Loading...
HomeMy WebLinkAbout20090458 Ver 1_Approval Letter_20090506 NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Natural Resources Dee Freeman Secretary May 6, 2009 Polk County DWQ Project No. 090458 NCSR 1520 (Landrum Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer, Y.E. Division 14 Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Selzer: You have our approval, in accordance with the attached conditions and those listed below, for the following impacts in two (2) unnamed tributaries to Collinsville Creek, for the purpose of widening NCSR 1520 (Landrum Road) in Polk County: Stream m pacts in the Broad River Basin Site Permanent Temporary Permanent Fill in Temporary Total Stream Stream Fill in Dewatering in Perennial Stream Dewatering in Impact Impacts Intermittent Intermittent (linear ft) Perennial Stream (linear ft) Requiring Stream Stream (linear ft)_ (linear ft) Mitigation linear ft linear ft Site 1 0 0 10 80 90 0 Site 2 0 0 10 85 95 - 0 Total 0 0 20 165 m s r Total Stream Permanent Impact for Project: 20 linear feet. Temporary Impacts for Project: 165 linear feet. The project should be constructed in accordance with your application dated April 17, 2009 (received April 22, 2009), including the environmental commitments made in the application letter. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification No. 3704, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify NCDWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all conditions. If SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-295-45001 FAX: 828-299-7043 Customer Service: 1-877-623-6748 Internet: www.nmateraualitv.ora An Equal Opportunity 1 Ai0rtna5ve Action Employer NorthCarolina Natul'allry Mr. J. B. Setzer, PE May 6, 2009 Page Two total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or ill the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (11) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Condition(s) of Certification: I. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 2. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. 3. Adequate sedimentation and erosion control measures must be installed and maintained on the project site to minimize sediment transport to downstream aquatic resources. Temporary cover (wheat, millet or similar annual grain) or permanent herbaceous cover shall be planted on all bare soil as soon as possible following ground disturbing activities. Erosion control mating shall be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples or wherever possible, live stakes of native trees. Straw mulch and tall fescue shall not be used in riparian areas. 4. Unless otherwise approved in this certification, placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCD WQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 5. For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr), High Quality Waters (HQW) or Water Supply I or 11 (WS-1, WS-11), stormwater shall be directed to vegetated buffer areas, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff prior to discharging directly into streams. Mowing of existing vegetated buffer areas is strongly discouraged. 6. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycanores, dogwoods, black walnut and red maple) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 7. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 8. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 9. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Mr. J. B. Setzer, P.E. May 6, 2009 Page Three 10. The use of riprap above the Normal High Water Mark shall be minimized. Any riprap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 11. Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 12. Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 14. The Pennittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 16. No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this certification. 17. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. 18. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 19. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the NCDOT Division Engineer and the on-site project manager. 20. The issuance of this certification does not exempt the Permittee forth complying with any and all statutes, rules, regulations or ordinances that may be imposed by other government agencies (i.e. local, state and federal) having jurisdiction, including but not limited to applicable buffer rules, Stonnwater management rules, soil erosion and sedimentation control requirements, etc. 21. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State or Federal law. If NCDWQ determines that such standards or laws are not being met (including failure to sustain a designated or achieved use) or that State of Federal law if being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification 22. The Pennittee shall report any violations of this certification to the Division of Water Quality within 24-hours of discovery. 21 Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certificate of Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This form shall be returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604. Mr. J. B. Setzer, P.E. May 6, 2009 Page Four if you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. /F7 cc: Mark Davis, Division 14, DEO Sincerely, ??cYLC?ZG.C-W COleen H. Sullins, Director Division of Water Quality Ed Ingle, Roadside Environmental David Baker, USACE, Asheville Field Office Transportation Permitting Unit Mike Parker, Asheville Regional Office 090458 (Setzer) NCSR 1520 (Landrum Road)