK-5105 42556.1.1 3. Owner Information 3a. Name(s) on Recorded Deed: N/A 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: N/A 3e. City, state, zip: N/A 3f. Telephone no.: N/A 3g. Fax no.: WA 3h. Email address: N/A Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: NCDOT 4b. Name: R.E. Greene, Division Endineer 4c. Business name (if applicable): Highway Division 4 4d. Street address: P.O. Box 3165 4e. City, state, zip: Wilson, NC 27895-3165 4f. Telephone no.: (252) 296-3501 4g. Fax no.: (252) 234-6174 4h. Email address: regreene@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): N/A 5c. Street address: N/A 5d. City, state, zip: N/A 5e. Telephone no.: N/A 5f. Fax no.: N/A 5g. Email address: N/A Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): WA Latitude: N 35.8785 Longitude: - 1b. Site coordinates (in decimal degrees): W 77.7434 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: CokeY Swamp 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Rural residential, and forested land observed in the project vicinity. 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: The purpose of this project is to replace Bridge No. 56 Over Cokey Swamp in Edgecombe County because its sufficiency rating of 26.7 out of 100 renders it structurally deficent 3e. Describe the overall project in detail, including the type of equipment to be used: This project involves the replacement of Bridge # 56, the rehabilition of the approaches to this bridge, and removal of a portion of the existing fill slope in order to open up the floodplain at this crossing. Standard road and bridge construction equipment will be used, including cranes and excavators. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / Yes ®No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ®No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ®No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version Proposed Impacts Inventory pacts Summary ! ich sections were cbelow for your project (check all that apply): r lands ? s - tributaries Buffers n Waters Pond Construction 2.Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary W1 ? P ? T ? Yes ? Corps ? No ?DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? PEI T ? Yes ? Corps ? No ? DWQ W6 ? PC] T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps-404,10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 0 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds the U.S. then individually list all open water impacts below. , the Atlantic Ocean, or any other open water of 4a. 4b. Open water Name of wterbody 4c. 4d. 4e. impact number - (if applicable) Permanent (P) or Type of impact Waterbody type Area of impact (acres) Temporary T Ot ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland number acres ( ) of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigatio n, then you MUST fill out Section D of this form. 6a. ? Neuse ®Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ? P ? T ? Yes ? No 61L Total buffer impacts 0 0 6i. Comments: Page 6 of 11 PCN Forth - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The replacement bridge has been designed so that no structural components or fill materials will be placed in the stream thalweg or the adjacent wetlands. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All construction equipment will be staged and operated from the existing roadway and associated uplands. DOT will also install sift fencing to protect the stream and wetlands adjacent to this project, and safety fencing to delineate those environmentally sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ®No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version S. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ®No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ® Yes ? No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: There is no significant increase in impervious surface associated with ? Yes ®No this project. Stormwater will be directed off bridge and diffused on disspator pad outside buffer zone 2. 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: There is not a significant increase in impervious surface associated with this project. Stormwater will be directed off bridge and diffused on disspator pad outside buffer zone 2. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs [] NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ® Other: DOT NPDES PERMIT 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federallstate/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ®No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered 'yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes ®No 5b. Have you checked with the USFWS concerning Endangered Species Act i t ? El Yes ®No mpac s Sc. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage databases and an onsite mussel survey performed by NCDOT staff indicted NO EFFECT therefore USFWS concurrance is not needed. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCNHP GIS database and NCWRC concurrence. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ®No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? An inquiry through the State Historic Preservation Office (SHPO) determined that this project would not impact any cultural or historic sites. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: Per MOA aggreement no net rise 8c. What source(s) did you use to make the floodplain determination? NC Flood Maps J a tA l?A t t' D e Applicant/Agent's Printed Name pp s gna ure gen (Agent's signature is valid only if an authorization letter from the applicant is provided) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version d n d naz ~ 135 ? 1 113 ` a . 1002 1009 141 , \ ? f.f 9 z r 1 b tt49 / 1731 148 R 1135 c n46 ? tur N -` U 2a 12 J?411?'iJGE #5 p I _ L08 1 t223 ? !? 1997 .? 1006 r te `u 1221 _ ?...., ` 1006 1224 - r ? I 1 b 1 I O LI ? i I {i ?iil d d ^. p 1130 f ? ? l O `? 1132 I 4 / ( 11{Q ? ?? V f 2 d V Cll OT DIVISION OF HIGHWAYS VICINITY EDGECOMBE COUNTY PROJECT: BK-5105 MAPS REPLACE BRIDGE '56 j?j? ON SR 1141 OVER (NOT TO SCALE) COKEY SWAMP SHEET OF 5/1/09 NORTH CAROLINA Cem J i I r '•? ? {,1„) ??? Ste, .?94 Y?ai._ ,• \ ? .I rrt+Q.-v, ? \\\ / l•"•???(3 ' }(IfJ.I? ?.'" ^?'1 1 J 1J J n I 4 ? 4 ° 1 r ` r `` _ \ i V ? BRIDGE #56 . v - .. a { z A1 \ C^m r A l r ' _ V Z -I s 1 .11 NCDOT DIVISION OF HIGHWAYS EDGECOMBE COUNTY TOPO MA C PROJECT: BK-5105 REPLACE BRIDGE A56 SCALE: 1" = 2000' ON SR 1141 OVER COKEY SWAMP SHEET OF 5/1/09 PROPERTY OWNERS NAMES AND ADDRESSES REFERENCE NO. NAMES ADDRESSES 1 ERWIN ROBBINS WILDE 2 WILLIAM LLOYD PROCTOR 2 FLOYD C. SHEARIN, JR 4 MARY B.BOEHM 4846 LAKEVIEW LANE ELM CITY, NC 27822 3224 GREEN PASTURE ROAD ROCKY MOUNT, NC 27801 3215 GREEN PASTURE ROAD ROCKY MOUNT, NC 27801 1565 GLEN EAGLES CT NASHVILLE,NC 27856 #56 EDGECOMBE BK-5105 s a 8 ° .o ;I III 11 ir< r" ae° $? sc ? I I I fi sf §« 4 ?F? I ? ?? ?8 ? ? ? 63 I I I ? rau- ° ?R I Ili 1"1? ? I ? m? I . b II? a Ra e a ? 1111 "• ss 1 si P' s? I 11 1 ? .$ I I f . _ q€ I I I I I? °?? ?? m r y ? I. I I 2= ? ' 1 `"v s s d ss x?jl?jl 1 - is yR ?. - / µ k "a II a ? 7 ?? ` ? ___ • K S 4 i 4° I ? i ° ? 1 p s Y I " I o It "E € I p ?? P m ?s3 ?x° I ~1 I it ? ?. z z ? L I °gll I \ k I I \ : I F T W w ? I 1 I ?K l ap as _ r C ? ? - ` LZ Nti00Kf~rl m O t? A t in lr '( ' ? / A ?nmm3?.. i r I ' Ij gq ?? may cjNAO I {{ I nn ? ny?rpy... CD OIDO ^ "' v y 03A c 3EV?r D z ? m ' m -1 R z y O o C? DpN D c z ` n ? mom b S m<v c o^ ? DS^ L v k NDO i° R An1^r? ? n 2 O ? n mCm ?i ZZ yrn Cl? F > ? o10 C"1 KZ y"x ? m m c? ^rrmi' I TZUc i I< P Np ib N N r <m o I D mp D9 o C y + I N #56 EDGECOMBE O BK-5105 IRM s z s = e? ? CI III ? I = I i ?"'?^_' "s?."•°s°a „» 1 I i? ' :° :z « II ?i I g ? I I I X 1 i NT ^? a < x? 1 r C ; ?8 I ? „ , 1 I` ' 1 1 I « 4S „ 1 I? L i . a ?R iI 1 I a "II's 1 ^? I $ III ° ? . I 1 ' a 1 4 ?; ?a a t' N ' „ I I I » s I 4 I I ?4 II I F f g li _ 3 al ? I I ? ¢? II 674 ro: : d c? ? a'?II I . epa P? ?. >? `311 el ? - !w ? F t 1 i o m E ?C ? G _ •_-. ? 1 1? / iF Co m i «8 S _ X •'? ? p ? D 0 n L9 ? = - _ s 2 if • A ? ' P\ al P P 1 1 ? ? L J? EI1 I - ,I : ?? O < YN ? ?S? ?. 1P m » I gar I ^I I it ? \ ? II I I • . z Imo', n - yr _? ??I I ^ I X? /? Z r\ \ 1'. PC all / n a I? I$ s Ese r j ? 1 ! JN?7 CNnZST £z ?y?o N mo v,mm3 x.. , ?? mo Damao pj p0 i° mD ?1 Dy,Zy? zD ' ? rm ' o Cy D dCl,l ? az =a ? . y ? ? mou, n ? 4 A mcp y ? ti m n i? y C rn z o z Tn £ Jp T? ma. z _F< m zm.y ffii } z .n9n ?s n n 2 __ 2 D v.y m?mz y 9nm o? a $ o SAO 18 O ? T? amF,? x n p x 1 was 3 Y Y3 °' ? ' °- N u O m?°o ' a O n?_ n r C vn _al n d Z y