Loading...
HomeMy WebLinkAboutWQ0004910_Report_20180731 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Dw.R Collection System Sanitary Sewer Overflow Reporting Form Division of Water Resources Form CS-SSO PART I: This form shall be submitted to the appropriate DWR Regional Office within five business days of the first knowledge of the sanitary sewer overflow(SSO). Permit Number•{�✓4 O c14? QCS#if active, otherwise use WQCSD#) VVQ O49/� ty ,+ '�/V c1 fCYvrt� Facile .{i(faGC/�Qh4f�' /�'G Gn Sy-St/incident#. f Owner: 1 WI , Region• City �Iariki?4 County: A/0 j-'t-ham')t Source of SSO (check applicable): Sanitary Sewer I Pump Station/Lift Station SPECIFIC location of the SSO (be consistent in description from past reports or documentation-i e. Pump Station 6, Manhole at Westall& Bragg Street, etc). Manhole#. 2_8 @ NG Latitude (degrees/minute/second). Longitude (degrees/minute/second). Incident Started Dt 7-024-V61 Time• G'30 A' Incident End Dt 9,`'Io 41'! Time. / "T4 (mm-dd-yyyy) (hh:mm)AM/PM (mm-dd-yyyy) 7_21}-/6 (hh:mm)AM/PM Estimated volume of the SSO: 3'c2O gallons Estimated Duration (round to nearest hour) 3 hour(s) Describe how the volume was determined. L 5 7/YIate. RSCS I Weather conditions during the SSO event Rael4.'6' "gat t11 sD•®cApo JUL 3 ®W� Did the SSO reach surface waters? 571-Yes No I Unknown j 2018 Volume reaching surface waters. 500 gallons Surface water name. Pe •mer eS Ut Did the SSO result in a fish kill? I I Yes I til No I I Unknown tn0`SeCtjp1 If Yes,what is the estimated number of fish killed? SPECIFIC cause(s) of the SSO. ;Severe Natural Conditions I Grease I (RootsI J✓Inflow& Infiltration I !Pump Station Equipment Failure I I Power Outage Vandalism I Debris in line I (Pipe Failure (Break) Other(Please explain in Part II) 24-hour verbal notification(name of person contacted): IDWR I (Emergency Management Date(mm-dd-yyy)•") ;j4 /'Time: (hh:mm AM/PM)2 :;2r P/r Per G.S. 143-215.1 C(b), the owner or operator of any wastewater collection system shall: try Kre f5 eY' In the event of a discharge of 1,000 gallons or more of untreated wastewater to the surface waters of the State, issue a press release to all print and electronic news media that provide general coverage in the county where the discharge occurred setting out the details of the discharge. The press release shall be issued within 24 hours after the owner or operator has determined that the discharge has reached surface waters of the State. In the event of a discharge of 15,000 gallons or more of untreated wastewater to the surface waters of the State, publish a notice of the discharge in a newspaper having general circulation in the county in which the discharge occurs and in each county downstream from the point of discharge that is significantly affected by the discharge The Regional Office shall determine which counties are significantly affected by the discharge and shall approve the form and content of the notice and the newspapers in which the notice is published. WHETHER OF NOT PART I1 IS COMPLETED,A SIGNATURE IS REQUIRED SEE PAGE 13 Form CS-SSO Page 1 0 Inflow and Infiltration Are you under an SOC (Special Order by Consent)or do you have a schedule I I Yes No NA NE in any permit that addresses I/1? Explain if Yes: What corrective actions have been taken to reduce or eliminate I & I related overflows this spill location within the last year? L;'n'- re-Fat r Has there been any flow studies to determine I/I problems in the Yes I I No I INA NE collection system at the SSO location? — 1 If Yes,when was the study completed and what actions did it recommend? Has the line been smoke tested or videoed within the past year? Yes No I INA NE If Yes,when and what actions are necessary and the status of such actions Are there I/I related projects in your Capital Improvement Plan? I I Yes No [ IvNA I I NE If Yes, explain. Have there been any grant or loan applications for I/I reduction projects? Yes I I No I INA I I NE If Yes, explain Do you suspect any major sources of inflow or cross connections I I Yes o I INA I I NE with storm sewers? If Yes, explain Have all lines contacting surface waters in the SSO location and upstream Yes No NA I j NE been inspected recently? If Yes, explain. What other corrective actions are planned to prevent future I/I related SSOs at this location? Comments: 4/01- arc( K// j?"ver w A5� 5, i d "ecvfi e a rctvl� 1G Sl/J Iih2 4t/in ye/Ver p/ f-eJab Mme n4an he/es Ye r e- rev()fe z' e s etv /1 tile. Form CS-SSO Page 6 System Visitation, ORC Yes P/' E L0y1± r Backup Yes tUhLeIe/- Name. Certification Number Date visited: '2 - V I Time visited: /0 " How was the SSO remediated (i./e. Stopped and cleaned up)? 7e5/ As a representative for the responsible party, I certify that the information contained in this report is true and accurate to the best of my knowledge. Person submitting claim: M- 1-a.c9/ Date: 7-02��2S Signature: /lif •,• �' Title: Or 1 VCS Telephone Number: Any additional information desired to be submitted should be sent to the appropriate Division Regional Office within five business days of first knowledge of the SSO with reference to the incident number (the incident number is only generated when electronic entry of this form is completed, if used). Form CS-SSO Page 13