Loading...
HomeMy WebLinkAbout20181102 Ver 1_Permit Drawings_20180809DUP� N COUNTY - PPE REP�ACEMENT � JS MI JS MIT SITE l0 5 LF ( TEMPORARY C IMPACTS FOR SITE 2a 46 LF PERMANENT B STREAM IMPA( TO RELOCATIC PIPE INLET hq� NC � g3 ,r4 O �Oy SR 36 (CH CKEN NECK ROAD) 0073 PROJECT - P�AN � EW , , i � ' I � I � I � 1 � 1 � � � � � 1 � 1 � 1 � I � � � . � ppnpnc�n PiPF= M�ES NW OF JCT SR 37 i � SITE 3e 5 LF OF � � RIP RAP FILL i i I IN STREAM CHANNEL i i i i i i i i i i i i i i i i i i i i IS MIT � JS MIT �F HANNEL DEWATERING GRAPHIC SCALE 15' 0' 15' 30' SCALE 1" = 15' LEGEND ----------------------• EXISTING ROAO EOP tPER G�SI . . EXISTWG PIPE J S M I T JUR�SD�CTIONAL STREAN PROPOSED PiPE $�ET PLLE �TEMPORARY STREAM IMPACTSq DEWATERING �PERMANENT STREAM IMPACTS9 RELOCATION WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 46' Upstream to 56' Upstream Dewatering 10 2 0' Upstream to 46' Upstream Relocation 46 3 0' Downstream to 5' Downstream Rip Rap 5 4 5' Downstream to 10' Downstream Dewatering 5 51 15 Notes: