HomeMy WebLinkAbout20090135 Ver 1_DCM Permit_20090602?'err.?it ;lass
} NEW
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
L L mit
Permit ?lUr`lber
46-09
r
z
for
Y Major Development in an Area of Environmental Con ` @
pursuant to NCGS 113A-118
!UN 2 2009
Excavation and/or filling pursuant to NCGS 113-229
DENR. WATER QUALITY
1?ETLA is 27R ?'r•TER BRA"
Issued to Pullen Place Townhouses COA c/o Kerry Avant, 1645 Westbrook Plaza Drive, Winston Sa em, ,
Authorizing development in New Hanover County at 122 S. Lumina Drive, Wrightsville
Beach, NC 28480 as requested in the permittee's application dated 12/22/08 (MP-1) and
11/19/08 (MP-4), including the attached workplan drawings (3), 1 & 2of 3 dated 12/22/08 and 3 of 3 dated 1/30/09
This permit, issued on tVtgy 279 2009 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking; I• acility
1) Unless specifically altered herein, this permit authorizes the docks, piers, and other structures and
uses located in or over the water that are expressly and specifically set forth in the permit
application. No other structure, whether floating or stationary, shall become a permanent part of this
docking facility without permit modification. No non-water dependent uses of structures shall be
conducted on, in or over public trust waters without permit modification.
2) This permit authorizes a maximum of four formalized boat slips associated with the docking facility.
3) No attempt shall be made by the permittee to prevent the full and free use by the public of all
navigable waters at or adjacent to the authorized work.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2012
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
1 J`? James H. Gre7gson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
.v „n`{r.= ttv; MAh-^'YY: ,w >..4n.`e/M^,?h'P'X.`n'NY'f . ,?t... r n r v, ...n4.+..vs?..}.. .sy:v^4? `+na. '-F -G.t-...'.- i t Yin, n '>Y+.<:-.., a.nn r .. ... rn >r
Pullen Place Townhouses CO A c/o Kei ry Avant Permit #56-09 J
Page 2 of 3
r
ADDITIONAL CONDITIONS
4 z
Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not 1
exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as
measured from the bottom of the decking. d
5) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
6) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
b) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure.
9) The authorized structures shall not exceed the established Wrightsville Beach pier head line.
10) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's riparian access corridor, which is determined by
drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the water's edge.
11) In order to ensure compliance with Condition No. 9 and No. 10 of this permit, an as-built survey
showing the location and dimensions of the permitted structure, the structure in relation to the
established pierhead line, and the distance to the neighboring riparian corridors, shall be performed on
the facility, and copies of the survey shall be provided to the Division of Coastal Management, within 60
days of completion of construction.
Gazebo
12) The authorized gazebo shall not be enclosed. Any material used on the sides shall not obstruct view and
shall be permeable to air and water. Screen or wire on the sides along with benches and knee walls are
permitted. Lattice is specifically excluded from being used under this authorization.
13) The roof of the gazebo shall not be designed for second story use.
Pullen Place Townhouses COA c/o Kerry Avant
ADDITIONAL CONDITIONS
General
`i
14) The permittee understands and agrees that, if future operations by the United States r ?
r by regair.,s the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
15) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit
modification.
16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: The permittee is cautioned that this permit does not authorize the placement of tie piles in
association with the docking facility. Furthermore, due to the proximity of the AIWW, boats
utilizing the docking facility will be subject to frequent wavewash from passing vessels. The
issuance of this permit does not relieve the permittee from taking all proper steps to ensure the
integrity of the structure and the safety of moored boats. The permittee shall not hold the State
of North Carolina or the United States liable for any damage to the structure or moored boats.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
09-0135.
Permit #56-09
Page 3 of 3
r
}
s
4
r
S
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2009-00423 which was issued on 3/10/09.
BANKS CHANNEL
FLOOD
EBB
C- X 7- TZ /L) 6
rA?LL? ? y
mt-'MI V ED
DC N?,jILMINC-TON, NO
. NO
BOAT LIFT PLAN
c BEA? ?N? u
30 15 0 30
SCALE IN FEET
SOUNDINGS BASED ON MLW--O.0
CFA~^ gy &v lip &64,
WAMi a Maui i4 C --4yv(li a,.
IZZ W&jKik Old Wg,I Nb
vu/ool
Shlc 3 0? 3
cn
O
U
ct
ct O Q
M
CIS
x
a
U
_ N
r-1
O
O
? ? Cr1 ? H
CIS
x
03
w V
,;1 .. O '
e .^
X11 N
I
W
kf)
a
e
r
U
?
c C
3
0
0
a
U
U
O
Q
bA
.N
W
Pvaq3[ing , Z?
natl-3lln
u
W
0
M I
O
N
0
N
O
N
a
f
3
a
CZ
0
00
00
,
-
?
O c O
U as w
QO ;
EO -d g
c 00
O
W ? N
N
?
N
f11 .C- ,-. di" L
l I
? I I
I I
M ?" t I
U 11
I I
U
I
N
O
ofTp
z
0
n?
o
,
r
r
CD
m
~ C
o_ o N
0
a
o ?
as
Fr
N
00
o
N
O
O
N
O
cb
?>
No
z
r
J
G
0
CL
rrl
o?
0
0
CD
cr
CD
CA
0
N
CD
cr
0
z