HomeMy WebLinkAbout20181102 Ver 1_Permit Drawings_20180808DUP� N COUNTY -
PPE REP�ACEMENT
�
JS MI
JS MIT
SITE l0 5 LF (
TEMPORARY C
IMPACTS FOR
SITE 2a 46 LF
PERMANENT B
STREAM IMPA(
TO RELOCATIC
PIPE INLET
hq� NC �
g3 ,r4 O
�Oy
SR 36 (CH CKEN NECK ROAD) 0073
PROJECT - P�AN � EW
, ,
i �
' I
�
I �
I �
1 �
1 �
� �
� �
1 �
1 �
1 �
I �
� �
. � ppnpnc�n PiPF=
M�ES NW OF JCT SR 37
i � SITE 3e 5 LF OF
� � RIP RAP FILL
i
i I IN STREAM CHANNEL
i i
i i
i i
i i
i i
i i
i i
i i
i i
i i
IS MIT
�
JS MIT
�F
HANNEL
DEWATERING
GRAPHIC SCALE
15' 0' 15' 30'
SCALE 1" = 15'
LEGEND
----------------------• EXISTING ROAO EOP tPER G�SI
. . EXISTWG PIPE
J S M I T JUR�SD�CTIONAL STREAN
PROPOSED PiPE
$�ET PLLE
�TEMPORARY STREAM IMPACTSq
DEWATERING
�PERMANENT STREAM IMPACTS9
RELOCATION
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 46' Upstream to 56' Upstream Dewatering 10
2 0' Upstream to 46' Upstream Relocation 46
3 0' Downstream to 5' Downstream Rip Rap 5
4 5' Downstream to 10' Downstream Dewatering 5
51 15