Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NCO068152 111 12 I 18/06/20 I17
18 Lr,] ] 19 LG] 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA
----------------------Reserved-------------------
67 70 I I 71 I I 72 I r l
u ty
73 I I 174 751 I I I 1 1 1 I80
I I i
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:30AM 18/06/20
16/08/01
Eden Glen Mobile Village WWTP
2 Gospel Way
Exit Time/Date
Permit Expiration Date
Weaverville NC 28787
11:00AM 18/06/20
20/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Joedavid Matthew Hal l/0RC/828-586-5588/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Randy Roberson, //828-779-5265/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Operations & Maintenance
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
Linda S Wiggs ARO WQ//828-296-4500 Ext.4653/
Timothy H Heim ARO WQ//828-296-4665/
EW
Signature of Management Q A ReviewerDocusigned by: Agency/Office/Phone and Fax Numbers
E7/13/2018
Date
7E617A38285848C...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
DocuSign Envelope ID: C763963A-5BDA-4A2A-801A-56E4AA6F0817
NPDES yr/mo/day Inspection Type (Cont.)
NCO068152 111 121 18/06/20 1 17 18 IDI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
This TA was performed concurrent with Linda Wiggs (ARO) and a CSI.
Observations:
The plant was observed to be producing high quality effluent while the blowers in the aeration basin
were operating, and while not operating, however, immediately following blower shut-off, there
appeared to be a hydraulic "surge" from the aeration basin through the clarifier that move a significant
amount of solids into the chlorine contact chamber and subsequently the receiving stream. Effluent
quality was extremely poor with visible high solids and high flow for approximately 5 minutes following
this event. The ORC reported that this phenomenon occurs regularly when the blower shut down.
Potential Causes:
It appears that the shutdown of the blowers causes a hydraulic surge through the plant which results in
high velocities/pressures in the clarifier and pushes solids into the contact chamber. The solids
blanket in the clarifier was not at an acceptable level (verified with sludge judge) and the ORC reported
that varying the solids depth does not improve the problem.
It is possible that excess air from the blowers results in an expansion of the volume of water in the
aeration basin, and when the blowers are shut off, the volume collapses resulting in the hydraulic
surge.
It is also possible that excessive blower volume/velocity is causing floc shear and reducing settling
characteristics. A settleability test performed at the time of the inspection showed negligible settling
characteristics after the blowers were operated. D.O. probe used during blower operation showed
excess oxygen in the aeration basin. The sludge judge was used in several locations and did indicate
excessive solids in the plant.
Possible Solutions:
1. Reduce blower size and/or air volume and velocity in the aeration basin. This may be
accomplished by replacing the blower, re -gearing the belt drive, or closing the valves on the blower
lines in the aeration basin. The blowers should be operated at the minimal power level needed to
supply D.O. to achieve BOD reduction. This will also reduce the power bill for the facility.
2. Reconfigure blower motor controls to allow a gradual shut down of blowers, instead of the "hard off"
currently used.
3. Mitigate the hydraulic surge before it reaches the clarifier. This facility is very old and the structural
steel that could be observed was in poor condition in many areas, especially between the aeration and
clarifier. It is possible that the orifice that allows flow from the aeration basin to the clarifier is too large
(or new holes have broken open) and reducing the size of this orifice would prevent the surge from
entering the clarifier. Verification of this would require drawdown, cleaning, and visual observation of the
plant and its components.
4. Replace the facility. Given its age, it is possible that this facility has reached the end of its useful life
and repairs required to return it to compliance would exceed those of replacing the plant.
Page#
DocuSign Envelope ID: C763963A-5BDA-4A2A-801A-56E4AA6F0817
Permit: NCO068152
Inspection Date: 06/20/2018
Owner - Facility: Eden Glen Mobile Village WWTP
Inspection Type: Technical Assistance
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: This TA was performed concurrent with Linda Wiggs (ARO) and a CSI.
See inspection for more info.