Loading...
HomeMy WebLinkAbout20191427 Ver 1_Meeting Note_20180730TIP .: Division: 6 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION FIELD SCOPING MEETING WORKSHEET Design Build Process WBS .: 17BP.6.PE.1 Route (US/NC/SR): SR 1159 Field Scoping Meeting Date: July 30, 2018 Location: On-site County: Columbus Project Description: Structure. 230313 over Boggy Branch on SR 1159 (Old Tram Road) Tier: Subregional Municipality: N/A Funding: Federal Attendees Name Phone . E-mail Division Bridge Program Manager Christy Huff, PE 910-364-0603 chuff@ncdot.gov Division Environmental Officer James Rerko 970-364-0834 jjrerko@ncdot.gov Division Environmental Specialist Division Construction Engineer Rusty Marsh, PE 910-364-0600 rmarsh@ncdot.gov Division Bridge Maintenance Darren Pittman 910-364-0670 dpittman@ncdot.gov Engineer Division Utility Coordinator Randy Rogers 810-364-0841 rdrogers4@ncdot.gov PP� PE ie Lancaster, g19-707-6620 jjlancaster@ncdot.gov PPU Jess Earley, PE 919-707-6606 jsearley@ncdot.gov Hydraulics Engineer Jon Moore 919-707-6711 jlmoore6@ncdot.gov Hydraulics Engineer USACE NCDEQ-DWR USFWS NCWRC Asst Div Bridge Program Manager Region 3 Locating Engineer Structure No: 230313 1 of5 Existinq Features Feature Bridged: Structure 230313 over Boggy Branch on SR 1159 Ex. Bridge Clear Deck Width: 24 (Ft.) Roadway width: 20 (Ft.) (Bridge / Culvert) Length: 73 (Ft.) Deck Width (Out To Out): 25.417 (Ft.) Water Depth: 3(Ft.) Height Bed-To-Crown: 6(Ft.) Year Built: 1955 Posted: SV Not Posted TTST: Not Posted Superstructure: Reinforced Abutment: Concrete floor on I-Beams — Temp. Shored: _ Historic High Water (Elev. To The Existing Structure ): PRI: 52.89 DP: 2.5 SR: 26.64 Pier Type: 1@ 18'3", 2@ 18'4", 1 @ 18'5" (Ft) School Bussing crossings per day: Diyisioii Posted Speed Limit Vicinity: 55 (mph) Detour Off-Site � Stage Construction ❑ New Alignment ❑ On-site ❑ If Off-Site, Description Of Detour Route: SR 1158 - NC 905 - NC 130 - SR 1166 - SR 1157 - SR 1159 Approximate Length Of Detour? 8.2 Miles Improvements Needed To Road(s) On Detour? Div. Traffic Eng. Recommend Off-site detour signing? Trailblazing with StreeURoad names Improvements Needed To Bridges On Detour? Division Are future plans for upgrading this roadway either at or in the vicinity of this project? Are Bridges On Detour Currently Programmed? Are There EMS Or Business Access Issues? Division Are There Any Railroad Crossings On Detour? No Should Work Zone Pedestrian Access Be Maintained During Construction? No Overhead Utility Lines Power Transmission Lines Telephone Cable Lines Fiber Optic Water Sewer Natural Gas Other In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict In Conflict Is There Any Future Utility Construction Anticipated In The Project Area: Is A FEMA Buy-Out Property Being Impacted: Structure No: 230313 2 of 5 Environmental � ���f� �r � �. � j , � Wetlands At Site: Yes > Comments: � � ; � Endangered Species In County: Red-Cockaded Woodpecker, Cooley's Meadowrue, Rough-Leaved Loosestrife i.��: �`- �, �;�•, I ` l T&E species effect: � Trout County: No NA County: j'!:� CAMA County: No Primary Nursery Area: ��� Moratoria: �,, �(� Which species: Duration: Permits discussion: '�� � � } 1 = Water Quality Classification: Class GSw 303d: ��ir —'" �^ i Coast Guard Permit? ��,. �� ;. Drainage Basin: Lumber Riparian Buffer Rules: N/A Is The Project Site In Or Near Any Of The Following: National Forest: No Wildlife Refuge: No State, County, Or Local Park: No Airport: No Water Supply Reservoir: No Public Use Boat Ramp: No Wild And Scenic River: No Recreation or Power Generation: No Nutrient Sensitive Waters: No Cemeteries: No �"� �, VAD/Farmland Protection: Game Lands: No Kwn Or Potential Historic Properties In The Area: ( 1-(?P.�` ,�� r� ,�; � ��,; �"_ �;'-Jll�� Architecture: Archaeology: \- � � Is The Bridge Structure Itself, Or Any Part Thereof, Considered Historic: Impacts to a Church, Community Center, Or Other Public Facility? No Is this a Statewide Bicycle Route or a Local n-Marked Bicycle Route: No Camments: Geotechnical Are There Any Historical and/or Vibration Sensitive Structures Near By? -------- Comments: Are There Any Kwn Landfills and/or Geo-environmental Hazard Sites at/or Within Close Proximity To The Project Site? -------- Comments: Are Any Impacts Anticipated To Natural Springs Or Artesian Wells? -------- Comments: Possible Foundation Type: End Bents: Interior Bents: Structure No: 230313 3 of5 ' Hvdraulics FEMA Approval? (MOA ) �i Is There Unusual Scour Potential? i State Stormwater Permit? Is Protection Needed? ' � Are Banks Stable? Is Protection Needed? Appreciable Amount Of Large Debris? Placement Of Bents In The Water Be Allowed: Where: j: u Structure Type: Bridge If Bridge: CS� or BB If girder; why? Length Of Structure: , Min. Number Of Spans: Span Arrangement: Waive offset: EB Cap: 2'-6" or 4'-0" Skewed: ' Items To Be Discussed / Resolved At FSM Bv Attendees Off-Site ❑ Stage Construction ❑ New Alignment ❑ On-site ❑ Clear roadway width: Clear roadway width: Temp. Signals: one lane w/ signals: I . � � C�,:. /i% or two lanes CRW: Alignment: N, E, W, S Alignment: N, E, W, S Alignment: N, E, W, S Environmental Document Prepared by DEO Or PEF: CE (federal) ❑ Minimum Criteria Checklist (state) ❑ ADT: 740 per BIR NHS: 0 Tier: Subregional Func. Class: Minor Collector Bridge Min. Clear Deck Width Recommended by Div.:,30 ftlOTO � , Roadway lane width: 11' with 3' shoulders, including 0' paved shoulders Extension of Paved shoulders: end of construction limits or end of guardrail (Blunt end or taper 8:1) Pave to face of guardrail and taper 8:1 to travel lane/paved shoulder? Min. Pavement Surface Course: _" � Existing Roadway: Pavement Marking: Thermoplastic or Paint Pavement Markers: RaisedlSwplowable/none Will Railroad Involvement Be Required: No Method of Clearing: � ;. ; ` Truck Percentage: 6% per BIR Reasonable Safe Speed per SIR: mph (from speed study) ,., � Liquidated damages: will be imposed after '_days of dosure/construction. Amt: $_ per day CEI by? NCDOT RIW by? DBT RM/ monuments? Conc. Salvageable materials: ' Contact Personlnumber: Deliver to: Removal of previous structure remnant abutments/piers: Sequencing priority in construction? Comments: Not on an evacuation route Structure No: 230313 4 of 5 ,G"�' 14 min ion„�.�4�s C.olumbus Coun�ty �ridge 2303 9 3 3977 Old Tram �,� _1� ��,���_ � �, �, n `d �; i Structure No: 230313 5 of5