Loading...
HomeMy WebLinkAbout19860249 Ver 1_COMPLETE FILE_19860101F DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 January 29, 1987 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWCO86-N-010-0178 Mr. Sandy Tyner Post Office Box 10284 Southport, North Carolina 28461 --- Dear Mr. Tyner: '' 1-191TE ni l R GP Reference your application for a Department of the Army permit to construct and backfill bulkheads, excavate a boat basin and construct piers and docks on the Atlantic Intracoastal Waterway (AIWW), just east of the Oak Island Bridge, near Yaupon Beach, Brunswick County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWCO80- N-000-0291. Therefore, you may commence construction activity in strict accordance with State permit No. 136-86, including plans, integral to the State authorization, entitled "Atlantic Passage". Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 343-4467. Sincerely, Charles W. Hollis Chief, Regulatory Branch -low -2- Copies Furnished: Mr. William Mills J Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William L. Kruczynski, Chief. Wetlands Section Region IV Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Mr. Marc Bothol Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Pe t s STATE OF NORTH CAROLINA Department of Natural ,R, Community Development 1. rl fqx - Q Majat' ?e lq?ltrtnt ink Conc t n. X Excavati "? orr?aricf36r?' g')?s>! to NCGS 113-229 Issued to Sandy R. Tyner, P. 0. Box 10284, Southport, NC 28461 Permit Number 136-86 authorizing development in ,Brunswick County at AIWW adjacent to SR 1210 (Oak Island) bridge as requested in the permittee's application dated 1/23/86 including attached plats for "Atlantic Passage", sheets 1-5 of 5 w/sheet 2 dated 10/2/85, revised sheets 3 and 4 dated 5/7/86 and sheet 5 dated 11/12/85. This permit, issued on 7•//I r6 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. Site Development-General 1. (a) To mitigate for the loss of .877 acres of filled wetland (0.041 acre of regularly flooded Spartina alterniflora_ and. seasonally flooded Spartina cynosuroides marsh, 0.6G-6 -acre o irregularly flooded Juncus roemer anus an istic-lis spicata marsh, 0.55 acre of seasonally o ded only phragmites austra-l s -marsh, and 0.28 acre of submerged and intertidal sandy s ore ine an equal amount of regularly flooded marsh shall be created by excavating 0.877 acre of high ground south of building number one in the.area of the abandoned boat rail at the west end of the property. Additionally, the concrete bridge supports along the shoreline shall be removed from the marsh surface and placed in an upland location. The permittee or project agent shall meet with representatives of the COE and/or the DCM on site to discuss appropriate excavation methods before commencing this mitigation work. (b) The new wooden bulkhead must be installed prior to all major site grading This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1989 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee ?r Sa yAo. Tyner Permit #136-86. Page 2 ADDITIONAL CONDITIONS activities and follow the wetland boundary as staked by DCM field office personnel. (c) All new buildings shall be located landward of the support deadmen and cables needed for the bulkhead. (d) Plans and specifications for the water system portion of this project must be approved by the Engineering Planning Branch, Division of Health Services prior to construction. For information regarding this matter, the permittee should contact the Engineering Planning Branch at (919) 733-2460, (e) The permittee's scheme of development, of which the authorized work is a part, contemplates the presence of structures and their attendant utilities on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW). Accordingly, the permittee will be required to remove such structures and improvements at his own expense in the event that, in the judgment of the U. S. Army Corps of Engineers acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed in areas subject to easement. NOTE: The permittee is urged to contact the DCM at the Wilmington Regional Office prior to any project activity in order to review this permit and preclude any misunderstanding of conditions. NOTE:., The permittee should contact the Vector Control Branch at (919) 733-6407 regarding appropriate mosquito control measures in and around the stormwater infiltration basins. NOTE: The project site is in Flood Hazard Zone A 12. BFE is 14' for 300' from the water. All 7 buildings are affected. NOTE: An Erosion and Sedimentation control plan will be required for this project. This plan must be filed at least thirty (30) days prior to beginning any land disturbing activity. Submit this plan to the Department of Natural Resources and Community Development, Land Quality Section, 7225 Wrightsville Avenue, Wilmington, NC 28403. NOTE: In order to provide wildlife habitat and assist in stormwater control, the permittee is urged to retain as much of the native vegetation as possible and carefully select those species that are planted and used in landscaping. Sewage Treatment and Potable Water Supply 2. (a) Prior to any work under this permit, the permittee must submit to appro- priate authorizing agency plans and specifications for the sewage treatment plant and be granted authorization to construct and operate such facilities. Sa?dy"R. Tyner ADDITIONAL CONDITIONS Permit #136-86 Page 3 NOTE: Plans and specifications for the water system portion of this project must be approved by the Engineering Planning Branch, Division of Health Services prior to construction. For information regarding this matter, the permittee should contact the Engineering Planning Branch at (919) 733-2460. NOTE: Spoil disposal areas should be located at least 250 feet from potable wells to avoid contamination of drinking water sources, if on-site wells are proposed to supply the development. Marina Development-and Operation 3. (a) In order to protect juvenile shrimp populations, no excavation or filling will be permitted between April 1 and September 30 of any year without the prior approval of the Division of Coastal Management, Wilmington Field Office (256-4161). (b) The boat basin shall not extend more than 60 feet out from the mean high water (MHW) mark in order to protect nearby primary nursery habitat. (c) In order to enhance tidal flushing of the boat basin, the northern end shall be dug to -5 feet (MHW) while the southern end shall be not greater than -6.5 feet (MLW) in depth. (d) All excavated material shall be confined on high ground behind earthen dikes if a hydraulic dredge is used or behind the new bulkhead, if a clamshell dredge is used. (e) The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. (f) Prior to the occupancy of any boat slips, the permittee, will install, and maintain operational for the life of the project, a pumpout facility to serve boats with holding tanks. (g) Prior to the occupancy of any slip, the permittee will post a sign(s) indicating that a no sewage discharge policy will be enforced in the docking area. (h) This permit does not authorize fuel handling and boat repair, such as sandblasting, painting, engine overhaul, etc. (i) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage or injury to the authorized structure or work which may be caused from existing or future operations undertaken by the United States in the public interest. (j) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters on the United States. Sandy R. Tyner ADDITIONAL CONDITIONS Permit #136-86 Page 4 (k) If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U. S. Coast Guard will be installed and maintained by, and at the expense of, the permittee. (1) It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to insure the integrity of the permitted structure and the safety of moored boats from damage by wave wash. Stormwater Management 4. (a) The innovative stormwater control system shall be installed and maintained in accordance with Department guidance. The applicant shall allow depart- ment personnel to inspect the condition of the catchment basins, drain pipes, retention basins, and grassed berms, etc. on a regular basis in order to study their effectiveness. (b) Each basin shall be excavated to a depth below any confining layers such as clays or silts. (c) Catchment basins, drain pipes, and retention basins shall be periodically cleaned of any fines or debris. (d) Retention basins shall be maintained to the original size and depth. Vegetation, vehicular parking, storage, future construction, paving or other activities reducing the permeability of the basin areas from the intended use is prohibited. .(e) Retention basin dike walls shall be stabilized with vegetative cover immediately after completion to avoid erosion. (f) Bulkhead berms shall be constructed in accordance with the plans and specifications dated 11/25/85. APPLICATION FOR PERMIT 10 LXCAVAIL AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT apartment of Administration State of North Carolina Department of the Army ;5 14612) Department of Natural Resources and Community Development Corps of Engineers, Wllmin$ton District (GS 113-229,143-215.3(a)(1), 143.215.3(c), 113A-118 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. I. Applicant Information A. Name Tyner S andy R. Last First ' Middle 8. Address P. 0. Box 10284 Street, P. O. Box or Route Southport North Carolina "`28461 .919-457-6574 City or Town State Zip Code Phone 11. Location of Proposed Project: A. County Brunswick B. 1. City, town, community or landmark Near Oak Island Bridge near Yaupon Beach 2. Is proposed work within city limits? Yes No % C. Creek, river, sound or bay upon which project is located or nearest named body of water to project North side o f Atlantic Intracoastal Waterway. I11. Description of Project Bulkhead A. 1. Maintenance of existing project Basin-Docks/ 2. Newwork Docks-Bulkhead-Residential Purpose of excavation or fill tiona Development- B. 1. Access channel length width depth 2. Boat basin - length_ .3 60 ? width 60' depth 6 ' 3. Fill area Site Grading length 850' width 350' depth -4' 4. Other _ length width depth C. 1. Bulkhead length 14 0 0 ' Average distance waterward of MHW (shoreline) 0' for 8381, 60' for 545.' 2.. Type of bulkhead construction (material) Pressure treated wood D. Excavated material (total for project) 1. Cubic yards 3.000 2. Type of material Dredge spoil (sand) E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards 250 (behind bulkhead. Type of material Sand IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Does the dispersal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location Diked area in designated spoil area. 2. Do you claim title to disposal area? , y p s 0. fill material source if fill is to be trucked in Inland borrow pit_ E. How will excavated material be entrapped and erosion controlled? Diked area and approved erosion control plan. f . I ypc of equipment to be used Drag 1 in e . G Will marshland be trussed in transporting equipment to project site? If yes, explain No. 81 10/78 Use o$ Pr t Area (Describe) A: 1. Private B in - Docks. 2. Commercial T None 3. Hous(ngDevelopment orIndustrial Residential condominiums. 4, 04jtor Recreational swimming pool 8. 1. Lot size(s) N/A - Condominium project. 2. Elevation of lot(s) above mean high water 7r 3. Soil type and texture See Boring l o g s . 4. Type of building ,facilitiesorstructures 4-Story wood _frame at abgve ,elevaatti_o_* 13 MSL - /4 0 4 a;ko Pl,_ , -7 &I , 5. Sewage disposal and/or waste water treatment A. Existing Planned X S. Describe Tertiary with sand filters with off-site subsurface disposal. 6. Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' RURAL CONSERVATION OTHER (See LAMA Local t4rgl.the Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes X No _.. B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes-No X 2. Type of discharge 3. Location of discharge VII. Present rate of shoreline erosion (if known): Unknown YJII. List permit numbers and issue dates of previous Department of Army Corps of Enoinom qr St;to porrWis ff}( work In project area, if applicable: 134-80 IX. Length of tJme required to complete project: , 3 y e a r s . In addition to the completed application form, the following items must be provided; A. Attach • a coQy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of skid proporty, then forward a copy of the deed or other instrument under which the owner claims Eitie plus wrJtten permission from tho owner. to carry out the project on his land. B. Attach an accurate work plat draw-, to scale on 8j X 11 " white paper (w Instruction t poklgt fof details). Note: Original 4rawings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by (eglstered gr certified mAil or by puplication (G.S. 113-229 (d))Enter date served registered -mail on 1 1- 8- 8 5 . P l a t sent 11 - - 0. List names and Fomplete addresses of the riparian landowners with property adjoinipg apelicartt'?. Such owners have 4Q days in which to submit comments to agencies listed below. Standard Products, Odell Williams, Town of Long Beach. XI. Certification requirement: I certify that to the best of my knowledge, the proposed activity compllei with the State of North Carolinas approved coastal management program and will be conducted in a manner consistent with such program. XII. Any permit issued pursuant to this application will allow only the development described In this appli• cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. fi: Applicant's'Signature F-82 SEE REVERSE SIDL FOR MAILING INSTRUCTIONS . Io/7b IN HEPLY HEFEH TO Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 March 17, 1986 SUBJECT: File No. SAWCO86-N-010-0178 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Mills: RECEIVED MAR 18 101?86 WATER QUALITY SECTIOIN OPERATIONS BRANCH Enclosed is the application of Mr. Sandy Tyner, Post Office Box 10284, Southport, North Carolina, for a Department of the Army permit and a State Water Quality Certification to construct and backfill bulkheads, excavate a boat basin, and construct piers and docks just east4,,.of the Oak Island Bridge near Yaupon Beach, Brunswick County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorization of the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification may be required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is considered a reasonable time for State action. Therefore, if your office has not acted on the request by May 5, 1986, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 343-4467. Sincerely, h es W. lis hi , Regul ory Branch Enclosure f ? «... ?_ . Copies Furnished (without enclosure): Mr. 'John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Rob Moul Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 s APPLICATION 6 0I_ FUR '. --Q 78 PERMIT IU LXCAVAII: AND/OR FILL WATER QUALITY CERTIFICATION EASEMEPIT fN LANDS COVERL'D.BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT ,.. . 'artment of Administration State of North Ca(ollna Dspartment of the Army 14612) Department of Natural Resourcas and Community Development Corps of Englnsert, wltminsion District (GS 113.229, 143.215.3(a)(1), 143.215.3(c). 113A•114 (33 CFR 209.320.329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A In blank. Applicant Information ! ?w t ' A. Name- Tyner S andy R, Last First ' f,??)dlc F? ?? B. Address P. 0. Box 10284 Street, P. O. Box or Route Southport North Carolina °t•2.8469-457-6574 City or Town State Zip Code 'Phone Location of Proposed Project: • . A. County Brunswick 8. I. City, town, community or landmark Near Oak Island Bridge near Yaupon Beach 2. Is proposed work within city limits? Yes No X Y C. Creck, river, sound of bay upon which project is located or nearest named body of water to project North side o f Atlantic Intracoastal Waterway. Description of Project Bulkhead A. 1. Maintenance ofexistingproject Basin-Docks/ 2. Newwork Docks-Bulkhead-Residential Recrea- tiona Develop tnent B. Purpose of excavation or fill 1. Access channel length width depth 2. Boat basin length ' width 60 depth 6' 3. Fill area Site Grading length 8501 width 350 ' depth ±4v 4. Other length width depth C. 1. Bulkhead length 14001 Average distance waterward of MHW (shoreline) - O v for 838', 60' for 54 5 ' . 2. Type of bulkhead construction (material) Pressure treated wood D. Excavated material (total for project) Cubic 3.000 Dredge spoil (sand) 1. Yards 2. Type of material E. Fill material to be placed below MHW (see also VI. A) 1. Cubicyards 250 (behind bulkhead. Typeofmaterial Sand r. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes - No X 8. Does the dispusat arcs include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location Diked area in designated spoil area. 2. Do you claim title to disposal area!- y P G 0. Fill material source it fill is to be trucked in _ Inland borrow pit E. HOW will excavated material be entrapped and erosion controlled? Diked area and approved erosion control Plan. I I ypc cal cyuipment to be used Dr ag l in e . G Will marshland be trussed to trampurting equipment to project site? If yes; explain No . AilY&O,tandod Use of Pr ject Area (Describe) 1. Privaete Bta,s in - Do.cka 2.* mcrcial None 3. Vii. is Devvlopmont or Industrial Residential condominiums. ' a Recreational swimming pool 1. Lot size(s) N/A - Condominium project. 2. Elevation of lot(s) above mean high water 71 3. Sell type and texture See Boring l o g s . 4. Type,?fbuildingfacifitlesorstructures 4 y wood frame at above elevation +13 MS L. 5. Sewage disposal ind/or waste water trcaynent A. Existing Planned X 8. Describe-Tertiary with sand filters with off-site subsurface disposa i..u. ..mow .. ...?? 6. Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' RURAL, . CONSERVATION OTHER (See CAMA Local 1.4po.uso Plan Synopsis) VI. Pertaining to Fill and Water Quality: A. Does the proposed project involve the placement of fill materials below mean high water? Yes X I119 ........ B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes No X 2. Type of discharge 3. Location of discharge VII. Presort rate of shoreline erosion (if known): Unknown Vill. List permit numbers and Issue dates of previous Department of Army Corps of En$ir q qr 594to pprmlJS Rf work In project area, if applicable. 134-80 IX. Lsngth of time required to complete project. , 3 y e a r s . In addition to the completed application form, the following items must be provided; A. Attach 'a copy of the deed (with State application only) or other instrument under which applk4nt claims title to the affected property. OR If applicant is not 4laiming to be the owner of 40 prgpofty, then forward a copy pf the deed or other instrument under which the owner claims Eltle pJy1 WfJtl;?en , Permission from thf owner to carry out tjte project on his land. S. Attach an accurate work plat drawn to scale on 8%i X 11" white paper (w instruetign ppoklQt for . details). Note: Ordinal wings preferred - only high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by rctterftpr ' coriified m4ii of by puplic4cion (G.S. 113-22P (d)) Enter date served r e g i s t e r e d •m a i o n 11- 8- 8 S. P l a t - - 11 D. List names and Fomploto addresses of the riparian landowners with property adjoihips apPllcagj'>H sent Such owners hav` 49 days in which to submit comments to agencies listed below. Standard Products, Odell Williams, Town of Long Beach. 4 XL Certification requirement: I certify that to the best of my knowledge, the proposed activity compilc,4 with the Suit of North Carolinas approved coastal management program and will be conductqd in a manner consistent with such program. ;11. Any permit issued pursuant to this application will allow only the development described in this appll• cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land c wring. tY Applicant!vSignat4rc '82 SEE REVERSE SIUL FOR MAILING INSTRUCTIONS 1Q/?s DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 March 17, 1986 IN REPLY REFER TO t Regulatory Branch SUBJECT: File No. SAWC086-N-010-0178 Mr. Sandy Tyner Post Office Box 10284 Southport, North Carolina 28461 Dear Mr. Tyner: On February 6, 1986, we renewed general permit No. SAWC080-N- 000-0291 (enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received May 7, 1985, for a De.partment of the Army permit to construct and backfill bulkheads, excavate a boat basin, and construct piers and docks just east of the Oak and Bridge near Yaupon Beach, Brunswick County, North Carolina/ indicates it to be a candidate for Federal authorization unde - is general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished. to,the State. If your application must be withdrawn from this general permit process for any reason, you will be written and informed of its further management. If there are no unresolved differences of State-Federal positions or policy, the final action taken on your application by the State will result in your receiving written notice from us that your application has been successfully processed under our general permit. Only after receiving such confirmation should you begin work. Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned No. SAWC086-N-010-0178 and will be coordinated by Mr. Ernest Jahnke, telephone (919) 343-4467. He is, available to address questions or comments you may have. Sincerely, w • Charles W. Hollis Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Ms. L. K. (Mike) Gantt Division of Coastal Management U.S. Fish and Wildlife Service North Carolina Department of Post Office Box 25039 Natural Resources and Raleigh, North Carolina 27611-5039 Community Development Post Office Box 27687 Mr. Randy Cheek Raleigh, North Carolina 27611-7687 National Marine Fisheries Service, NOAH Mr. William Mills Pivers Island Water Quality Section Beaufort, North Carolina 28516 Division'of Environmental Management Mr. William L. Kruczynski, Chief North Carolina Department of Wetlands Section Natural-Resources and Marine and Estuarine Branch Community Development U.S. Environmental Protection Agency Post Office Box 27687 345 Courtland Street Raleigh, North Carolina 27611-7687 Atlanta, Georgia 30365 Mr. Charles Jones Mr. Rob Moul Morehead City Regional Office Wilmington Regional Office North Carolina Division of North Carolina Division of Coastal Management Coastal Management Post Office Box 769 7225 Wrightsville Avenue Morehead City, North Carolina 28557 Wilmington, North Carolina 28403 r IN REPLY HULK 1 V Regulatory Branch DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 May 14, 1986 SUBJECT: File No. SAWC086-N-010-0178 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: RECEIVED MAY 191986 WATER QUALITY SECTION OPERATIONS BRANCH Reference the application of Mr. Sandy R. Tyner, Atlantic Passage, for a Department of the Army permit to construct and backfill bulkheads, excavate a boat basin, and construct piers and docks on the Atlantic Intracoastal Waterway (AIWW), immediately east of the Oak Island Bridge, near Yaupon Beach, Brunswick County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization (these conditions require that the applicant redesign his project to eliminate the placement of any dredged or fill materials in waters of the United States, those waters and vegetated wetlands subject to the Corps of Engineers' regulatory jurisdiction pursuant to Section 404 of the Clean Water Act): a. The bulkheads will be aligned at or landward of any waters of the United States, including vegetated wetlands. To prevent an unintentional violation of this authorization, a representative of the Corps of Engineers will stake the Corps of Engineers' regulatory jurisdiction prior to any construction. b. All excavated materials will be confined landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded vegetated wetlands (waters of the United States). -2- c. No excavated or fill materials will be placed at any time in any vegetated wetlands or waters of the State. d. Excavation will not exceed 6 feet below the elevation of mean low water (MLW). e. The permittee's scheme of development, of which the authorized work is a part, contemplates the presence of structures and their attendant utilities on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW). Accordingly, the permittee will be required to remove such structures and improvements at his own expense in the event that, in the judgment of the U.S. Army Corps of Engineers acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed in areas subject to easement. f. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. g. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage or injury to the authorized structure or work which may be caused from existing or future operations undertaken by the United States in the public interest. h. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters on the United States. g. If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be installed and maintained by and at the expense of the permittee. h. It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to insure the integrity of the permitted structure and the safety of moored boats from damage by wave wash. The permittee will not hold the United States liable for any such damage. k -3- Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 343-4467. Sincerely, Charles W. Hollis Chief, Regulatory Branch Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Rob Moul Wilmington Regional Office North Carolina Division of Coastal Management 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Law Engineering Testing Company 616 Market Street Wilmington, North Carolina 28401 DIVISION OF ENVIRONMENTAL MANAGEMENT Water Quality Section April 9, 1986 M E M O R A N D U M TO: John Parker FROM: Bill Mills OVIA SUBJECT: Application for CAMA Permit Sandy Tyner - Atlantic Passage Brunswick County The Subject application has been reviewed for water quality impacts and the following comments are offered: 1. The project will require a 401 Certification but meets the requirements for general certification for fill behind bulkheads. 2. The stormwater management plan is sufficient to assure protection of adjacent waters from violations of coliform standards due to runoff. The following permit conditions are recommended for management of the stormwater program: a. Each basin shall be excavated to a depth below any confining layers such as clays or silts. b. Catchment basins, drain pipes, and retention basins shall be periodically cleaned of any fines or debris. C. Retention basins shall be maintained to the original size and depth. Vegetation, vehicular parking, storage, future construction, paving or other activities reducing the permeability of the basin areas from the intended use is prohibited. d. Retention basin dike walls shall be stabilized with vegetative cover immediately after completion to avoid erosion. e. -Bulkhead berms shall be constructed in accordance with the plans and specifications dated 11/25/85. - -----_. r -2- 3. Spoil disposal areas should be located at least 250 feet from potable wells to avoid contamination of drinking water sources, if on-site wells are proposed to supply the develognent. 4. It is expected that use of the proposed 58 slip mooring docks will contravene water quality standards for fecal colif_orm within the waters classified SA, due to overboard discharges of sewage, regardless of the applicant's intent to provide marine pumpout facilities. 5. It is recamnended that the project application be denied based on expected sewage discharges from the marina. Should the number of boat slip be reduced to 10 slips or less and provide marine pumpout facilities, we would not object to the permit. BM/dkb cc: Preston Howard .- +._ MEMORANDUM DATE: March 27, 1986 DIVISION OF ENVIRONMENTAL MANAGEMENT TO: Bill Mills R E C E t V E D Operations Branch FROM: A. Preston Howard, Jr. APR 04 1086 Wilmington Regional Office WATER QUALITY SECTIOltd THRU: Charles Wakild OPERATIONS BRANCH Wilmington Regiona ffice SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Sandy R. Tyner - Atlantic Passage Brunswick County The applicant proposes to develop a 7.84 acre tract of land by constructing 7, 4-story condominium structures, 140, 2 bedroom units, parking areas, swimming pool and mooring facilities for 58 boats. The project is located along the AIWW adjacent to the Oak Island Bridge, and classified SA, currently closed to shell- fishing. The project has been reviewed to determine impacts to water quality. The following comments are provided: 1. The project will require 401 certification, but should meet the conditions of a general 401 certification for bulkhead construction. 2. The stormwater management plan submitted appears to meet the objectives of the current BPJ document, by retaining the runoff generated by a 10 year-24 hour storm event on site. Retention basins beneath the building structures have been designed to contain the total volume of the runoff from all impervious surface areas comprising approximately 39% of the total site. Runoff is designed to infiltrate into the surface water aquifer within approximately 2.4 days following the 10 year-24 hour storm event. Mr..Rick Shiver, Regional Hydrologist, Wilmington Regional Office, has reviewed the information relative to the transmissivity and storage coefficient, determined by pump test data, and feels that the calculations are accurate, and the report is sound. Mr. Shiver does not expect that stormwater will contravene groundwater standards due to the stormwater infiltration systems designed. ;,In order to ensure that the stormwater retention/infiltration system remains effective, it is recommended that the following conditions be applied: a. Each basin shall be excavated to a depth below any confining layers such as clays or silts. ., .. f .. ;,: ?? _. ? ;,- i r Z Two Bill Mills March 27, 1986 b. Catchment basins, drain pipes and retention basins shall be periodically cleaned of any fines and debris. c. Retention basins shall be maintained to the original size and depth. Vegetation, vehicular parking, storage, future construction, paving or other activities reducing the permeability of the basin areas from the intended use, is prohibited. d. Retention basin dike walls shall be stabilized with vegetative cover immediately after completion, to avoid erosion. e. Bulkhead berms shall be constructed in accordance with the plans and specs dated 11/25/85. 3. It is expected that the use of the proposed 58 slip mooring docks will contravene water quality standards for fecal coliform within waters classified SA, due to overboard discharges of sewage, regardless of the applicant's intent to provide marine pumpout facilities. 4. Spoil disposal areas shall be located at least 250 feet from potable wells to avoid contamination of drinking water sources, if on-site wells are proposed to supply the development. 5. It is recommended that the proposed project application be denied based on the 58 slip residential marina. This office would not object to a proposal to limit the amount of slips to a total number of 10 slips and/or a boat ramp concept that also provides marine pump-out facilities. APH:MFW:kcs cc: DCM - Rob Moul CF WiRO 1. `. , V? .A--rLA-NrcC, *PASS a. - i L?1 NIBS 4h11f 2A u 7 sre-aw2e5 C?D lo3ao ?C+Z P.a. @J 10O°lo ; ? 4 1 -F? V6D PAjz9l NU ,4 fbiS /k2 I 64/ x ' 170 `` 2 55' x l ZO' k 3 , x I90 / 4 44' x i &o' " 5 4t' X 175' u (o 40 1 X 1715" N 7 (o2 /X I10/ u $ 44,"x &0 / (?tcPeorrnna-non,5) 101850 l?, Sao 12? l(a? 7,;040 S,oSD l0? QUO < (0,820 201640 Torte 104, ?o Jr -? @ IC OTO 10 1._-? ? "z ?ANGE- ROAD 2100 x Z2/ . S? ?Zp IUO?o S ??oL ?cA3 ??? 222j5rp s.?. x .07 s 110P. SLJP. s `3y/ $S& 49 L -3 +1,;510.4 -A-Z 4-SW-- 4Z 7 Ida' x too ?9.e ', / i. x .583' 7 " STOEM) -7 5ToAC-ve? Asa Ns 69WEAT74- 8LZ>6?S L 59!?o SCE 4 Et. l2kNCie- 11 r5 i Deep To 3.5 1, ep (P6. Co of l O? d 75 ? ?"3 5Tm ?? t C/ p?-?, 1 PI Fl L? l I CT 9S? ?2S Ctn. " 3 DAtj (&I R&Ppe " CAS l 2 _ 80 ?o a lOO c rz 5t"oeM _ VO60 W of I ZZ, 5?35 _ Y iTiOl h] 3 DA-tfS Q2 _ '?? gS 028 3 ??a?s k OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's.-name Sandy R. Tyner 2.' 'Location..of project site 'Along AIWW east of the Oak Island Bridge next to bend in Elizabeth River off of S.R. 1210. 3. Investigation type: Dredge,& Fill X CAMA X 4. Investigative procedure: (A) Dates of site visit 9/12/85 12/13/85 2/21/86 (B) Was applicant present Yes Yes No 1984 photo 10-99; Grids J&K - 8,9,10 and 11 5. Processing procedure: Application received 2/12/86 Office DCM-Wilmington 6. Site description: (A) Local Land Use Plan Brunswick County Land classification from LUP Transitional Development constraints identified in LUP None (B) AEC(s) involved: Ocean Hazard Estuarine shoreline X Coastal wetlands X Public trust waters Estuarine waters X Other (C) Water dependent: Yes X No Other (D) Intended use: Public Private X Commercial (E) Type of waste water treatment: Existing Planned Subsurface package system. (F) Type of structures: Existing Commercial fish house. Planned Seven four-story condominium buildings with 140 units and r e id n ial marina, (G) Estimated annual rate of erosion N/A Source N/A 7.' Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other Distichlis spicata & Juncus sue. 240 sf marine railway ragm es communus ±240,000 sf upland fill Spartina alterniflora 160 sf marine railway Spartina cynosuroides 1,600 sf ditch fill (B) Non-vegetated wetlands: basin bottom (mud) 21,600 sf new basin (C) Other: Estuarine Shoreline 12,150 sf buildings Upland 6.83 acres (graded) (D) Total area disturbed: 5.68 acres upland; 1.15 acres high marsh; .5 acres bplnw Muw 8. Project summary The applicant proposes to construct (140) two bedroom condominium units. contained within 7 buildings on a 7.8 acre tract where his existing fishhouse business is located due east of the N.C. 133 bridge to Oak Island. Also proposed is a 58 slip residential marina. A&L ¦ Sandy R. Tyner Page 2 9(a) SITE DESCRIPTION: The property under consideration is in Brunswick County, situated on the mainland . side of the AIWW, just east, of the N.C. 133 Bridge running to Yaupon/Caswell/Long Beach. The owner of the property operates "Sandy's Seafood", a wholesale-retail fish market which is situated on the tract. The rest of the 7.84 acre property is undeveloped and contains predominantly pine woodland acreage. A 61-16' fringe of cordgrass (Spartina alterniflora) is found along the southern boundary of the tract adjacent to the AM. Landward from this fringe is a 401-80' wide band of mixed high marsh comprised predominantly of saltgrass (Distichlis s icata); woody glasswort (Salicornia spp.); salt marsh hay (Spartina patens; and sea ox-eye (Borrichia frutescens). The outside perimeter of the high marsh has another 5'-12' wide band of giant cordgrass (Spartina cynosourides) and/or giant reed (Phragmites communius). In fact the areas shown as "Coastal Wetlands Boundary" on the plats contain some or all of these species. Some.remnant black needlerush is found near the western boundary of the tract in a previously permitted marine railway. private basin (see permit 92-79). The needlerush marsh has volunteered in the.basin at a rapid rate and can be seen on adjacent "upland" sites growing at elevations of 5'-6' (MSL). Also an old spoil area measuring 300' by 80' along the AIWW contains 24,000 sf of giant reed, myrtles and cedars. This low spot is found on the plats around the proposed pool site. The northern side of the tract has the highest elevations of 11' MSL as this contour follows the crest of a man-made dike disposal berm for the adjacent CP&L discharge canal dredging which occurred in the late 60s to.early 70s. The proposed 30,000 sf section of the site for sewage treatment and disposal is located in the N.W. corner approximately 440' from the MAW mark. A state CAMA permit (134-80). is still active for excavation worm along the eastern boundary of the tract in a portion of the Elizabeth River. An open water boat basin measuring 360' x 100' was permitted for maintenance dredging. Average depths in this basin are -2`1(MLW) and consist of mud/silt. A deteriorated bulkhead, pier, and dock with an ice house is also located along this eastern shoreline. Random depths along the edge of the AIWW channel average -5' MLW. The AIWW and this segment of the Mizabeth River are classified as S.A. The AIWW is a secondary nursery area, while most of Elizabeth River is primary nursery habitat. The adjacent :shellfish beds are closed. for harvest at this time. 9(b) PROJECT DESCRIPTION: The applicants propose to construct 7 four story condominium buildings on the site which will contain 140 two bedroom units. Approximately 42,000 gallons of waste- water will be generated by the project and will be disposed of withing an approved low pressure system north of the property. A 1,600 linear foot wooden bulkhead is proposed around 70% of the tract in order to raise the land elevations to be at or above 9' MSL under the 7 buildings. All backfill will be soil taken from 7 large retention excavations underneath the buildings. All retention/ storage basins under the buildings will be interconnected with plastic pipe. Runoff generated on the adjacent asphalt parking surfaces will flow towards four central catch basins which will then be directed into the 7 retention basins. Stormwater will be removed by infiltration and flux through the underlying surface aquifer which will lie at a minimum 1' depth below the bottom of the basins. K Sandy R. _Tyner'. :Page 3 Total impervious surfaces for the buildings equals 49,000 sf and pavement surfaces cover 85,000 sf of the tract. The pool will cover 1,800 sf and will be surrounded by wooden decking. The new boat basin to be dredged out of Elizabeth River-will measure 360' in length by 60' in width to a -6' depth. Approximately 3,000 cubic yards of dredge spoil will be removed by dragline towards the center of-the tract and be spread in a low area as illustrated on Sheet A. No excavation is proposed along the AIWW. A total of 58 open water slips are proposed by the drawings. As proposed 3 differnt slip sizes will accommodate various sized vessels. As shown there will b4(36)-22' to 25' long boats; (14)-25' to 301 long boats; and (8)-30' to 35' long vessels. All main piers and finger catwalks will be fixed. 10. ANTICIPATED IMPACTS: The project as proposed will cause the loss of approximately 1.15 acres of high- marsh wetland comprised predominantly of Phagmites and Cynosuroides situated around an old disposal area which will be filled for the pool and common areas. Also approximately 400 sf of needlerush, cordgrass, and saltgrass will be filled in at the old marine railway. Approximately 21,600 sf of relatively productive bottom will be dredged, but which is still covered-under an existing dredge and fill permit. About 6 acres of upland area will be graded and bulkheaded in order to achieve the proper gradients for the stormwater plan. Short term turbidity impacts are anticipated with the dragline activity and siltation problems could be avoided if proper sediment control measures are used. The density of the project is relatively high with a gross density of 17.8 units/ acre. With this typical density comes the associates stormwater runoff impacts. Buildings will cover 49,000 sf of land area and paved parking lots-roads will cover 85,000 sf of land with impervious surfaces. This accounts for 392 of the tract. The 75' wide "Estuarine Shoreline" has 92 coverage with impervious surfaces. A rather novel approach to stormwater management is used with the 7 interconnected underground retention basins relying on infiltration into the surface sands above the ground water level. Its success depends on groundwater analysis showing little horizontal movement of pollutants towards adjacent estuarine waters. The open water marina with 58 permanent slips may cause a degradation of adjacent water quality due to its operation. One pump out station. is identified on the plats. Approximately 382 of the slips will be large enough to moor boats with holding tanks (boats greater than 25' in length). The remainder (522) will most likely be sport fishing boats 18' to 25' in length with few holding tanks. The permanent mooring facilities do not appear to obstruct navigation. SUBMITTED BY: Rob Moul OFFICE: DCM-Wilmington DATE: March 3, 1986 a PERMIT IO EXCAVATL AND/OR FILL EASEMENT IN LANDS (;OVERED BY WATER APPLICATION FOR WATER QUALITY CERTIFICATION CAMA PERMIT FOR MAJOR DEVELOPMENT Oepartmene of Administration State of North Carolina Oepanment of the Army (GS 146-12) Department of Natural Resources and Commuafty Oevelopment Corps of Ealitn"n..Wpmlttgton Olstrict (GS 113.229, 143.215'.3(a)(1), 143.215.3(c), 113A-11S (33 CFR 209.330-329) e Please type or print-and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. I. Applicant Information A. Name Tyner S andy 13. t 8. Address Last P. 0. Box 10284 First Street, P. O. Box or Route Southport North Carolina "?2.8469.-457-6574 City or Town State Zip Code 'Phone It. Location of Proposed Project: %; , A. County Brunswick 8. 1. City, town, community or landmark Near Oak Island Bridge near Yaupon Beach 2. Is proposed work within city limits? Yes No X r C Creek, river, sound or bay upon which project is located or nearest named body of water to project North side o f Atlantic Intracoastal Waterway. 111. Description of Project Bulkhead A. 1. Mainteninceofexistingproject Basin-Docks/ 2. Newwork Docks-Bulkhead-Residential Recrea- S. Purpose of excavation or fill tiona Develop t 1. Access channel length width depth 2. Boat basin ' length `width 60 ' depth 6 3. Fill area Site Grading length 850' width 3$ fl -depth 14 t 4. Other length width depth C. 1. Bulkhead length 1'400' Average distance wamrward of MHW (shoreline) 0' for 838'. 60' for 545'. 2. Type of bulkhead construction (matuiat) pressure treated wood 0. Excavated material (tout for project) 1. Cubic yards - 3 - 00 0 2. Type of material Dredge spoil (sand) E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards - 250 (behind bulkheadk, Type of material Sand Iv. Land Type, Disposal Area, and Construction Equipment: . A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X 8. Does the disposal area include any marshland, swamps or other wetland? Yes No _X C. Disposal Area 1. Location Diked area in designated spoil area. 2. Oo you claim title to disposal area!-_ .. P s 0. F ill material source it fill is to be trucked in Inland borrow pit E. Huw will excavated material be entrapped and erosion controlled?- Diked area and approved erosion control plan. f . 1 ypc of equipment to be used _ Drag l in e . G Will marshland be cruised in transporting equipment to protect site? If yes, explain No. iI U/76 Y Use of Project Area (Describe) 1. Private B.as.in - Docks 2. Commercial None 3• Housing OevOopmon t or Industrial Residential condominiums. 4. Other Recreational swimming pool a. 1. Lotslie(s) - N/A Condominium project. 2 Elevation of 1ot(s) above mean high water 71 3• 5o11 type and texture See Boring l o g s . 4. Type 1440 01- of building facilities or structures 4-Story wood frame at above el vation-1_3 SL ( 5. Sewage disposal;nd/or wastewater treatment A. Existing Planned R e. Describe Tertiary with sand filters with off-site subsurface disposa 6• Land Classification (circle one) DEVELOPED TRANSITIONAL COMMUNITY' RURAL.. . CONSERVATION OTHER (See LAMA Local WpO.Use elan Synopsis) VI. Pertaining to Fill and Water Quality: A, Does the proposed project involve the placement of fill materials below mean high water? Yes X Nq-, 6. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the .area following project completion? Yes No X _ 2. Type of discharge 3. Location of discharge VII. Present rate of shoreline erosion (if known): Unknown Vill. Ust permit numbers and issue dates of previous Department of Army Corps of Wrier. qtr SWto "work In project area, if applicable: fR( 134 - 80 :? IX. Length of time required to complete project: 3 years. In addition to the completed application form, the following items must be provided; A. Attach 'a coey of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not 41aiming to be iht: owner of $td prgporty, then forward a copy pf tho deed or other instrument under which the owner claims Otte 1. w r",. permission from th ow ?t. f ncr to carry out lice project on his land. • a. C. 0. Attach an accurate work plat drawn to scale on Sg X 11" white paper (sex Instructs detajls), Noce: Original drawi 4n pposilQt for • ngs preferred - only high quality copies accepted. A copy of the application and plat must be served upon adjacent ri avian landowners by 1v 41 #iltem pt certified I of by pupllc4tion (G.S.113-24 (d))Enter date served r e s e r ed' •Yn a i o n Plat 1-1 - 7=757 List names and Forttplete addresses of the riparian landowners with sent property adjo4 tappllwtt4. Such owners han V days in whiO to submit comments to agencies listed below. Standard Products, Odell Williams, Town of Long Beach. G KI. Certification requirement: I certify that to the best of my knowledge. the proposed activity eompllg{ with the State of North Carolina% approved coastal management program and will be eonduetgd In a manner consistent with such program. it. Any permit issued pursuant to this application will allow only the development described In this appll- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land cjearing. - / -?? YC Applicant.vSigna(t rc -82 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS iQ/7a Ground-Water Investigation ?uw ?t Atlantic Passage Development runswick County, North Carolina e? Al. For Design Of: Storm Water Control Plan o? t? 4 v..r' November 12, 1905 Prepared for: Law Engineering Testing Co. 616 Market Street Wilmington, North Carolina 20401 Prepared by: URC, Incorporated Consulting Geologists 6t6 Market Street Wilmington, North Carolina 28401 M ATLANTIC PASSAGE DE VE LOPM E NT_ SUBJECT = STORM WATER CONTROL 1.0 SUM MARY Application is made for approval of a storm water retention system to meet the. requirements of NCNRCD for the proposed ATLANTIC PASSAGE DEVELOPMENT which would hold storm water in specially designed retention basins under the buildings of a condominium project. Although all storm water will be diverted into these basins the level of water in the basins would rise above a lower sand filled reservoir only after very heavy rainfall. The basins are capable of holding 100% of the storm water which would be collected from buildings and impervious surfaces during a 10.5 inch/day, 100 year storm. 80% of this retained water will be dispersed through infiltration to the surface aquifer within at least three days. Such rapid dispersal of storm water is due to transmissivity of the property and its proximity to discharge. All the calculations which are presented in the following report are intentionally conservative so as to provide a safety factor in dealing with storm water control. 2.0 I N rRODUCTION This report presents information about the subsurficial qualities of the property upon which the Atlantic Passage Development is proposed for construction by Mr. Sandy Tyner. The information is needed to design a drainage and retention program capable of controlling the rainfall accumulation form a "100 year" storm. The report contains sections dealing with NCNRCD requirements for the proposed development, the tests which were used to obtain the necessary information and their results, and a .discussion of the performance of the proposed storm water control system. The property under consideration is in Brunswick County, North Carolina, situated on the mainland side of the Intracoastal Waterway, just east of the State Highway 133 bridge running to Long Beach, North Carolina. The owner of the property operates Sandy's Seafood Market which is situated on the property. 3.0 RE QUIRE ME FITS 3.1 General Requirements NRCD regulations for storm water control indicate that properties with more that 10% coverage by structure or impervious surface cannot discharge storm water into sounds or other marine waters. Such developments must have a plan for total retention and dissipation of the storm water. The storm water -control plan must accommodate the rainfall from a "100 year" storm which, for coastal Brunswick County, is specifically defined as 10.5 inches of rain over a single 24 hour period and up to 4.5 inches in any one hour. Furthermore the retained water must be totally removed from the site within a reasonable amount of time to allow for subsequent rainfall. A Page 2 3.2 Site Specific Requirements The Atlantic Passage Development will include 7 condominium buildings, paved parking areas and a swimming pool which total 140040 square feet of surface coverage from which storm water must be controlled. This is roughly 40% of the 7.34 acre property. The "i00 year" accumulation volumes are: Over 24 hours - 122,535 cubic feet Over any one hour - 58,350 cubic feet 4.0 TESTS FOR REOLJIREL7 INFORMATION A 1NID RE SLJL_TS Storm water can be channeled into retention locations by appropriate engineering. Dissipation of the retained water will be effected by infiltration into the soil and surface aquifer. The rate of dissipation is a function of three factors. o The transmissivity and storage coefficient of the surface aquifer and the vadose zone o The hydraulic gradient between the retained water and the nearest zone of significant groundwater discharge. o The homogeneity of the surface aquifer. 4.1 Transmissivity and Storage Coefficient 4.1.1 Wells - The transmissivity of the surface aquifer is determined accurately only through the use of pump tests over a duration of many hours. For this purpose a fully penetrating 4 inch pumping well capable of delivering 50 gallons per minute was installed with-screens set from 20 to 30 feet below ground surface. A 2 inch observation well was installed 30 feet south of the pumping well in the direction of discharge. The screen in the observation well was also set from 20 the 30 feet below the ground surface. Both wells were drilled by Dale Todd of Wilmington, N.C. without use of mud and were fully developed before the test. 4.1.2 Tests - A 24 hour pump test was conducted by pumping the 4 inch well at a constant rate of 35 gallons per minute. Pumped water was piped away from the test site to prevent artificial recharge of the aquifer in the area of test withdrawal. Drawdown in the pumping and observation wells was measured to the nearest quarter inch on an appropriate time schedule. These time-drawdown measurements are provided in exhibit A. 4.1.3 Results - Transmissivity and storage coefficient (specific yield) values were calculated by applying Boulton's (1963) delayed yield curves and equations (as provided in Lohman, 1972) to the time drawdown observations. The test data most closely approximated a curve which would fall between a Type A curve and one with r/B = 0.1. In other words the data approximated nearly a normal Theis curve. This performance in an unconfined aquifer presumably results from the close proximity of saltwater bodies to the property and good hydrodynamic continuity between the saltwater and the test location. Using match points and Boulton's equations a tramsmissivity value of 1411 square feet/day was obtained along with a storage coefficient of .009. This transmissivity value is believable, but the storage value is unrealistic. it is known. however. that Rn,iltnn's Ot Page 3 curves are not as reliable for determination of storage coefficient as they are for trans missivity. Because r/B for the test data is close to the Standard Theis curve, Jacob's (1950) method for time-drawdown can be applied to verify transmissivity values determined from Boulton's curves and to obtain a reliable storage coefficient value. This calculation provides a transmissivity value of 1361 square feet/day and a storage coefficient of .22. It is reassuring to see the T value determined by Jacob's method is within 4% of that determined from Boulton's curves. 4.2 Hydraulic Gradients In the surface aquifer the hydraulic gradient at any one location is a function of the local water table elevation, the elevation of the water table at some point of discharge and the distance between these two points. Simply stated this is the change in elevation or head over distance. Static water levels in the pump test wells and several test borings, when plotted on detailed topographic survey of the Blue Heron Development property can be used to calculate the hydraulic gradient to what is assumed to be discharge at sealevel along the sound front of the property. In this 'takulatidh' mean sea' level (elevation 0) .is assumed to split the 'tidal range A4.0 feet) and represent waver4ge discharge elevation;=aven?thetidal cycle. In the following table information on the water table elevation at the two test wells and 4 borings, along with the hydraulic gradient to the nearest discharge is provided. The locations of these wells and borings are shown on Exhibit 2. LOCATION STATIC WATER DISTANCE TO dh/dl TABLE ELEV. DISCHARGE (feet) (feet) (feet/feet) Pumping 4.2 350 .012 Observation 3.9 320 .012 Boring 1 0.9 70 .013 Boring 2 1.1 80 .013 Boring 4 3.3 235 .014 Boring 5 1.9 140 .014 4.3 Homogeneity of the Surface Aquifer Page 4 Seven test borings were conducted at the Atlantic Passage site by Law Engineering . Testing Company at locations shown on Exhibit 2. Logs of these borings and a fence diagram of strata common to the borings are, provided in Exhibits 3 and 4. The fence diagram demonstrates some variation from boring to boring, but in general most of the property is characterized by' a similar pattern. The top of a dense sandy-silt is found at 25 to 35 feet depth overlaid by a shelly sand 10 to 20 feet thick which is in turn overlaid by loose organic sands and sandy peats. The dense sandy-silt at the bottom of the section was considered a lower confining layer of the surface aquifer for it exhibited no loss of circulation during wash drilling and made no water when a test point was placed in it. 5.0 IDISCUSSIOD.: ?DF APPROPRIATE PROJECT IDE SI GIST 5.1 Water Table Conditions The water table at the Atlantic Passage Property appears to be in equilibrium with a discharge flow from higher ground to the north. Because of the proximity of the property to a point of discharge for the surface aquifer at the waterway at mean sea level (MSL), this equilibrium profile cannot increase more than a few inches following heavy rainfall on recharge areas above the property. Thus the sands above the water table onOw the property will always be available for temporary storage of storm runoff. 5.2 Ground Storage Above the Water Table The unsaturated portion of the ground between the water table and the ground's surface (vadose zone) is a temporary storage reservoir for stormwater. Its capacity may be calculated: Storage = (Area) X (ave. Depth to Water Table) X (Porosity) Since the storage coefficient is equal to porosity in the unconfined aquifer - Storage = 7.84 acres X 43560 sq.ft/acre X 3 feet X .22 Storage = 225,396 cubic feet J Page 5 This storage capacity is 75% of the 2984i cubic feet of storm water which would fall on the whole property during a "100, year storm. However, because of the transmissivity of the surface aquifer and'the proximity of the property to the waterway, the ground would rapidly discharge as shown by Heath's (1968) equation for recession of the water table in land areas near discharge points: h = ho exp(-,K2 Tt / 4a2 S) Where: h is the final water table above discharge ho is the initial water elevation above discharge T is the transmissivity in square feet / day t is the time for ho to occur in days a is the distance to discharge S is the storage coefficient Then for an average location - Boring site 4, and assuming instantaneous saturation of the ground to its surface >3.3 feet=6.5 feet exp((-9.869X1411sq.ft./dayX t) /(4X235sq.ft.X.22)) .507 = exp(-.28 t) t = 2.4 days to return to equilibrium The same equation may be used to show the top foot of saturation would be gone in 14 hours t = .59 days The one foot loss in 14 hours should accommodate the 25% storage disparity. Thus even ignoring sheet flow off the property into the sound, the property in its natural undeveloped state should have the capacity to hold from percolation 100% of the storm water without flooding from saturation. It is important to point out that these calculations are very conservative for they assume an instantaneous saturation and do not consider the. flux to discharge from the outset of a storm. 5.3 Runoff from Altered Surface After development, the property will have a 40% coverage by buildings, swimming pool area and parking lots. The stormwater collected from these surfaces will be properly disposed of by two methods. i) Downward percolation from swales in the lows of the parking lots which will be used to collect the water and 2) infiltration at and aquifer transport away from retention basins situated under each condominium building of the development. The amount of water lost to the swales is not calculated here and is considered only as a'safety factor. In the following calculations 00% of the storm water is considered to reach the retention basins. 5.3.1 Retention - The area under each of the condominium units will be prepared as shown in cross-section on Exhibit 5. Excavation at each building site will create a windc:. :- the water table-43 feet by 140 feet, or 6000 square feet which will serve as a retention pond and groundwater discharge entry point for storm water. The excavation will be bulkheaded and surrounded by fill to an elevation 9 feet above sea level. The excavation will be refilled with 2 feet of coarse sand. whirh will cunnnr+ +ho hi,llthonrl. nl;m;nn+- N Page 6 standing water under the buildings soon after any storm, and act as an initial ,filter for the stormwater entering the aquifer. Above the sand layer an open retention pond area of 1-3.5 feet depth will be contained by the bulkheads below the elevation of the parking lot surfaces. The retention basins under each building will be hydraulically connected to the catch basins at the bottom of the parking lots so that the level of water will always be the same throughout all units. This enhances the rate of water infiltration by permitting basins with a higher Q (dispersal rate per day) to act on all retained water and not just water from a select portion of the development. The following table provides information on the configuration of the storage basins under each of the buildings and the volume of storage in each. The design is based on a maximum elevation of 7.5 feet above MSL for water in retention. The fill sand portion of the holding basin under each condominium building has been calculated assuming a 25% porosity for the coarse sand. BUILDING STATIC TOTAL ELEVATION SAND SAND OPEN OPEN NUMBER STORAGE FILL STORAGE DEPTH STORAGE X 5C1 ( ??- (feet) (feet) (feet) (feet) (tuft.) (feet) (cu ft) ? - 1 2 5 4 2 3000 3.5 21000 20,825 2 4 3 6 2 3000 1.5 9000 eg 3 4 3 6 2 3000 1.5 9000 9925 4 3 4 5 2 3000 2.5 15000 14 475 5 3 4 5 2 3000 2.5 15000 , $4,875 6 2 5 4 2 3000 3.5 21000 ? 525 7 2 5 4 2 3000 3.5 21000 ? Zv?$P?S TOTALS 21000 111,000 / (0, 076 f'' 3 21,000 + 111,000 = 132,000 cu.ft. TOTAL STORAGE This volume of storage is in excess of both the 4.5 inch rainfall for one hour (52,010 cu.ft.) and 10.5 inch rainfall (122,356 cu.ft.) for 24 hours which would be collected from the impervious surfaces and roofs during a "!00 year" storm. As a safety factor the parking lot swales would provide an additional 2500 cu.ft. of storage. 5.3.2 Ground Saturation Surrounding Retention Basin - The objective of retention will not be met if water retained breaks out of the ground's surface adjacent to the retention basins, which, during a %00 year" storm, may be holding water at a level higher than these original surfaces. Water in retention will effect a hydraulic elevation or mounding in the surrounding ground (surface aquifer). This elevation is an inverse function of the log of the distance from the retention basin times a factor related to the distance to discharge. Considering a worst case, at the back of the property, farthest from the discharge the 4 foot head in retention would cause mounding of 3 feet above the natural water table i foot outside retention and mounding of 1.75 feet 10 feet outside retention. To prevent any breakout and to provide an additional safety factor against it the fill surrounding the bulkhead at the base of the condominiums will be several feet above the maximum water retention level, graded in an apron configuration to be higher than Page 7 mounding would ever occur. This fill will be ground taken from the-retention excavations, _ and compacted somewhat to reduce its conductivity. 5.3.3 Rate of Dispersion From Retention = Although transmissivity for the surface aquifer at the Atlantic Passage property is only moderate, the flux of water away from retention will be high due to proximity of a zone of discharge and the strong hydraulic gradient which will form with any increase in head. Two formulae have been used to develop independent estimates of the time required for dispersal of retained storm water: DARCY'S FORMULA Q=KA dh/dl where: Q is the quantity of water over a time period K is the hydraulic conductivity A is the cross-section area through which flow occurs dh/dl is the hydraulic gradient This is the same as: Q=TW dh/dl where: T is the transmissivity W is the width of the cross-section of flow dh/dl is the hydraulic gradient Although the. head may be higher the following calculations assume a constant head of 2 feet above the equilibrium water table position. This is the elevation of the sand layer in the retention basins and the hydraulic condition which would be in force when the standing water in the retention basins will disappear. Moreover it is a value which may be safely assumed for any water standing higher than 2 feet in the retention basins. The higher head which would actually be in place after 10.5 inches of rain would cause even a greater rate of flow than reported here, thus, these calculations are conservative. The following table contains values and calculations of Darcy's formula using these calculations from which a total exfiltration rate may be estimated. In the table the FRONT value is the length parallel to discharge. BUILDING TRANS. FRONT dh dl 0 NUMBER (sf/day) (feet) (feet) (feet) (cf/day) 1 1140 140 4 120 6584 2 1140 120 6 200 5926 3 1140 147 6 295 4218 4 1140 110 5 200 4233 5 1140 140 5 115 8588 6 1140 140 4 45 17559 7 1140 120 4 100 6773 TOTAL 0 per day 53881 cu.ft. .' Page 8 After 10.5 inches of rain the 7 retention basins would have 101,356 cu.ft. of stormwater above the sand layer if filled instantaneously. At .a dispersal rate of 53 881 tuft./day while water is,. above.•the sand layer, Darcy.'s equation-.indicates 1.9 days would be required for "the standing.water to be removed to the level of the sand. This calculation is conservative for it considers flux to occur in only one direction, and does not consider higher heads which might occur during the early part of retention. Also it does not consider the immediate flux which would occur at the outset of the storm. HEATH'S FORMULA: Applying Heath's formula, as presented in section 4.2, to the same conditions: h = ho exp(-1(2 Tt/4a2S) The following table contains values and calculations of Heath's formula using these calculations from which a total enfiltration rate may be estimated at each individual retention pond. The values of "t" presented have not been integrated fore the whole system, but rather are presented individually giving a range of'time which would be required for water in the retention ponds to fall below the level of the sand under the condominium units. Again the calculation is conservative for a minimum head level at the sand's surface has been used. BUILDING h ho a t t NUMBER (feet)) (feet) (feet) (days) (hours) 1 2 4 120 .63 15 2 4 2 200 1.02 24 3 4 6 295 2.22 53 4 3 5 200 1.29 31 5 3 5 115 .42 10 6 2 4 45 .08 2 7 2 4 100 .43 10 Thus, Heath's method indicate the standing water would fall below the sand layer of the retention basins some time between 2 and 52 hours depending on the distance of the condominium unit from the Intracoastal waterway. It is reassuring to see these time estimates are in a similar range to those predicted by use of Darcy's formula. Presumably neither of these methods provides exact information about the actual removal rates of storm water from the retention basins by infiltration and flux through the surface aquifer, rather they give times which bracket an actual time requirement. This is somewhere between i and 3 days for the standing water to fall below the sand surface in the retention systems. This, it seems, should be an allowable time for recovery considering the unusual climatological event which would cause the stormwater problem in the first place. November 4,085 ?,? •`t??:,t,,:?. Respectfully submitted `' ' ''=• :- C, Incorporated . ? Charles F. Stehman, Ph.D. ?'•,,'J .?`? Hydrologist , ?''•••t,r,•••••?• -i-- S x W-1I 1 4 ? J o 4 J a 0 ? u l Y o }- N `l M a: 7:2 d Y?1 %n p o ? V W N s ¢ • AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County 0 ya?iaa-r11-n_o. Location; Pgmped well no.. Average Q -- Klan r = C M-72 Date Hour t (min) tf (min) t/t' Depth to water s (unad- 'usted) Adjust- ment As sf (ad- justed) Q (gpm) Remarks Q,a $?07 1 40 /IS a ? r 3 S ?o ` L O 30 35 v ? 5 0? ?v q s ss y? vo ? v I aD ao.? 4 ? ??I x ? AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Observation well no. Location: pumped well no. Average Q can r= ft. .2 Date Hour t (min) ti (min) t t# Depth to water s` (unad- •usted) Adjust- ment As s1 (ad- justed) Q (gpm) Remarks O o ?c? a 00 ? 25 o O$ o ? 07• O o •. 00 ?1 J J .S• ? ? J f1 c vo ?? vo v o v o ., i o v "6 OU J0 s 4 7 F?. ?? v i (• vv 7 c?3 d aB a o- $ AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Observation well no. 40 - I:ocation: Pumped well no. 7 Average Q gpm r= _ ft. r2 r County Loca'tioa: 1 AQUIFER-TEST DESIGN, UIiSI:R\'.1TinK, A,?_I 'ALy$IS Observation well no. Average Q gpm r= [t. rZ-_ Date Hour t• (min) ti (min) • t/t' Depth to - water'- s (unad- 'usted) Adjust- ment As s'. (ad-. justed) Q (gpm) Remarks 0_5 5 -' v 3 7-1 G.? " G s ??o ? r /L) i 3- 7 J 5 ?5 v 1 AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Observation well no.? _ Location: Pumped well no. Average Q gpm r ft. r2 _ Da te Hour t (min) d (min) t/t' Depth to water s (unad- •usted) Adjust- meat As si (ad- justed) (gpm) Remarks cJ'? S 0 0 .Z 00 o Ff 3 Oo DO ?J C) c UJ 711 v v vo oD t? D v 171 01 OU , / r 00 P4 tAl '?v a 61 i-jiv 4: dA) v ov o?? ?o -gyp a _, ""k AQUIFER-TEST. DI:SIG\, OBSERVATION, AND DATA ANALYSIS County Observation well no. Location: Pumped well no. Average Q _ Rpm r= ft. r2. Da te Hour t (min) d (min) t/t' Depth to water s (unad- 'usted) Adjust- meat 0s s? (ad- justed) (gpm) Remarks v X_ 6" d du '?7a J::" )- )- I --? 4 - ?x 1i7 t} t ? ' TEST FOR I NCG F:;t ECORD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 20 30 50 0 .0 Very loose dark brown SC clayey fine to medium SAND 1-0-0 18 with local pockets of soft clay. 1-0-0 2 5.5 Very soft black fine sandy PT 8.0 PEAT. 0-0-0 18 V 1-1-1 18 ery loose black silty fine SM SAND. 12.0 ------------------ Firm to loose olive fine to SP medium SAND and shell f 7-10-11 ib ragments. 10-5-4 13 22.0 ------------------ Loose dark gray silty fine SM SAND. 0-3-2 18 27.0 ------------------ Very loose to loose dark SC gray clayey -Fine to,coarse SAND d 1-1-1 18 an shell fragments with 2"-3" lenses of soft ray clay. 4-3-5 18 37.0 Stiff gray CLAY with thin CH lenses of sand. 10-6-9 18 JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-1 7-23-85 LAW ENC I IVEER I NG TEST I MGi COMPANY PAGE 1 OF 2 TEST 1BQFZ I "C3 RECORD DEPTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0 10 2030 50 42.0, 50.0 BLOWS PER REC. SIX IN. (IN.) S7'??? « eN Very dense light gray silty fine to medium SAND and SM 18-28-33 18 shell fragments with cemented pieces. 507-0" 0 Boring terminated at 50.0'. Note: Samples wet below 1.0'. SU ?? JOB NUMBER BORING NUMBER DATE PAGE 2 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-1 7-23-85 LAW EN CC I NEEFZ I NG TEST I NCG COMPANY ti TEST SOR I NG F?ECORD DrEPTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0.0 '-11.0 17.0 22.0 27.0 N. 32.0 37.0 0 10 2030 50 BLOWS PER REC. SIX IN. (IN.) Very soft dark gray silty CL CLAY with large amount of 4 1 0-0-0 18 organic fibers. 0-0-0 0 (,j U ?- (8 0-0-0 0 0-0-0 0 Firm olive fine to medium SP SAND and shell fragments. 6-10-14 18 ------------------ Firm gray silty fine SAND. SM 10-9-12 16 Very loose gray silty fine S - M SAND with local pockets of EC 4-1-1 18 soft gray clay. - - - ------ - -- -- -- - - - -- Soft gray silty CLAY with --- CL some fine sand and shell 0-0-3 18 fragments. Firm gray clayey fine to SC medium SAND with lenses of 6-5-6 18 soft gray clay. ------------------- Dense gray fine to medium SP SAND. 22-15-16 12 JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-2 7-26-85 LAW EIVC I NEER I NC TEST I P4 CB COMPANY PAGE 1 OF 2 TEST IBsE3F;t I N(3 F;t ECOF;t D • A DEOTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0 10 2030 50 42.0 43.0 BLOWS PER REC. SIX IN. (IN.) T]cN5E: 5,4 )rte SP ---------------- Hard drilling-No sample. Boring terminated at 43.0'. REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS FOB NUMBER 30RING NUMBER )ATE 'AGE 2 OF 2 J47285-0980 B-2 7-26-85 LAW E-=N3 I NEE=-Ft I NCG TEST I P4 CS C:MMF='ANY TEST HBO Ft I NG E;t ECClRD DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.)_ (FT.) (BLOWS/FT.) SIX IN. (IN.) O 10 2030 50 0.0 3.0 5.5 8.0 20.0 A Loose light gray fine to SP medium SAND. 2-4-5 16 Very soft gray silty CLAY CL 0-0-1 18 with large amount of organic fibers. ---------------- SM 1-0-1 18 Very loose black silty fin SAND with some organic 2-3-6 18 fibers. SM -------------- -- Very loose to firm dark SP gray to olive fine to 3-1-1 18 medium SAND with some silt and shell fragments. 4-11-15 16 Boring terminated at 20.0'. JOB NUMBER BORING NUMBER DATE PAGE 1 OF 1 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-3 LAW P4 C3 I NEEi;Z I P4 CS 7-23-65 TEST I P4 CS CC7MPANY R DEtPTH (FT.) 0.0 3.0 5.5 8.0 17.0 22.0 27.0 37.0 . TEST 3B i7R I M(3 RECORD DESCRIPTION ELEVATION PENETRATION (FT.) (BLOWS/FT.) REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER 347285-0980 BORING NUMBER B-4 DATE 7-26-85 0 10 2030 50 BLOWS PER REC. SIX IN. (IN.) Soft gray and tan silty CH CLAY. 3-2-1 10 Very loose dark brown silty SM O-O-O 18 fine SAND with large amount of organic fibers. ---------------- 4-3-4 18 Loose black silty fine SAN with some organic fibers. 4-4-6 16 SM -------- - - ------ Firm to loose brown fine SP SAND with some silt. SM 2-1-2 18 - - - - - - - - - - - - - - - - - - - - Dense gray fine SAND. ----- SP 13-18-20 18 ------------------ Very loose gray silty fine S_M SAND with pockets of soft SC 2-1-2 18 gray clay. ------------------ Firm gray fine to medium SP SAND and shell fragments 6-7-5 18 with small pockets of clay. 10-8-9 18 L Very stiff gray silty CLAY CH with thin sand seams. 5-6-23 18 LAW ENG I NEEFZ I NC3 TEST I MCG COMF='ANY PAGE 1 OF 2 DEPTH (FT.) TEST ]aMF;Z I NG FtECOF;t D DESCRIPTION ELEVATION PENETRATION (FT.) (BLOWS/FT.) 0 10 2030 50 42.0 45.0 BLOWS PER REC. SIX IN. (IN.) S-F C.C-Al C4 Dense light gray silty fine to medium SAND and shell SM 4 028-23-27 18 fragments. Boring terminated at 45.0'. JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-4 7-26-85 LAW ENC3 I NEEF;Z I NG TEST I NG COMF='ANY PAGE 2 OF 2 DEPTH (FT.) O.C 3 .. C 8.C 17.0 22.0 27.0 37.0 TEST 19MFR I M(3 F;t ECOF;t D DESCRIPTION ELEVATION PENETRATION (FT.) (BLOWS/FT.) 0 10 2030 50 BLOWS PER REC. SIX IN. (IN.) Firm gray fine SAND. SP 5-7-5 10 Very soft dark gray silty CL 1-1-1 2 CLAY with large amount of organic fibers. 0-0-0 L'4-op 1B 8 Loose brown fine SAND.. SP 2-3-6 18 Note: Trace of organic fibers at 10.0'. 4-4-2 18 - - - - - - - - - - - - - - - - - - - - Dense olive fine to medium ---- SP SAND. 12-17-15 16 Very soft gray fine sandy CL CLAY. 1-1-1 18 Loose to firm gray clayey CH fine SAND. b-6-2 18 3-3-10 18 L Stiff gray silty CLAY with CH thin sand lenses. 5-9-20 18 JOB NUMBER BORING NUMBER DATE PAGE 1 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-5 LAW ENG I NEEF;Z I NG 7-24-85 TEST I P4 ca COMPANY DEPTH (FT.) 0.0 5.5 8.0 12.0 22.0 30.0 TEST HBCIFr I P4 ca- F;z ECC F:P- DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (BLOWS/FT.) SIX IN. (IN.) n 10 2030 50 Firm to loose brown fine SAND. SP ee", 6-7-7 .s-2-1 12 10 Loose black silty fine SAND ------------------ Firm brown fine SAND. SM SP 4-4-4 6-7-8 16 12 - - - - - - - - - - - - - - Firm olive fine SAND and shell fragments.- - --- SP 0-5-7 18 10-14-15 16 ------------------ Dense gray fine to medium SAND and shell fragments. SP 12-14-19 14 10-15-17 18 Boring terminated at 30.0'. JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-6 7-24-85 LAW 1="C3 I NF=F=F=t I NG 'T E ST I N G C O M P A "Y PAGE 1 OF 1 DEPTH (FT.) 0.0 3.0 5.5 8.0 ti 32.0 TEST' JB Of:;t I N(3 FtECOFt1D DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 2030 50 Loose brown fine SAND. SP 5-2-2 6 Very soft dark gray silty CL 0-0-0 18 CLAY with some fine sand µ nd organic fibers. 1\ SM 7 ---------------- 4 0 0-0- 18 Very loose black silty f in SAND with large amount 4-8-10 15 j organics. Loose to firm brown to SP olive and gray fine SAND 6-10-12 18 with traces of silt and shell fragments. 8-8-6 12 6-6-3 10 8-7-8 18 - - - - - - - - - - - - - - - - - - - - Firm to dense gray fine to SP medium SAND with isolated 7-b-10 18 1/2 to 1.0" clay seams. 10-14-17 18 JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-7 7-25-85 L A W EN G I N S ER I N G 'T'EST I NG COMPANY PAGE 1 OF 2 DEPTH (FT.) TEST 3BMF;Z I NG F2ECOF;Zn DESCRIPTION ELEVATION PENETRATION (FT.) (BLOWS/FT.) 0 10 2030 50 42.0 43.0 BLOWS PER REC. SIX IN. (IN.) DENSc ?r1?: r ---------------- SP Hard drilling-No sample. ,. Boring terminated 43.0'. JOB NUMBER BORING NUMBER DATE PAGE 2 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-7 LAW I=-- P4 CC I P4 E-= F:;.' 1 P4 CS 7-25-85 TEST I P4 C3 COMF=:'ANY , T S ' d h a T '7 M ? V Q w J ' VL ? r 1 C c ? . ' ` J V J f / Iy ? J •fl ' ti i 0 H x W ? L v LAW ENGINEERING TESTING COMPANY 150 Division Drive P.O. Box 278, Wilmington, NC 28402 PHONE: (919) 343-0226 TO: Mike Williams Date: March 7, 1986 Dept. of Envirohmental Management-obName: Atlantic Passage North Carolina Dept. of Natural Resources and LETCO Job No.: K 473-85-0980 Community Development Your Job No.: Gentlemen: We are sending you W ."attached ? under separate cover, the following items: ? concrete test report ? laboratory test results ? field density reports ? report draft ? record of daily activities ? These are transmitted as checked below: ? for information ? for approval sent at your request ? for your review and comment REMARKS: Mike - These are the revisions and clarifications we discussed yesterday. Also please recognize that our calculations in the narrative were based on a 100 year storm, thus there is an increased margin available for storm water calculations. 0A . 7&? Copies to: Signed: Charles P. Stehman 477-48 URG,Incc,rporated Ground-Water Investigation At Atlantic Passage Development Brunswick County, North Carolina For Design Of: Storm Water Control Plan R c ,., November 12, 1985 e: r Prepared for: Law Engineering Testing Co. 616 Market Street Wilmington, North Carolina 20401 Prepared by: URC, Incorporated Consulting Geologists 616 Market Street Wilmington, North Carolina 28401 ATLAl\ITIC PASSACrE L}E VE LOFM E N r SUBJECT = STORM WATER CONTROL i.0 SUM MARY Application is made for approval of a storm water retention system to meet the requirements of NCNRCD for the proposed ATLANTIC PASSAGE DEVELOPMENT which would hold storm water in specially designed retention basins under the buildings of a condominium project. Although all storm water will be diverted into these basins the level of water in the basins would rise above a lower sand filled reservoir only after very heavy rainfall. The basins are capable of holding 100% of the storm water which would be collected from buildings and impervious surfaces during a 10.5 inch/day, 100 year storm. 80% of this retained water will be dispersed through infiltration to the surface aquifer within at least three days. Such rapid dispersal of storm water is due to transmissivity of the property and its proximity to discharge. All the calculations which are presented in the following report are intentionally conservative so as to provide a safety factor in dealing with storm water control. 2.0 I 1\i TR OI3LJC7rI O 1\I This report presents information about the subsurficial qualities of the property upon which the Atlantic Passage Development is proposed for construction by Mr. Sandy Tyner. The information is needed to design a drainage and retention program capable of controlling the rainfall accumulation form a "i00 year" storm. The report contains sections dealing with NCNRCD requirements for the proposed development, the tests which were used to obtain the necessary information and their results, and a discussion of the performance of the proposed storm water control system. The property under consideration is in Brunswick County, North Carolinas situated on the mainland side of the Intracoastal Waterway, just east of the State Highway 133 bridge running to Long Beach, North Carolina. The owner of the property operates Sandy's Seafood Market which is situated on the property. 3.0 REC3UIRE ME FITS 3A General Requirements NRCD regulations for storm water control indicate that properties with more that 10% coverage by structure or impervious surface cannot discharge storm water into sounds or other marine waters. Such developments must have a plan for total retention and dissipation of the storm water. The storm water control plan must accommodate the rainfall from a "i00 year" storm which, for coastal Brunswick County, is specifically defined as 10.5 inches of rain over a single 24 hour period and up to 4.5 inches in any one hour. Furthermore the retained water must be totally removed from the site within a reasonable amount of time to allow for subsequent rainfall. Page 2 3.2 Site Specific Requirements The Atlantic Passage Development will include 7 condominium buildings, paved parking areas and a swimming pool which total 140,040 square feet of surface coverage from which storm water must be controlled. This is roughly 40% of the 7.04 acre property. The "100 year" accumulation volumes are: Over 24 hours - 122,535 cubic feet Over any one hour - 53,350 cubic feet 4.0 TESTS FOR FR EG?_UIREID I N F OR M .6,1710 i RN ID RESULTS Storm water can be channeled into retention locations by appropriate engineering. Dissipation of the retained water will be effected by infiltration into the soil and surface aquifer. The rate of dissipation is a function of three factors. o The transmissivity and storage coefficient of the surface aquifer and the vadose zone o The hydraulic gradient between the retained water and the nearest zone of significant groundwater discharge. o The homogeneity of the surface aquifer. 4.1 Transmissivity and Storage Coefficient 4.1.1 Wells - The transmissivity of the surface aquifer is determined accurately only through the use of pump tests over a duration of many hours. For this purpose a fully penetrating 4 inch pumping well capable of delivering 50 gallons per minute was installed with screens set from 20 to 30 feet below ground surface. A 2 inch observation well was installed 30 feet south of the pumping well in the direction of discharge. The screen in the observation well was also set from 20 the 30 feet below the ground surface. Both wells were drilled by Dale Todd of Wilmington, N.C. without use of mud and were fully developed before the test. 4.1.2 Tests - A 24 hour pump test was conducted by pumping the 4 inch well at a constant rate of 35 gallons per minute. Pumped water was piped away from the test site to prevent artificial recharge of the aquifer in the area of test withdrawal. Drawdown in the pumping and observation wells was measured to the nearest quarter inch on an appropriate time schedule. These time-drawdown measurements are provided in exhibit A. 4.1.3 Results - Transmissivity and storage coefficient (specific yield) values were calculated by applying Boulton's (1963) delayed yield curves and equations (as provided in Lohman, 1972) to the time drawdown observations. The test data most closely approximated a curve which would fall between a Type A curve and one with r/B = 0A. In other words the data approximated nearly a normal Theis curve. This performance in an unconfined aquifer presumably results from the close proximity of saltwater bodies to the property and good hydrodynamic continuity between the saltwater and the test location. Using match points and Boulton's equations a tramsmissivity value of 1411 square feet/day was obtained along with a storage coefficient of .009. This transmissivity value is believable, but the storage value is unrealistic. It is known, however, that Boulton's Page 3 curves are not as reliable for determination of storage coefficient as they are for transmissivity. Because r/B for the test data is close to the Standard Theis curve, Jacob's (1950) method for time-drawdown can be applied to verify transmissivity values determined from Boulton's curves and to obtain a reliable storage coefficient value. This calculation provides a transmissivity value of 1361 square feet/day and a storage coefficient of .22. It is reassuring to see the T value determined by Jacob's method is within 4% of that determined from Boulton's curves. 4.2 Hydraulic Gradients In the surface aquifer the hydraulic gradient at any one location is a function of the local water table elevation, the elevation of the water table at some point of discharge and the distance between these two points. Simply stated this is the change in elevation or head over distance. Static water levels in the pump test wells and several test borings, when plotted on detailed topographic survey of the Blue Heron Development property can be used to calculate the hydraulic gradient to what is assumed to be discharge at sealevel along the sound front of the property. In this calculation mean sea level (elevation 0) is assumed to split the tidal range (4.0 feet) and represent an average discharge elevation over the tidal cycle. In the following table information on the water table elevation at the two test wells and 4 borings, along with the hydraulic gradient to the nearest discharge is provided. The locations of these wells and borings are shown on Exhibit 2. LOCATION STATIC WATER DISTANCE TO dh/dl TABLE ELEV. DISCHARGE (feet) (feet) (feet/feet) Pumping 4.2 350 .012 Observation 3.9 320 .012 Boring 1 0.9 70 .013 Boring 2 1.1 80 .013 Boring 4 3.3 235 .014 Boring 5 1.9 140 .014 Page 4 4.3 Homogeneity of the Surface Aquifer Seven test borings were conducted at the Atlantic Passage site by Law Engineering Testing Company at locations shown on Exhibit 2. Logs of these borings and a fence diagram of strata common to the borings are provided in Exhibits 3 and 4. The fence diagram demonstrates some variation from boring to boring, but in general most of the property is characterized by a similar pattern. The top of a dense sandy-silt is found at 25 to 35 feet depth overlaid by a Shelly sand 10 to 20 feet thick which is in turn overlaid by loose organic sands and sandy peats. The dense sandy-silt at the bottom of the section was considered a lower confining layer of the surface aquifer for it exhibited no loss of circulation during wash drilling and made no water when a test point was placed in it. 5.0 DISCUSSION 'F .4-.PPR0PRI.4TE PROJECT =}E SI C7N 5.1 Water Table Conditions The water table at the Atlantic Passage Property appears to be in equilibrium with a discharge flow from higher ground to the north. Because of the proximity of the property to a point of discharge for the surface aquifer at the waterway at mean sea level (MSL), this equilibrium profile cannot increase more than a few inches following heavy rainfall on recharge areas above the property. Thus the sands above the water table on the property will always be available for temporary storage of storm runoff. 5.2 Ground Storage Above the Water Table The unsaturated portion of the ground between the water table and the ground's surface (vadose zone) is a temporary storage reservoir for stormwater. Its capacity may be calculated: Storage = (Area) X (ave. Depth to Water Table) X (Porosity) Since the storage coefficient is equal to porosity in the unconfined aquifer - Storage = 7.34 acres X 43560 sq.ft/acre X 3 feet X .22 Storage = 225,396 cubic feet Page 5 This storage capacity is 75% of the 2981821 cubic feet of storm water which would fall, on the whole property during a "100 year" storm. However, because of the transmissivity of the surface aquifer and the proximity of the property to the waterway, the ground would rapidly discharge as shown by Heath's (1968) equation for recession of the water table in land areas near discharge points: h = ho exp(=1(2Tt / 4a2 S) Where: h is the final water table above discharge ho is the initial water elevation above discharge T is the transmissivity in square feet / day t is the time for ho to occur in days a is the distance to discharge S is the storage coefficient Then for an average location - Boring site 4, and assuming instantaneous saturation of the ground to its surface 3.3 feet=6.5 feet exp((-9.869X141isq.ft./dayX t) /(4X235sq.ft.X.22)) .507 = exp(-.23 t) t = 2.4 days to return to equilibrium The same equation may be used to show the top foot of saturation would be gone in 14 hours t = .59 days The one foot loss in 14 hours should accommodate the 25% storage disparity. Thus even ignoring sheet flow off the property into the sound, the property in its natural undeveloped state should have the capacity to hold from percolation 100% of the storm water without flooding from saturation. It is important to point out that these calculations are very conservative for they assume an instantaneous saturation and do not consider the flux to discharge from the outset of a storm. 5.3 Runoff from Altered Surface After development, the property will have a 40% coverage by buildings, swimming pool area and parking lots. The stormwater collected from these surfaces will be properly disposed of by two methods. i) Downward percolation from swales in the lows of the parking lots which will be used to collect the water and 2) infiltration at and aquifer transport away from retention basins situated under each condominium building of the development. The amount of water lost to the swales is not calculated here and is considered only as a safety factor. In the following calculations 100% of the storm water is considered to reach the retention basins. 5.3.1 Retention - The area under each of the condominium units will be prepared as shown in cross-section on Exhibit S. Excavation at each building site will create a winder: :r: the water table 43 feet by 140 feet, or 6000 square feet which will serve as a retention pond and groundwater discharge entry point for storm water. The excavation will be bulkheaded and surrounded by fill to an elevation 9 feet above sea level. The excavation will be refilled with 2 feet of coarse sand, which will support the bulkhead, eliminate Page 6 standing water under the buildings soon after any storm, and act as an initial filter for the stormwater entering the aquifer. Above the sand layer an open retention pond area of 1-3.5 feet depth will be contained by the bulkheads below the elevation of the parking lot surfaces. The retention basins under each building will be hydraulically connected to the catch basins at the bottom of the parking lots so that the level of water will always be the same throughout all units. This enhances the rate of water infiltration by permitting basins with a higher Q (dispersal rate per day) to act on all retained water and not just water from a select portion of the development. The following table provides information on the configuration of the storage basins under each of the buildings and the volume of storage in each. The design is based on a maximum elevation of 7.5 feet above MSL for water in retention. The fill sand portion of the holding basin under each condominium building has been calculated assuming a 25% porosity for the coarse sand. BUILDING STATIC TOTAL ELEVATION SAND SAND OPEN OPEN NUMBER STORAGE FILL STORAGE DEPTH STORAGE (feet) (feet) (feet) (feet) (cu.ft.) (feet) (CM 0 1 2 5 4 2 3000 3.5 21000 2 4 3 6 2 3000 1.5 9000 3 4 3 6 2 3000 1.5 9000 4 3 4 5 2 3000 2.5 15000 5 3 4 5 2 3000 2.5 15000 6 2 5 4 2 3000 3.5 21000 7 2 5 4 2 3000 3.5 21000 TOTALS 21000 111,000 11 21,000 + 111,000 = 132,000 cu.ft. TOTAL STORAGE This volume of storage is in excess of both the 4.5 inch rainfall for one hour (52,010 cu.ft.) and 10.5 inch rainfall (122,356 cu.ft.) for 24 hours which would be collected from the impervious surfaces and roofs during a %00 year" storm. As a safety factor the parking lot swales would provide an additional 2500 cu.ft. of storage. 5.3.2 Ground Saturation Surrounding Retention Basin - The objective of retention will not be met if water retained breaks out of the ground's surface adjacent to the retention basins, which, during a "100 year" storm, may be holding water at a level higher than these original surfaces. Water in retention will effect a hydraulic elevation or mounding in the surrounding ground (surface aquifer). This elevation is an inverse function of the log of the distance from the retention basin times a factor related to the distance to discharge. Considering a worst case, at the back of the property, farthest from the discharge the 4 foot head in retention would cause mounding of 3 feet above the natural water table i foot outside retention and mounding of 1.75 feet 10 feet outside retention. To prevent any breakout and to provide an additional safety factor against it the fill surrounding the bulkhead at the base of the condominiums will be several feet above the maximum water retention level, graded in an apron configuration to be higher than Page 7 mounding would ever occur. This fill will be ground taken from the retention excavations, and compacted somewhat to reduce its conductivity. 5.3.3 Rate of Dispersion From Retention - Although transmissivity for the surface aquifer at the Atlantic Passage property is only moderate, the flux of water away from retention will be high due to proximity of a zone of discharge and the strong hydraulic gradient which will form with any increase in head. Two formulae have been used to develop independent estimates of the time required for dispersal of retained storm water: DARCY'S FORMULA Q=KA dh/dI where: Q is the quantity of water over a time period K is the hydraulic conductivity A is the cross-section area through which flow occurs dh/dl is the hydraulic gradient This is the same as: Q=TW dh/dl where: T is the transmissivity W is the width of the cross-section of flow dh/dl is the hydraulic gradient Although the. head may be higher the following calculations assume a constant head of 2 feet above the equilibrium water table position. This is the elevation of the sand layer in the retention basins and the hydraulic condition which would be in force when the standing water in the retention basins will disappear. Moreover it is a value which may be safely assumed for any water standing higher than 2 feet in the retention basins. The higher head which would actually be in place after 14.5 inches of rain would cause even a greater rate of flow than reported here, thus, these calculations are conservative. The following table contains values and calculations of Darcy's formula using these calculations from which a total exfiltration rate may be estimated. In the table the FRONT value is the length parallel to discharge. BUILDING TRANS. FRONT dh d1 0 NUMBER (sf/day) (feet) (feet) (feet) (cf/day) 1 1140 140 4 120 6584 2 1140 120 6 200 5926 3 1140 147 6 295 4218 4 1140 120 5 200 4233 5 1140 140 5 115 8588 6 1140 140 4 45 17559 7 1140 120 4 100 6773 TOTAL 0 per day 53881 cu.ft. Page 8 After 10.5 inches of rain the 7 retention basins would have 101,356 cu.ft. of stormwater above the sand layer if filled instantaneously. At a dispersal rate of 53 881 cu.ft./day while water is above the sand layer, Darcy's equation indicates 1.9 days would be required for the standing water to be removed to the level of the sand. This calculation is conservative for it considers flux to occur in only one direction, and does not consider higher heads which might occur during the early part of retention. Also it does not consider the immediate flux which would occur at the outset of the storm. HEATH'S FORMULA: Applying heath's formula, as presented in section 4.2, to the same conditions: ? h = ho exp(-lt-Tt/4a2S) The following table contains values and calculations of Heath's formula using these calculations from which a total enfiltration rate may be estimated at each individual retention pond. The values of "t" presented have not been integrated fore the whole system, but rather are presented individually giving a range of'time which would be required for water in the retention ponds to fall below the level of the sand under the condominium units. Again the calculation is conservative for a minimum head level at the sand's surface has been used. BUILDING h ho a t t NUMBER (feet)) (feet) (feet) (days) (hours) 1 2 4 120 .63 15 2 4 2 200 1.02 24 3 4 6 295 2.22 53 4 3 5 200 1.29 31 5 3 5 115 .42 10 6 2 4 45 .08 2 7 2 4 100 .43 10 Thus, Heath's method indicate the standing water would fall below the sand layer of the retention basins some time between 2 and 52 hours depending on the distance of the condominium unit from the Intracoastal waterway. It is reassuring to see these time estimates are in a similar range to those predicted by use of Darcy's formula. Presumably neither of these methods provides exact information about the actual removal rates of storm water from the retention basins by infiltration and flux through the surface aquifer, rather they give times which bracket an actual time requirement. This is somewhere between i and 3 days for the standing water to fall below the sand surface in the retention systems. This, it seems, should be an allowable time for recovery considering the unusual climatological event which would cause the stormwater problem in the first place. November 4,1985 F)V) a).. ,J Y F ? Respectfully submitted, T C, Incorporated r• :;a,3` -u a ?L °?O. `yew Sao ? • Charles F. Stehman, Ph.D. Hydrologist ??''''&Atli#++•?'??? ?I CL Z A w %n ?j Q U- N J ' o U- a ce N C? ? O In 0- Q O V ti i ( ,' 1i AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County O?,yecvflSriewell no• Location: Pumped well no. Average Q gpm r= r,=- Date Hour t (min) t/ (min) t/tl Depth to water S (unad- 'usted) Adjust- ment os s' (ad- justed) Q (gpm) Remarks o. a 5'a" 0.5 v 5 /.5 " © 4r 5 ? M 3 W? Jr /D a off. 30 35 ?a L 5 02 d O ,? ? v I C9 D ao MO 14 AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Location: Observation well no. _ Pumped well no. 1 Average Q gpm r= ft. r2= Date Hour t (min) t/ (min) t/ t., Depth to water s (unad- justed) Adjust- ment As s? (ad- justed) Q (gpm) Remarks 3? ob ? D (? ?O N O c7 dDc.? ?O o O$ D ? fJ? O o D O l? - J J S.. C) v it vo v0 vo oL) .o ; o? /16 o v j '? r 1. V w v f 0 0 a v D n- $ f+ AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County : Location: Observation well no. 40P Pumped` well no Average Q gpm r= ft. r2 Date Hour t (min) t/ (min) t/t1 Depth to water s (unad- 'usted) Adjust- meat As so (ad- justed) Q (gpm) Remarks U. 0 a ,vim C9,1 0 U o 6 AQUIFER-TEST DEi1G\, County . Location: OBSERVATION, A ' \AI.TSIS _ Observation well noi. Average Q gpm r= ft. r2- Date Hour t (min) t/ (min) c/tl Depth to water s (unad- •usted) Adjust- ment As si (ad- justed) Q (gpm) Remarks G..S / 5 -' v _ 'y ,5 A) ,z„ 76a 70 J ?5J w .S v v /? AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Observation well no. Location: Pumped well no. Average Q gpm r - ft. r2 = Date Hour t (min) t/ (min) t/tl Depth to water s (unad- •usted) Adjust- ment As sl (ad- justed) Q (gpm) Remarks ?D S D ?? d G D ? 00 D D $, ?v c) t-) c v? 7 vo 00 a v ?t v? i 00 40 4 6 90 ?'® v 00 v ov c?3? a oo _ t 1%'V'4 i i AQUIFER-TEST DESIGN, OBSERVATION, AND DATA ANALYSIS County Observation well no. Location: Pumped well no. Average Q gpm r= ft. r2 Date Hour t (min) to (min) t/tl ;DDepth o ter s (unad- usted) Adjust- meat As so (ad- justed) Q (gpm) Remarks 1 lV'ti t;) 1 d ?C) '?7n ej 6.4 Ex ?, b,+° o) 6 v 00 00 z z - ° N p I, . - z N z° cn W Z 010 H as W i cn ?oa ?rJ Z i Y Z J 3 'co J W ` u H L O --- z r ? ,-- ? G ,. " .,..,. w Cdd u o d abo ai co 7 Q A L r1 4j o co z a r? _ fJ w E-4 u 0 c n 0-+ cc H , to .C OQ •rl i+ N to 7 G m a as i'? ca w TEST IDMFR I NG RECQFRL7 DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 2030 50 0.0 5.5 8.0 12.0 22.0 27.0 37.0 Very loose dark brown SC clayey fine to medium SAND 1-0-0 18 with local pockets of soft clay. 1-0-0 2 Very soft black fine sandy PEAT. PT 0-0-0 18 1-1-1 18 Very loose black silty fine SM SAND. -------------------- - Firm to loose olive fine to SP medium SAND and shell 7-10-i1 ib fragments. r 10-5-4 13 - - - - - - - - - - - - - - - - - - - Loose dark gray silty fine ---- SM SAND. 0-3-2 18 - - - - - - - - - - - - - - - - - - - Very loose to loose dark ----- SC gray clayey fine to coarse 1-1-1 18 SAND and shell fragments with 2"-3" lenses of soft ray clay. 4-3-5 18 L Stiff gray CLAY with thin CH lenses of sand. 40 10-6-9 18 JOB NUMBER BORING NUMBER DATE PAGE 1 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-1 7-23-85 LAW EhIG I tVEEiZ I P4 C3 TEST I IVG COMIP'ANY TEST 3BMR I MCS REC0FZI3 DEPTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0 10 2030 50 42.0 50.0 BLOWS PER REC. SIX IN. (IN.) A S 7- C N. dense light gray silty V ery fine to medium SAND and SM 18-28-33 18 shell fragments with cemented pieces. I?r 0 Boring terminated at 50.0'. Note: Samples wet below 1.0'. SU?f JOB NUMBER BORING NUMBER DATE PAGE 2 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-1 7-23-85 L OckW EtyG I NEER I P4 (3 TEST I MCG C:C3MPANY TEST BMF;t I M(3 f;t EC_-MFtn DEPTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0 10 2030 50 0.0 ' 11.0 17.0 22.0 27.0 32.0 37.0 BLOWS PER REC. SIX IN. (IN.) Very soft dark gray silty CL CLAY with large amount of 0-0-0 18 organic fibers. 0-0-0 0 Wo (B 0-0-0 0 0-0-0 0 Firm olive fine to medium SP SAND and shell-fragments. 6-10-14 18 - - - - - - - - - - - - - - - - - - - Firm gray silty fine SAND. ------ SM 10-9-12 16 - - - - - - ----- - - - - - - - - - - - Very loose gray silty fine --- S_M SAND with local pockets of SC 4-1-1 18 soft gray clay. - - - - - - - - - - - - - - - - - - - - Soft gray silty CLAY with CL some fine sand and shell 0-0-3 18 fragments. Firm gray clayey fine to SC medium SAND with lenses of b-5-6 18 soft gray clay. ------------------ Dense gray fine to medium SP SAND. 22-15-16 12 JOB NUMBER BORING NUMBER DATE PAGE 1 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-2 7-26-85 LAW EIVCG I h1EEF:Z I NG TEST I P4 13 COMF=0 ANY TEST 3BMF;t I Ma RECQF7D DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT ) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 20 30 50 42.0 43.0 ?cNSC SA?? SFP ---------------- Hard drilling-No sample. Boring terminated at 43.0'. JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-09807 B-2 7-26-85 L A W E N G I N E E R I N G TEST I NG COMFPANY PAGE 2 OF 2 ' TEST 3BMFt Y MCC FtEiCM F;t 73 DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 2030 50 0.0 3.0 5.5 8.0 20.0 Loose light gray fine to medium SAND. SP 2-4-5 16 Very soft gray silty CLAY CL 0-0-1 18 with large amount of rgani c fibers. o Very loose black silty fin anic SAND with some or 9A 1-0-1 2-3-6 18 18 g fibers. SM - - - - - - - - - - - - - - - - Very loose to firm dark gray to olive fine to SP -1-1 8 medium SAND with some silt and shell fragments. 4-11-15 16 Boring terminated at 20.0'. JOB NUMBER BORING NUMBER DATE PAGE 1 OF 1 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-3 LO=kW EhJG I NEEF;Z I NG 7-23-85 TEST I FyG CQMF='ANY TEST HBOR I MC3 F;t ECU F;t L} DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 2030 50 0.0 3.0 5.5 8.0 17.0 22.0 27.0 37.0 Soft gray and tan silty CLAY. CH 3-2-1 10 Very loose dark brown silty SM 0-0-0 18 fine SAND with large amount Of organic fibers. 5)v, 4-3-4 18 Loose black silty fine SAN anic fibers with some or 4-4-6 16 . g SM - --------------- Firm to loose brown fine SP SAND with some silt. SM -1-2 18 - - - - - - - - - - - - - - - - - - - Dense gray fine SAND. -- - SP 13-16-20 18 - - - - - - - - - - - - - - - - - - - - Very loose gray silty fine --- S_M ` SAND with pockets of soft SC 2_1-2. 18 gray clay. ------------------ Firm gray fine to medium SP SAND and shell fragments b-7-5 18 with small pockets of clay. 10-8-9 18 Very stiff gray silty CLAY CH with thin sand seams. 5-6-23 18 JOB NUMBER BORING NUMBER DATE PAGE 1 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS 347285-0980 B-4 7-26-85 I AckW EhJG I h1EEFZZ I NCG TEST I P4 C3 COMF}ANY 1? TEST Hc[?F? I NS I-?cECO?D DEPTH' DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) ' (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 2030 50 42.0 45.0 Dense light gray silty fine to medium SAND and shell SM 26-23-27 18 fragments. Boring terminated at 45.0'. JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-4 7-26-85 LAW ENG I NEEF;Z I NCG TEST I NG COMF=> ANY PAGE 2 OF 2 TEST 3B MFzt I MC3 F;ZECOFR;D DEPTH DESCRIPTION ELEVATION PENETRATION (FT.) (FT.) (BLOWS/FT.) 0 10 2030 50 0.0 3..0 8.0 17.0 22.0 27.0 37.0 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS JOB NUMBER J47285-0980 BORING NUMBER B-5 L A W E P4 13 I P4 E E F;Z I N G DATE 7-24-85 TEST I P4 13 CC3 MF='ANY PAGE 1 OF 2 BLOWS PER REC. SIX IN. (IN.) Firm gray fine SAND. SP 5-7-5 10 Very soft dark gray silty CL 1-1-1 2 CLAY with large amount of organic fibers. 0-0-0 wdIJ /S 18 Loose brown fine SAND. SP 2-3-6 18 Note. Trace of organic fibers at 10.0'. 4-4-2 18 ------------------- Dense olive-fine to medium SAND. --- SP 12-17-15. 16 Very soft gray fine sandy CLAY. CL 1-1-1 18 Loose to firm gray clayey fine SAND. CH 6-6-2 18 3-3-10 18 Stiff gray silty CLAY with thin sand lenses. CH 5-9-20 18 DEPTH (FT.) 0. 0 5.5 8.0 12.0 22.0 30.0 TEST HcCIi? I h!G FECOFZD DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (BLOWS/FT.) SIX IN. (IN.) n 10 20 30 50 Firm to loose brown fine SP 6_7_7 12 SAND. L-2-1 10 Loose black silty fine SAND - - - - - - - - SM --- 4-4-4 16 - - - - - - - - - - - - Firm brown fine SAND. SP 6-7-8 12 - - - - - - - - - - - - - Firm olive fine SAND and ,. SP shell fragments. 0-5-7 18 10-14-15 16 - - - - - - - - - - - - - - - - - - - Dense gray fine to medium ----- SP SAND and shell fragments. 12-14-19 14 10-15-17 18 Boring terminated at 30.0'. JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-6 7-24-85 LAW EtVG I P4 EEFc I NC3 T E S T I MC3 C O M P A N Y PAGE 1 OF 1 TEST HBC1F< I MC3 F-:tECC1F n DEPTH DESCRIPTION ELEVATION PENETRATION BLOWS PER REC. (FT.) (FT.) (BLOWS/FT.) SIX IN. (IN.) 0 10 20 30 50 0.0 3.0 5.5 8.0 4 32.0 Loose brown fine SAND. SP 5-2-2 6 Very soft dark gray silty CL 0-0-0 18 CLAY with some fine sand wQ I-L and organic fibers. \ - - - - - - - - - - - - - - - - - / SM 0-0- 19 Very loose black silty fin e amount of ith lar SAND 4-8-10 15 g w organics. SM Loose to firm brown to SP olive and gray fine SAND 6-10-12 18 with traces of silt and shell fragments. 8-8-6 12 6-6-3 10 8-7-8 18 - - - - - - - - - - - -- - - - - - - - - Firm to dense gray fine to ---- SP medium SAND with isolated 7-6-10 18 1/2 to 1.0" clay seams. 10-14-17 18 JOB NUMBER BORING NUMBER DATE REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS J47285-0980 B-7 7-25-85 LAW EhiG I NEER I NG TEST" I ME3 CC)MF=> ANY PAGE 1 OF 2 rte! , DEPTH (FT.) 'TES'T 3BMFZ I M(3 RECORD DESCRIPTION ELEVATION PENETRATION (FT.) (BLOWS/FT.) 0 10 2030 50 42.0- 43.0 BLOWS PER REC. SIX IN. (IN.) DC-NScr}r D - - - - - - - - - - - - - - - SP Hard drilling-No sample. Boring terminated 43.0". I i I I I JOB NUMBER BORING NUMBER DATE PAGE 2 OF 2 REFER TO ATTACHED SHEET FOR EXPLANATIONS AND SYMBOLS 347285-0480 B-7 LAW ENJS I NEER I NCG 7-25-85 TEST 111%1 C-3 COMP'ANY N h a .Q T vs a? < S o in a w -------------- C` I V ? t ! `t' J fT1 • C J v J \\1\` t C? .rrt J ( r / V/ ,c v \ n f ? j