Loading...
HomeMy WebLinkAboutWM0100443_Approval_20180803ROY COOPER coves [MICHAEL S. REGAN Ser 1-Y LINDA CULPEPPER lrtrfrfm a'recw Duke Energy Progress, LLC Attn: John Toepfer 410 S. Wilmington Street/NC15 Raleigh, NC 27601 NOqYH CAROLINA Errlrironmeretal Quality August 3, 2018 Re: Well Construction Permit WM0100443 Asheville Airport Area I Structural Fill Buncombe County Dear Mr. Toepfer, In accordance with your application received August 1, 2018, we are forwarding well construction permit WM0100443 dated August 3, 2018. The permit is for the construction of four monitoring wells and two piezometers on Greater Asheville Regional Airport Authority property as described in the application and the attached permit. The permit will be effective from the date of issuance for a period of one year and is subject to the conditions and limitations as specified therein. A Well Construction Record shall be completed and signed by the certified drilling contractor for each well. The forms shall be submitted to the Department upon completion of the wells and shall reference the applicable permit number. Please review the attached permit conditions. If you should have any questions or need additional information, contact Andrew Moore at 828-296- 4500. cc: ARO file Sincerely, G. Landon Davidson, P.G. Regional Supervisor Water Quality Regional Operations Section North Carolina Department of Environmental Quality I Division of Water Resources 2090 US 70 Highway, Swannanoa, NC 28778 828.296.4500