Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf
A. Processing Information
County (or Counties) where the project is located:*
Franklin
Is this project a public transportation project?*
f Yes f• No
This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project.
1a. Type (s) of approval sought from the Corps:*
V Section 404 Permit (wetlands, streams and waters, Clean Water Act)
F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
IJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits.
All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form.
Nationwide Permit (NWP) Number: 18 - Minor Discharges
NWP Number Other:
List all IWV nurrbers you are applying for not on the drop down list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
IJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
F Non -404 Jurisdictional General Permit IJ Riparian Buffer Authorization
r Individual Permit
*
1d. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
O Yes O No
For the record only for Corps Permit: O Yes O No
1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
If so, attach the acceptance letter from mitigation bank or in -lieu fee program
f Yes C No
1f. Is the project located in anyof NC's twentycoastal counties?*
r Yes C No
1h. Is the project located in a designated trout watershed?*
f Yes f• No
Link to trout information: http://vmw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Scott Frederick
1b. Primary Contact Email:*
sjfrederick@sv.sgrp.com
1c. Primary Contact Phone:*
(xxx)xxx-xxxx
(919)831-1234
1d. Who is applying for the permit?
❑ Owner r Applicant (other than owner) rJ Agent/Consultant
(Check all that apply)
2. Owner Information
2a. Name(s) on recorded deed:
Novozymes North America, Inc.
2b. Deed book and page no.:
765/355
2c. Responsible party:
(for Corporations)
Steve Stadelman
2d. Address
Street Address
PO Box 576, 77 Perry Chapel Church Road
Address Line 2
city
Franklinton
Fbstal / Zip Code
27525
2e. Telephone Number:
(xxx)xxx-xxxx
(919)494-3390
2f. Fax Number:
(xxx)xxx-xxxx
2g. Email Address:*
sast@novozymes.com
4. Agent/Consultant (if applicable)
4a. Name:
State/ Province/ legion
NC
Country
USA
Scott Frederick
4b. Business Name:
(if applicable)
Soil, Water, and Environment Group, PLLC
4c. Address
Street Address
3216 Byers Drive, Ste B
Address Line 2
City
Raleigh
Postal / Zip Code
27607
4d. Telephone Number:
(919)831-1234
(XXX)XXX-XXXX
4e. Fax Number:
(919)899-9100
(XXX)XXX-)O=
4f. Email Address:*
sjfrederick@sv,egrp.com
State/ Province/ Region
NC
Country
USA
Agent Authorization Letter*
Reese provide the Agent Authorization Letter if you are sub n itting this docurrent.
Agent Authorization_NOVO_SWE Group.pdf 126.22KB
RLE TYPE M -ST BE RDF
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Novozymes Treatment Systems
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
*
Frankling
1d. Driving directions*
If it is a new project and can not easily be found in a GPS crapping system Pease provide directions.
North on US 1, east on US56, north on Perrys Chapel Road.
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
1875-46-3775
2b. Property size:
(in acres)
250
2c. Project Address
Street Address
PO Box 576, 77 Perry Chapel Church Road
Address Line 2
aty
State/ Province/ Region
Franklinton
NC
Postal / Zip Code
Country
27525
USA
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as
appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
36.10611 74.40806
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Buffalo Creek
3b. Water Resources Classification of nearest receiving water:*
R/
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Tar -Pamlico
River Basin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Forested UTs to Buffalo Creek surrounded by managed cropland.
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Click the upload button or drag and drop files here to attach docunent
Figure 1_Project Vicinity Map.pdf 2.06MB
File type mist be pdf
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Click the upload button or drag and drop files here to attach docurrent
Novozymes_Minfo_20150902 NRCS.pdf 2.04MB
File type mist be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
10 acres
4e. List the total estimated linear feet of all existing streams on the property:
(intermttent and perennial)
15,000
4f. Explain the purpose of the proposed project:*
Water quality research and improvement project to determine fate of nutrients (i.e. NO3) in surface waters.
4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The project will inundate approximately -100 If (Farm 1) and -136 If (Farm 2) of perennial stream intermittently
during peak flows to capture and treat water, removing NO3 during base flow and following storm events.
Temporary impacts to Tap -Pam buffers on Farm 2 equate to - 691 ft2. Note, no forested buffers exist in the
historic pond bottom of Pond 4 (Farm 2), therefore Tar Pam buffers will not be impacted. Buffers will be reforested
during this project per treatment design and improving the buffers, gaining 5,000 ft2 of buffers. Farm 1 buffers will
only be temporarily impacted for a construction entrance to the stream.
The treatment collection boxes for Novozyemes are intended to be 4' wide by 8' long by 4' deep concrete boxes.
They are intended to be installed in 8' sections, either as a single unit (Farm1) or combined into a longer
structure, 25' to 32' long (Farm 2/Pond 4). The inlets to the collection boxes are intended to be a series of coiled,
perforated pipes, protected by either geotextile, gravel, or a combination of the two. The collection inlet is intended
to remain
submerged at all times. The water level within the collection boxes is intended to be maintained by the outflow
piping, consisting of the outflow pipe, a 90 degree elbow and a standpipe inserted into the elbow. The desired
upstream water level can be controlled by substitution of different height standpipes to maintain the desired pool
level. Changes in desired standpipe height are very simple and require very minimal operational changes.
In addition to the upstream wetland control water levels, the collection boxes are intended to provide the potential
for additional nitrogen treatment/reduction. The volume within the boxes can accommodate any of the pilot tested
materials, including carboniferous materials (peat, wood chips, etc) or zeolite (sulfur treatment). Any desired
treatment interval is easily achieved by modifying the standpipe height within the confines of the 404/401 permit.
Finally, the collection boxes are intend to have an installed lid, and function as an storm overflow. This will account
for the normal stream flow of 2-10 gpm, prevent any installed treatment materials from washing downstream, and
accommodate storm flows greatly in excess of the normal treatment flow. Water exiting the system will be controlled
using a natural channel design structure to protect the stream and structure during peak flow events.
4h. Please upload project drawings for the proposed project.
nick the upload button or drag and drop files here to attach docurrent
farm 2_pond4_final.pdf
314.98KB
farm 2_pond4_topo_final.pdf
323.4KB
farm1_final.pdf
268.41 KB
Novozymes_JDlnfo_20150902 farm site location.pdf
986KB
File type mist be pdr
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas? *
r Yes r No r Unknown
Comments:
On file with previous PCN and NWP18 permits.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary
Corps AID Number:
Example: SAW -2017-99999
SAW -2015-02074
r Approved
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
r Unknown r N/A
Mark Mickley et al.
PKA: Mulkey Engineering
assisted by Scott J. Frederick
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
USACE JD: 2016
Supporting JD request attached. No JD
5dl. Jurisdictional determination upload
Click the upload button or drag and drop files here to attach document
Novozymes_JDlnfo_20150902.pdf 6.33MB
File type must be FDF
6. Project History
6a. Have permits or certifications been requested or obtained forth is project (including all prior phases) in the past?*
r Yes r No r Unknown
6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000).
SAW -2015-02074
Project History Upload
Click the upload button or drag and drop files here to attach docurrent
Farm 1 Gen NWP18.pdf 1.07MB
Farm 2 Gen NWP18.pdf 950.97KB
File type mast be FDF
7. Future Project Plans
7a. Is this a phased project?*
f Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre -construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
F Wetlands V Streams -tributaries V Buffers
F- Open Waters r Pond Construction
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites
impacted.
3a. Reason for impact*3b.lmpact 3c. Type of impact *3d. Stream name * 3e. Stream
Type *
(SE) UTto Buffalo Ck Perennial
Perennial (FES or
intermttent (INT)
3f. Type of
Jurisdiction*
Both
(SA) UTto Buffalo Ck Perennial Both
Perennial (F!3� or
intermttent (INT)
** All Perennial or Intermittent streams must be verified by DWR or delegated local government.
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
236
3i. Total temporary stream impacts:
0
3i. Total stream and tributary impacts:
236
3j. Comments:
3g. Stream 3h. Impact s
width* length*
2 100 2
Average (linear feet) 0
(feet) 0
3 136
Average (linear feet)
(feet)
type
S1 Treatment
P Flooding
Structure/Inundation
Ferrrenent(F' or
Ivbp label (e.g. Fbad (Drossing
Terrporary (T)
1)
S2 Treatment
P Flooding
Structure/inundation
Ferrrenent (P) or
Ivbp label (e.g. Fbad Qossing
Terrporary (T)
1)
Type *
(SE) UTto Buffalo Ck Perennial
Perennial (FES or
intermttent (INT)
3f. Type of
Jurisdiction*
Both
(SA) UTto Buffalo Ck Perennial Both
Perennial (F!3� or
intermttent (INT)
** All Perennial or Intermittent streams must be verified by DWR or delegated local government.
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
236
3i. Total temporary stream impacts:
0
3i. Total stream and tributary impacts:
236
3j. Comments:
3g. Stream 3h. Impact s
width* length*
2 100 2
Average (linear feet) 0
(feet) 0
3 136
Average (linear feet)
(feet)
-46 If was impacted during the pilot study on Farm 1 UT to Buffalo Creek (SE) under the original NWP18. No
impacts occurred at Farm 2 under the eAsting NWP18 for that UT to Buffalo Creek (SA).
6. Buffer Impacts (for DWR)
If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below.
6a. Project is in which protect basin(s)?*
Check all that apply.
F Neuse IJ Tar -Pamlico
F Catawba ❑ Randleman
F Goose Creek r Jordan Lake
F Other
6b. Impact Type * 6c. Per or 6d. Stream name
Temp*
Allowable T SA
Location and Exenpt, Allowable, allowable w/ F2rrranent (F) or
rrNafion Temporary (T)
6h. Total buffer impacts:
Zone 1 Zone 2
Temporary impacts: 345.00 345.00
Zone 1
Zone 2
Permanent impacts: 0.00
0.00
Zone 1
Zone 2
Total buffer impacts: 345.00
345.00
6e. Buffer mitigation
required?*
No
6i. Comments:
Temporary impacts to Tap -Pam buffers on Farm 2 equate to — 691 ft2. Note, no forested buffers east in the
historic pond bottom of Pond 4 (Farm 2), therefore Tar Pam buffers will not be impacted. Buffers will be reforested
during this project per treatment design and improving the buffers, gaining 5,000 ft2 of buffers. Farm 1 buffers will
only be temporarily impacted for a construction entrance to the stream.
Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc.
nick the upload button or drag and drop files here to attach document
farm 2_pond4_final.pdf 314.98KB
farm1_final.pdf 268.41 KB
File rust be PDF
E. Impact Justification and Mitigation
1. Avoidance and Minimization
6f. Zone 1 6g. Zone 2
impact* impact*
345 345
(square feet) (square feet)
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
The project minimized impacts to waters in order to achieve mabmum water quality potential. The design chosen
and orientation within the channel also minimized impacts in both UTs. The impoundment was minimized and
located in specific reaches to minimize inundation depths and disturbance to eAsting channel (i.e. near relic dam
structure for Farm 2). Inundation depths were minimized to reduce flooding and eliminate impacts to wetlands. A
bypass design for storm flows will be implemented to minimize inundation. Bankfull benches will be installed at
Farm 2 to all for infrequent flooding events as well as reforest and vegetate the entire project area including
temporary inundation areas for storm events.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
Temporary construction entrances will be used as well as existing entrances where possible to minimize impacts to
buffers. Construction entrances will be placed to minimize excavation and disturbance to existing topography.
Construction will be completed under dry conditions to minimize erosion and impacts to soils. Equipment used will
minimize in stream disturbances by working outside of the stream channel as much as possible. Bank -full benches
as well as natural channel grade control outlet structures will be installed to minimize in stream impacts during and
following construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Impacts to streams will be minimized and kept below compensatory mitigation thresholds.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
— Recent changes to the stormwater rules have required updates to this section .""
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
f Yes r No
For a list of options to meet the diffuse flow requirements, click here.
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
f Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?*
f Yes
f• No
To look up low density requirement click here 15A NCAC 02H.1003(2).
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -
approved local government stormwater program?*
f Yes
r No
Hnt: projects that have vested rights, exemptions, or grandfathering from state or locally inplerrented storrrwater programs or projects that satisfy state or locally-irrplerrented storrrwater prograrrs
through use of corrrrunity irrlieu prograrrs should answer no to this question.
3. Stormwater Requirements
3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided
to document the project will not cause degradation of downstream surface waters.'
r Stormwater Management f Antidegradation
Plan Calculations
3b. Stormwater Management Plan: If submitting a SMP for review and approval, it shall complywith the high-density development
requirements set forth in 15A NCAC 02H .1003. Include all appropriate stormwater control measure supplemental forms and associated
items.
nick the upload button or drag and drop files here to attach docurrent
RLE TYPE MJST BE FDF
3c. Antidegradation Calculations: If submitting calculations to document the project will not cause degradation of downstream surface
waters, the documentation shall include a detailed analysis of the hydrological impacts from stormwater runoff when considering the
volume and velocity of stormwater runoff from the project built upon area and the size and existing condition of the receiving
waterbody(ies).
Click the upload button or drag and drop files here to attach docurrent
RLE TYPE MET BE FDF
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?*
f Yes w: No
2b. Is this an after -the -fact permit application?*
f Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
f Yes r No
3b. If you answered "no," provide a short narrative description.
No development proposed or planned for this project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes f Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r^ Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
f Yes r No
5d. Is another Federal agency involved?*
f Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?*
r Yes t' No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Natural Heritage Program
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
f Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpomb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
f Yes C No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NC Department of Natural and Cultural Resources
7c. Historic or Prehistoric Information Upload
nick the upload button or drag and drop files here to attach docurrent
NC Natural and Cultural Resources.pdf 105.05KB
File mut be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
f Yes C No
8c. What source(s) did you use to make the floodplain determination?*
FEMA
Miscellaneous
Miscellaneous attachments not previously requested.
Click the upload button or drag and drop files here to attach docurrent
File mist be FDF or IWQ
Signature
P By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Scott J Frederick
Signature
Date Submitted:
8/2/2018
Initial Review
Is this project a public transportation project?*(?
f Yes r No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?
r Yes
f No
BIMS # Assigned *
20181064
Version#*
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
Select Project Reviewer*
Stephanie Goss:eads\szgoss
Is a payment required for this project?*
f No payment required
f Fee received
r Fee needed - send electronic notification
What amout is owed?*
* $240.00
r $570.00