HomeMy WebLinkAbout19860275 Ver 1_COMPLETE FILE_19860101
Permit Class
New STATE OF NORTH CAROLINA
Department of Natural Community Development
C e58 rc ion
XL? Mai 17'?e 1''r' utin onmental
Con
*
ExcavatiojfA a+ ' to NCGS 113-229
Permit Number 1
17-87
Issuedto_ City of Washington Dir of Public Work P.O. Box 1988, Washington, N(' 27RR9
authorizing development in Beaufort County at the Tar River, end of Washington
Street Extension as requested in the permittee's application dated 1186 i nc7 id i ng
attached plat, 1 plan view dated 10/23/86
This permit, issued on I??1 1 1 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions andnotes set forth below. Any violation of these terms may subject
permittee to,a fine,.imprisonment or civil action; or may cause the permit to be null and void.
(1) The bulkhead will be positioned no farther waterward than an average of 6
feet.;from the normal water level (NWL) elevation contour. It will not
extend farther than 10 feet waterward at any point along its alignment.
(2) All. b.ackfill mateii.als will be obtained from an_ upland source and confined
landward of the permitted bulkhead.
(3) The :fill material will. be clean and free of any pollutants except in trace
,quantities. -Metal products, organic=materials, or unsightly debris will
not be used.
(4) The,,activity will be conducted,in.such`a manner as to prevent a significant
increase in turbidity.outside'the area of construction or construction-
related;discharge..-Increases.such that the turbidity in the water body is
NTU's`_or less-are not considered significant.
NOTE: The proposed project is certified under General Water Quality Certification
No.-1272 issued on November 10, 1978, for bulkhead construction,
This 'permit -.action may be appealed by the permittee Signed by the authority of the Secretary of DNRCD and.
or other qualified persons `within twenty (20) days of the .` ' `the Chairman of the Coastal Resources Commission.
issuing date. An appeal requires resolution, prior to work
initiation or continuance, as the.case may be.
This,permit must be accessible on-site to Department
personnel when`the.project is`inspected,for.compliance:: -
Any maintenance work or project modification David W. Owens, Director
not covered . hereunder requires further Departmental Division of Coastal Management
approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31, 1990
In issuing this permit, the State of North Carolina
es that your project is consistent with the North
nt Program. Signature of Permittee
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402.1890
February 2, 1987
IN REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC087-N-007-0075
Mr. Russel M. Waters
The City of Washington
Post Office Box 1988
Washington, North Carolina 27889
Dear Mr. Waters:
Reference your application for a Department of the Army permit
to construct and backfill a bulkhead on the Tar River adjacent to -- -
Washington Street Extension, Washington, Beaufort County, North
Carolina.
Your proposal has been reviewed and found to be consistent
with the provisions and objectives of general permit No. SAWC080-
N-000-0291. Therefore, you may commence construction activity in
strict accordance with applicable State authorization and the
enclosed plan. Failure to comply with the State authorization or
conditions of the general permit could result in a violation of_
Federal law.
If any change in your work is required because of unforeseen
or altered conditions or.for any other reason, plans revised to
show the change must be sent promptly to this office and the North
Carolina Division of Coastal Management prior to performing any
such change or alteration. Such action is necessary as revised
plans must be reviewed and the authorization modified.
Questions or comments may be addressed to Mr. Ken Jolly,
telephone (919) 343-4632.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
Enclosure
-2--
with enclosure:
•' Copies Furnished.
.
Director, Atlantic Marine Center Ms. L. K. (Mike) Gantt
National Ocean Service U.S. Fish and Wildlife Service
ATTN: MOA 232X1 Post Office Box 25039
439 West York Street Raleigh, North Carolina 27611-5039
Norfolk, Virginia 23510-1114
Mr. Randy Cheek
Mr. William Mills National Marine Fisheries
Water Quality Section Service, NOAA
91vision of Environmental Pivers Island
Management Beaufort, North Carolina 28516
North Carolina Department of
Natural Resources and Mr. Charles Jones
Community Development Morehead City Regional Office
Post Office Box 27687 North Carolina Division of
Raleigh, North Carolina 27611-7687 Coastal Management
Post Office Box 769
_ Mr. William L.__Kruczynski, Chief Morehead_.City,.North Carolina 28557
Wetlands Section
Region IV Mr. David Gossett
Marine and Estuarine Branch Washington Regional Office
U.S. Environmental Protection Agency North Carolina Division of
345 Courtland Street Coastal Management
Atlanta, Georgia 30365 1424 Carolina Avenue
Post Office Box 1507
Mr. John Parker Washington, North Carolina 27889
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
.3
`I? Llr=
L.Y.Q.
PI-
i 4
i
1
' S
bj L-'
w
C?t
1
Lll
W
i
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402.1890
December 5, 1986
IN REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC087-N-007-0075
Mr. John Parker
Division of Coastal Management
North Carolina. Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Dear Mr. Parker:
RECEIVE n
IEUC 81986
Reference the application of the City of Washington for a
Department of the Army permit to construct and backfill a bulkhead
on the Tar River adjacent to Washington Street Extension,
Washington, Beaufort County, North Carolina.
The Federal agencies have completed review of the proposal as
presented by the application and your field investigation report.
We recommend that the following conditions be included in the
State authorization:
a. The bulkhead will be positioned no farther waterward than
an average of 6 feet from the normal water level (NWL) elevation
contour. It will not extend farther than 10 feet waterward at any
point along its alignment.
b. All backfill materials will be obtained from an upland
source and confined landward of the permitted bulkhead.
c. The fill material will be clean and free of any pollutants
except in trace quantities. Metal products, organic materials, or
unsightly debris will not be used.
d. The activity will be conducted in such a manner as to
prevent a significant increase in turbidity outside the area of
construction or construction-related discharge. Increases such
-2-
r
that the turbidity in the waterbody is 50 NTU's or less are not
considered significant.
Questions or comments may be addressed to Mr. Ken Jolly,
telephone (919) 343-4632.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
Copies Furnished:
Mr. William Mills
y?ater Quality Section
Division of Environmental
Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Charles Jones
Morehead City Regional Office
North Carolina Division of
Coastal Management
Post Office Box 769
Morehead City, North Carolina 28557
Ms. L. K. (Mike) Gantt
U.S. Fish and Wildlife Service
Post Office Box 25039
Raleigh, North Carolina 27611-5039
Mr. Randy Cheek
National Marine Fisheries
Service, NOAA
Pivers Island
Beaufort, North Carolina 28516
Mr. William L. Kruczynski, Chief
Wetlands Section
Region IV
Marine and Estuarine Branch
U.S. Environmental Protection Agency
345 Courtland Street
Atlanta, Georgia 30365
Mr. David Gossett
Washington Regional Office
North Carolina Division of
Coastal Management
1424 Carolina Avenue
Post Office Box 1507
Washington, North Carolina 27889
jtR-%-. d.3 - v
e°`wtTF°
State of North Carolina
Department of Natural Resources and Community Development
Division of Coastal Management
512 North Salisbury Street • Raleigh, North Carolina 27611
James G. Martin, Governor David W. Owens
S. Thomas Rhodes, Secretary Director
4 November 1986 FAST TRACK
Mr. John R. Parker, Jr., Chief
Major?P rmits 1 ocessin ection
Off ce of Coasta nagement
Raleigh, North Carolina 27611
Dear Mx. Parker:
The attached copy of an application submitted by:
City of Washington-
Applicant's Name
End of Washington Street, Tar River Beaufort County
Location of Project County
for a State permit to perform excavation and/or fill
work in coastal North Carolina and for a CAMA major develop-
ment permit...
X for a LAMA major development permit (only) ...
has been reviewed by the Field Services Section and is being forwarded
to you along with a Field Investigation Report for further application
processing including circulation to State agencies having interest
and/or jurisdiction over the subject matter which might be affected by
the project.
The recommendation of this Section is X covered on the reverse
side attached; will be forwarded later.
S'ncerely,
I&A-C J4
UOAL S
Charles S. Jones, ief
Field Services Section
CSJ:ap:3566
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293
An Equal Opportunity Affirmative Action Employer
<
DEPARTMENT OF THE ARMY
s WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
November 13, 1986
IN REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC087--N-007-0075
Mr. Russel M. Waters, Jr.
The City of Washington
Post Office Box 1988
Washington, North Carolina 27889
Dear Mr. Waters:
On February 6, 1986, we renewed general permit No. SAWC080-N-
000-0291 (enclosed), which provides Federal authorization for
construction activities that receive authorization from the State
of North Carolina.
A review of your application received November 5, 1986, for a
Department of the Army permit to construct and backfill a bulkhead
on the Tar River adjacent to Washington Street Extension,
Washington, Beaufort County, North Carolina, indicates it to be a
candidate for Federal authorization under this general permit.
Accordingly, the administrative processing of your application
will be accomplished by the North Carolina Division of Coastal
Management. Comments from Federal review agencies will be
furnished to the State.
If your application must be withdrawn from this general permit
process for any reason, you will be written and informed of its
further management. If there are no unresolved differences of
State-Federal positions or policy, the final action taken on your
application by the State will result in your receiving written
notice from us that your application has been successfully
processed under our general permit. Only after receiving such
confirmation should you begin work.
Your application, pursuant to Section 10 of the River and
Harbor Act and Section 404 of the Clean Water Act, has been
assigned No. SAWCO87-N-007-0075 and will be coordinated by Mr. Ken
Jolly. He is available to address questions or comments you may
have at telephone (919) 343-4632.
Sincerely,
Charles W. Hollis
Chief, Regulatory Branch
Enclosure
-2-
Copies Furnished (without enclosure):
Mr. John Parker
Division of Coastal Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. William Mills
Water Quality Section
,-Aivision of Environmental
Management
North Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. Charles Jones
Morehead City Regional Office
North Carolina Division of
Coastal Management
Post Office Box 769
Morehead City, North Carolina 28557
Mr. David Gossett
Washington Regional Office
North Carolina Division of
Coastal Management
1424 Carolina Avenue
Post Office Box 1507
Washington, North Carolina 27889
Ms. L. K. (Mike) Gantt
U.S. Fish and Wildlife Service
Post Office Box 25039
Raleigh, North Carolina 27611-5039
Mr. Randy Cheek
National Marine Fisheries
Service, NOAA
Pivers Island
Beaufort, North Carolina 28516
Mr. William L. Kruczynski, Chief
Wetlands Section
Marine and Estuarine Branch
Region IV
U.S. Environmental Protection Agency
345 Courtland Street
Atlanta, Georgia 30365
DIVISION OF ENVIRONMENTAL MANAGEMENT
.` WATER QUALITY SECTION
Comments concerning an application_;for State Federal CAMA Permit(s) from _4t4 C
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
This office has no objection to the issuance of the permit(s) for the proposed
project with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction or construction-
re ated discharge (increases of 25 NTU's or less are not considered
ignificant).
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a.result of the.proposed activity after a reason-
able opportunity for dilution and mixture..
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project. Such action to:
process the certification has
been initiated. Proposed
Certification will be acted on
after
The proposed project is. certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October lb,
1977, for sewer line construction 1980, for boat ramp construction.
No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
Comments concerning an application for State Federal CAMA Permit(s) from L tr
A. PERMIT:
This office cannot comment on this project until after the close of the Section
401 Certification Public Comments Period.
This office has no objection to the issuance of the permit(s) for the proposed
project with the following conditions:
That the activity be conducted in such a manner as to prevent significant
increases in turbidity outside the area of construction orconstruction-
related discharge (increases of 25 NTU's or less are.no't considered
ignificant)
That the instream turbidity not be increased by more than 50 NTU's as a
result of the proposed activity after a reasonable opportunity for dilu-
tion and mixture.
That turbidity levels in shall not be increased
by more than 10 NTU's as a result of the proposed activity after a reason-
able opportunity for dilution and mixture.
B. CERTIFICATION STATUS:
Certification is not required
for this project.
Certification is required for
this project Such action to
process the certification has
been initiated. Proposed
Certificationwill be acted on
r after
The proposed project is certified
under General Certification
A) No. 1179 issued on January 25, D) No. 1431 issued on October 16,
1977, for sewer line construction 1980, for boat ramp construction.
No. 1272 issued on November 10, E) No. 1664 issued on September 8,
1978, for bulkhead construction. 1983, for Rip-Rap Placement.
C) No. 1273 issued on November 10, F) No. 1665 issued on September 19,
1978, for discharges of liquid 1983, for incidental bridge
effluent from diked upland disposal construction.
areas.
WATER QUALITY SECTION
DIVISION OF ENVIRONMENTAL MANAGEMENT
U IJlllll?
ACTION ADD FILE ) DFCAMA40i PSWD ) FORMAT ) NRDFCAMA NEXT RCD ) 00138
ACTION ADD, ENTER THE DATA TO BE STORED I" I' D DATA
PRO= 00137 PROJ: CITY OE WATHINGTON COUNTY: BEAUFORT REGaON: 0-7
T'YPr::: CERTIFICATION RECOMME NDATION DATE,: YYMM:Dr)
404 PH: 401 R E:: Q : ISSUE: Y RECEIVED: t:• 61 i f? l
CAMA ONLY: Y GC: BULKHEADS DENY: INITIAL REPORT:
is F/C;AMA : GC: HOLD: FINAL REPORT: 8611l,-3
RECEIVING STREAM: TAR RIVER CLASS : C BASIN: TAR
COMMENTS:
SITE LOCATED AT I..:ND OF WASHINGTON ;)•r IN CITY OF WASH INGTON
PROPOSED 34 LF OF WOODEN BULKHEAD
COPIES: 1,JARO--C:I :i••2T RAi..:....MILLS....irOS E::.r._I.
RECEIVED
NOV 14 1986
WATER QUALITY SECTION
OPERATIONS BRANCH
OFFICE OF COASTAL MANAGEMENT
FAST TRACK
FIELD INVESTIGATION REPORT
1. Applicant's name City of Washington
2. Location of project site City of Washington, Washington Street, Tar River '
photo number 12-17-84, K-21
Investigation type: Dredge b Fill CAM X
4. Investigative procedure: (A) Dates of site visit 11-2-86 _
(B) Was applicant present No
5. Processing procedure: Application received 10-28-86 Office Washington
6. Site description: (A) Local Land Use Plan City of Washington
Land classification from LUP' Conservation
Development constraints identified in LUP None
(B) AEC(s) involved:
(C)
(D)
Water dependent:
Ocean Hazard
Coastal wetlands
Estuarine waters
Yes
Intended use: Public
(E) Type of waste water treatment:
Planned N/A
Estuarine shoreline
Public trust waters X
Other
No Other
Private X Commercial
Existing N/A
(F) Type of structures: Existing N/A
Planned N/A
(G) Estimated annual rate of erosion + 6' Source DCM staff observation
7. Habitat description: AREA
(A) Vegetated wetlands: Dredged Filled Other
None N/A N/A
(B) Non-vegetated wetlands:
(C) Other:
Open water + 200 sq.ft.
(D) Total area disturbed: + 200 sq.ft.
8. Project•summary The applicant is proposing to construct a 34' long bulkhead which will
average + 6' beyond the normal water level at the end of Washington Street on the
Tar River.
„,,\
Environmental settin
The project site is where Washington Street, within the city limits of Washington,
ends at the Tar River. The street is a dedicated right of way on which is located
a sewage lift station. Severe erosion is occurring at the site, which is obvious
from an erosion scarp which is within four feet of the foundation of the building.
Along the erosion scarp is located scattered riprap. No wetland vegetation is
present at the site. Bulkheads on private residential properties are located on
each side of the right of way.
Project proposal
The applicant is proposing to construct a 34' long bulkhead which will average 6'
beyond the normal water level and which will be 10' at the furthest point. The
bulkhead will be connected to two adjacent bulkheads.
Environmental impact
The project as proposed will have a minimal environmental impact. No wetland
vegetation will be excavated or filled.
David L. Gossett - Washington Office - 4 November 1986
APPLICA7ION
FOR
PERMIT TO EXCAVATE AND/OR FILL WATFR QUALITY CERTIFICATION4111 Q
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
?J ?
4Q* 98?,
Department of Administration State of North Carolina Department of the Ard
(GS 146.12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District
(GS 113-229,143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320.329)
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank.
1. Applicant Information CITY OF WASHINGTON, NORTH CAROLINA
A. Name Waters, Jr. Russell
p
bli P4.
ti
e ast trst
B. Address P.O. Box 1988 Middle
Street, P. O. Box or Route
Washington North Carolina 27889 (919)946-1033
City or Town State Zip Code Phone
11. Location of Proposed Project:
A. County Beaufort
B. 1. City, town, community or landmark Washington
2. Is proposed work within city limits? Yes X No
C. Creek, river, sound or bay upon which project is located or nearest named body of water to project
Tar River
111. Description of Project
A. I . Maintenance of existing project 2. New work - Yes
B. Purpose of excavation or fill
1. Access channel N/A length width depth
2. Boat basin N/A length width depth
3. Fill area X length 34 Ft width 9 Ft depth _ 1"-9"
4. Other N/A length width depth
C. I. Bulkhead length 34-F t Average distance waterward of MHW (shoreline) 10 Ft
2. hype of bulkhead construction (material) Treated Timber
D. Excavated material (total for project)
1. Cubic yards 0 2. Type of material
E. F ill material to be placed below MHW (see also V1. A)
1. Cubic-yards 0 2. Type of material
IV. Land Type, Disposal Area, and Construction Equipment:
A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X
B. Does the disposal area include any marshland, swamps or other wetland? Yes No X
C. Disposal Area
1. Location- Washington Street at the River
2. Do you claim title to disposal area? Yes
D. F ill material source if till is to be trucked in N/A
I . How will excavated material be entrapped and erosion controlled? Bulkhead
I . 1 ype of equipment to be used BaC oe
G. Will marshland be crossed in transporting equipment to project site? If yes, explain No
- 1
V. Intended Use of Project Area (Describe)
le. A..1. Private
*or Commercial
3. Housing Development or Industrial
4. Other. Cit Governmental
B. 1. Lot size(s) N/A
?. Elevation of 101(s) above mean high water N/A
3. Soil type and texture - N/A
4. Type of building facilities or structures N/A
5. Sewage disposal and/or waste water treatment A. Existing - N /A Planned
B. Describe
6. 'Land Classification'(circle one)[
CONSERVA
VI. Pertaining to Fill and Water Quality:
TRANSITIONAL COMMUNITY RURAL
R (See CAMA Local Land Use Plan Synopsis)
A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes_ No X
2. Type of discharge N/A
3. Location of discharge-- N/A
VII. Present rate of shoreline erosion (if known): _ 1 1/2 Ft. per year
VII I. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State
permits for
work in project area, if applicable: N/A
IX. Length of time required to complete project: 2 week
X. In addition to the completed application form, the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land.
B. Attach an accurate work plat drawn to scale on 8% X 11 " white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113-229 (d))Enter date served Letter rom adjoining land owner
D. List names and complete addresses of the riparian landowners with r attached
p operty adjoining applicant's.
Such owners have 30 days in which to submit comments to agencies listed below.
Elizabeth W.P. Sloan - 701 Short Drive, Washington, N.C. 27889
Dr. Thomas L. Speros - 123 Short Drive, Washington, N.C. 27889
X1. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolina's approved coastal management program and will be conducted in a
manner consistent with such program.
X11. Any permit issued pursuant to this application will allow only the development described in this appli-
cation and plat. Applicants should therefore describe in the application and plat all anticipated devel-
opment activities, including construction, excavation, filling, and land cWrinit.
)ATE
Applicant's Signature
Di F-82
Rev. 10i7a SEE REVERSE SIM: Fnrr Me11
0, TV
C.
_
T
9 . 4'
rrx
p
?e Q
?(TI
c.?
l
A
c
d
t
1
r ?I
a
?I
' O t
}
:t
t
0
lv
I
1710
0
I o
I
C.0
IfV
I77-
t
i
C
(Ti
?1 ?
u
IN REPLY REFER TO
Regulatory Branch
SUBJECT: File No. SAWC087-N-007-0075
Mr. William Mills
Water Quality Section
Division of Environmental Management
North Carolina Department of Natural
Resources and Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
NOV 14 1986
Dear Mr. Mills:
RECEIVED
WATER QUALITY SECTION
OPERATIONS BRANCH
Enclosed is the application of the City of Washington,
represented by Mr. Russel M. Waters, Jr., for a Department of the
Army permit and a State Water Quality Certification to construct
and backfill a bulkhead on the Tar River adjacent to Washington
Street Extension, Washington, Beaufort County, North Carolina.
Your receipt of this letter verifies your acceptance of a valid
request for certification in accordance with Section 325.2(b)(ii)
of our administrative regulations.
We are considering authorization of the proposed activity
pursuant to Section 404 of the Clean Water Act, and we have.
determined that a water quality certification may be required
under the provisions of Section 401 of the same law. A Department
of the Army permit will not be granted until the certification has
been obtained or waived.
In accordance with our administrative regulations, 60 days
after receipt of a request for certification is considered a
reasonable time for State action. Therefore, if your office has
not acted on the request by January 12, 1987, the District
Engineer will deem that waiver has occurred.
Questions or comments may be addressed to Mr. Ken Jolly,
telephone (919) 343-4632.
Sincerely,
ha a W. H lis
hie , Regulatory Branch
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
November 13, 1986
Enclosure
-2-
Copies Furnished (without enclosure):
Mr. John Parker.
Division of Coastal Management
North<Carolina Department of
Natural Resources and
Community Development
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Mr. David Gossett
Washington Regional Office
North Carolina Division of
Coastal Management
1424 Carolina Avenue
Post Office Box 1507
Washington, North Carolina 27889
APPLICATION
FOR
PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION
EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT
Department of Administration State of North Carolina Department of the Army
(GS 146-12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District
(GS 113-229, 143-215.3(a)(1), 143-215.3(c), 113A-118 (33 CFR 209.320.329)
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blink.;
CITY OF WASHINGTON, NORTH CAROLINA 'NO?? ?9
Applicant Information
A. Name Waters, Jr. Russell P4.
Bire +.-q- "f P1471.1 i P.
ast Irst Middle
B. Andress P.O. Box 1988
Street, P. O..Box or Route
Washington North Carolina 27889 (919)946-1033
City or Town State Zip Code Phone
II. Location of Proposed Project:
A. County Beaufort
B. 1. City, town, community or landmark Washington
2. Is proposed work within city limits? Yes X No
C. Creel., river, sound or bay upon which project is located or nearest named body of water to project
Tar River
III. Description of Project
A. 1. Maintenance of existing project 2. New work Yes
B. Purpose of excavation or fill
I. Access channel N/A length width depth
2. lioat basin N/A length width depth
.3. I ill area - X length 34 Ft width 9 Ft depth 1"-9"
4. Other N/A length width depth
C. 1. Bulkhead length 34 Ft Average distance waterward of MHW (shoreline) 10 Ft
2. Type of bulkhead construction (material) Treated Timber
D. Excavated material (total for project)
1. Cubic yards 0 2. Type of material
E. Fill material to be placed below MHW (see also VI. A)
1. Cubic-yards 0 2. Type of material
IV. Land Type, Disposal Area, and Construction Equipment:
A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X
B. Does the disposal area include any marshland, swamps or other wetland? Yes No X
C. Disposal Area
1. Location- Washington Street at the River
2. Do you claim title to disposal area? Yes
D. F ill material source if fill is to be trucked in N/A
I . How will excavated material be entrapped and erosion controlled? Bulkhead
I . I ype of equipment to be used BaC oe
G. Will marshland be crossed in transporting equipment to project site? If yes, explain NO
V. Intended Use of Project Area (Describe)
A. 1. Private
2. Commercial
1*1
,1- . 0.' Housing Development or Industrial
4. Other City Governmental
1. Lot size(s)
N/A
2. Elevation of lot(s) above mean high water N/A
3. Soil type and texture N/A
4. Type of building facilities or structures N/A
5. Sewage disposal and/or waste water treatment A. Existing N/A Planned
Describe
6. 'Land Classification' (circle one VELOPED TRANSITIONAL
CONSERVATI OTHER
COMMUNITY RURAL
-(See CAMA Local Land Use Plan Synopsis)
VI. Pertaining to Fill and Water Quality:
B
A. Does the proposed project involve the placement of fill materials below mean high water? Yes No X
1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project completion? Yes_ No X
2. Type of discharge N/A
3. Location of discharge N/A
VII. Present rate of shoreline erosion (if known): 1 1/2 Ft. per year
VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for
work in project area, if applicable: N/A
IX. Length of time required to complete project: 2 week
X. In addition to the completed application form, the following items must be provided:
A. Attach a copy of the deed (with State application only) or other instrument under which applicant
claims title to the affected property. OR if applicant is not claiming to be the owner of said property,
then forward a copy of the deed or other instrument under which the owner claims title plus written
permission from the owner to carry out the project on his land.
B. Attach an accurate work plat drawn to scale on 8%z X 11" white paper (see instruction booklet for
details). Note: Original drawings preferred - only high quality copies accepted.
C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or
certified mail or by publication (G.S. 113-229 (d))Enter date served Letter rom adjoining land owner
D. List names and complete addresses of the riparian landowners with r attached
p operty adjoining applicant's.
Such owners have 30 days in which to submit comments to agencies listed below.
Elizabeth W.P. Sloan - 701 Short Drive, Washington, N.C. 27889
Dr. Thomas L. Speros - 123 Short Drive, Washington, N.C. 27889
XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies
with the State of North Carolina's approved coastal management program and will be conducted in a
manner consistent with such program.
XII. Any permit issued pursuant to this application will allow only the development described in this appli-
cation and plat. Applicants should therefore describe in the application and plat all anticipated devel-
opment activities, including construction, excavation, filling, and land clearing.
DATE Jl?
Applicant's Signature
AF-32
'..
r f'
Q
( n
li
39
tiV
Z
?LT
? m
a
?
r-l
Z
Q
(? r
;'Tl
(C
V
4*ri
i
}
oil
o
:I
?S
4 '
j
177
i
a o
I ??