Loading...
HomeMy WebLinkAbout20181092 Ver 2_401 Application_20180808Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/8/2018 9:18:49 AM (Start Event) Accept by Montalvo, Sheri A 8/8/2018 11:06:34 AM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: August 13, 2018 5:00 PM 8/8/2018 9:20 AM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Moore Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Number Other: List all IWV nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply IJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express F Non -404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: O Yes O No For the record only for Corps Permit: O Yes O No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program r Yes r No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach docurrent Alma Street SD Phase 2A_DMS ILF Confirmation Letter.pdf 76.74KB FILE TYPE MUST BE FDF 1f. Is the project located in any of NC's twenty coastal counties?* f Yes r No 1h. Is the project located in a designated trout watershed?* r Yes r No Link to trout information: http://v wv.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Mike Eaker, Southeastern Soil & Environmental 1b. Primary Contact Email:* mike@southeasternsoil.com 1c. Primary Contact Phone:* (xxx)xxx-xxxx (910)822-4540 1d. Who is applying for the permit? V Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: TRI SOUTH BUILDERS, INC 2b. Deed book and page no.: DB 4655 PG 82 2c. Responsible party: (for Corporations) James W. Cadell 2d. Address Street Address PO BOX 805 Address Line 2 aty CARTHAGE Fbstal / Zip Code 28327 2e. Telephone Number: (xxx)xxx-xxxx (910)585-0475 2f. Fax Number: (XXX)XXX-XXXX 2g. Email Address:* vvescadde1175@gmail.com State / Province / Region NC Country US C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Alma Street Subdivision Phase 2A 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town: * Vass 1d. Driving directions* If it is a new project and can riot easily be found in a CPS rrapping system Please provide directions. From Main St in Vass, go northeast on N Alma Street. Go about 1/2 mile. Site is on the left (north) side of N Alma Street and western side of us Hwy 1 2. Project Identification 2a. Property Identification Number: (tax PIN or parcel ID) 951400991351 2b. Property size: (in acres) 43 2c. Project Address Street Address 336 N Alma Street Address Line 2 Oty State/ Province/ legion Vass NC Postal / Zip Code Country 28394 us 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.257723 -79.271672 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Crane Creek 3b. Water Resources Classification of nearest receiving water:* WS -III Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* The site has been timbered. Land use in the vicinity is residential and wooded. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Qick the upload button or drag and drop files here to attach document Alma St Phase 2 - USGS Topo.pdf File type must be pdf 346.88KB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach document Alma St Phase 2 - NRCS Soil Map.pdf 550.81 KB File type mast be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 10 4e. List the total estimated linear feet of all existing streams on the property: (internittent and perennial) 1320 4f. Explain the purpose of the proposed project:* The purpose is to construct a single family residential subdivision connected by a network of roads and utilities (27 Lots in Phase 2A) 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* At the proposed road crossing (W1) a 47ft long, 18" RCP @ 1.07% slope will be installed under the roadway. Water and sewer utility lines will be concurrently installed in the road right-of-way. The area will be back filled, the roadway paved,and side slopes stabilized with vegetation. The sewer line construction corridor will be excavated, the sewer line installed, the area backfilled and graded to pre -construction contours, and then re -vegetated (grasses and herbaceous plants). Typical construction equipment such as excavators, loaders, dump trucks, and graders will be utilized. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach document Alma Street Phase 2 - IMPACT PLAN.pdf 897.74KB File type must be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes f No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary C Approved r Unknown f N/A Corps AID Number: Example: SAWta-2017-99999 SAW -2016-0532 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Southeastern Soil & Environmental 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. October 19, 2016 5d1. Jurisdictional determination upload dick the upload button or drag and drop files here to attach docurrent SAW -2016-00532 JD.pdf 260.07KB File type mist be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project?* r Yes r No 7b. If yes, explain. This is Phase 2A of the subdivision, and a future 2B phase is planned Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. None of which we are aware. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): V Wetlands V Streams -tributaries ❑ Buffers F Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland* W1 -Road crossing P Nbp label (e.g. Road Crossing 1 - Culvert, Perrranent (P) or dewatering, etc) Terrporary (T) W2 -Sewer Line P Nfp label (e.g. Fbad Crossing 1 - Culvert, Permanent (P) or dewatering, etc) Terrporary (T) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.220 2g. Total Wetland Impact 0.220 2h. Comments: Headwater Forest Headwater Forest 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* A Yes Both 0.076 (404, 10) or DAR (401, (acres) other) A Yes Both 0.144 (404, 10) or DAR (401, (acres) other) The sewer line impact is due to a permanent maintenance corridor. After installation, the area will be graded to original contours and revegetated. Periodic vegetation maintenance will convert the corridor from a forested to herbaceous wetland. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name* 3e. Stream 3f. Type of 3g. Stream 3h. Impact s type* Type* Jurisdiction* width* length* S1 S1 -Sewer Line T Excavation UT to Crane Creek Intermittent Both 3 20 6 Nbp label (e.g. Fbad Orossing Fbrrrenent (F' or Fbrennial (PER or Average (linear feet) 0 1) Terrporary (T) intermttent (INT) (feet) *" All Perennial or Intermittent streams must be verified by DWR or delegated local government. 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 0 3i. Total temporarystream impacts: 20 31. Total stream and tributary impacts: 20 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Lots were configured to ensure they could be developed without wetland impacts. A culvert beneath the road will provide hydrologic connectivity between the undisturbed wetlands at the road crossing. As a low density development, stormwater flow will not be redirected to or from the wetlands (i.e. hydrologic regime will not be significantly altered). The sewer line path was adjusted to minimize length through the wetlands. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Sediment and erosion control measures will be used, such as silt fencing, to protect water quality. Construction limits will be clearly marked through wetlands. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? G Yes r No 2c. If yes, mitigation is required by (check all that apply): r- DWR rJ Corps 2d. If yes, which mitigation option(s) will be used for this project? r- Mitigation bank rJ Payment to in -lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. V Yes 4b. Stream mitigation requested: (linear feet) 0 4c. If using stream mitigation, what is the stream temperature: 4d. Buffer mitigation requested (DWR only): (square feet) 0 4e. Riparian wetland mitigation requested: (acres) 0.22 4f. Non -riparian wetland mitigation requested: (acres) 0 4g. Coastal (tidal) wetland mitigation requested: (acres) 0 4h. Comments a 1.1 ratio was chosen because the sewer line impact is a conversion from one type of wetland (forested) to another (herbaceous), and the road crossing is in a headwater wetland heavily disturbed by logging activities (vegetation removed, soil ruts). F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? f Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Project is in the Cape Fear Basin (HUC 03030004) which is not subject to Riparian Buffer Protection Rules 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * f Yes C No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes f No To look up low density requirement click here 15A NCAC 02H.1003(2) G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)? f Yes r No 2b. Is this an after -the -fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes r No 3b. If you answered "no," provide a short narrative description. This residential development is relatively small and will not likely affect regional growth patterns 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Sanitary Sewer by Moore County Public Utilities 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f Yes r No 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes f No 5g. Does this project involve bridge maintenance or removal? r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* f Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US FWS iPaC (https://ecos.fws.gov/ipac/). iPaC provided a list of federally protected species that may occur in the proposed project area and/or may be affected by the proposed project. It included the Red -cockaded Woodpecker (Picoides borealis), American Chaffseed (Schwalbea americana), and Michaux's Sumac (Rhus michauxii). No Critical Habitats were identified. NC Natural Heritage Program (ncnhp.org) Data Explorer indicates no element occurrences for federally protected species within ten miles of the project area. The site was timbered in 2016, except for a narrow streamside management zone along the intermittent stream. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Habitat Conservation National Marine Fisheries Service https://wAw.habitat.noaa.gov/protection/efh/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC State Historic Preservation Office (http://gis.ncdcr.gov/hpoweb/) 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach document Alma Street Phase 2 - Historic Properties map.pdf 624.25KB File must be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* Flood Risk Information System (http://fris.nc.gov/fris/) Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach document File must be FDF or ME Signature PT By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Mike Eaker Signature hl�x " Date Submitted: 8/8/2018 Initial Review ........................................................................................ Is this project a public transportation project?*(?) f Yes M No Change only if needed. Has this project met the requirements for acceptance in to the review process? r Yes f No BIMS # Assigned * 20181092 Version#* 2 Reviewing Office* Fayetteville Regional Office - (910) 433-3300 Select Project Reviewer* Chad Turlington:eads\ccturlington Is a payment required for this project?* r No payment required f Fee received r Fee needed - send electronic notification What amout is owed?* r $240.00 f $570.00