HomeMy WebLinkAboutWM0100443_Approval_20180803ROY COOPER
coves
[MICHAEL S. REGAN
Ser 1-Y
LINDA CULPEPPER
lrtrfrfm a'recw
Duke Energy Progress, LLC
Attn: John Toepfer
410 S. Wilmington Street/NC15
Raleigh, NC 27601
NOqYH CAROLINA
Errlrironmeretal Quality
August 3, 2018
Re: Well Construction Permit WM0100443
Asheville Airport Area I Structural Fill
Buncombe County
Dear Mr. Toepfer,
In accordance with your application received August 1, 2018, we are forwarding well construction
permit WM0100443 dated August 3, 2018. The permit is for the construction of four monitoring wells
and two piezometers on Greater Asheville Regional Airport Authority property as described in the
application and the attached permit.
The permit will be effective from the date of issuance for a period of one year and is subject to the
conditions and limitations as specified therein. A Well Construction Record shall be completed and
signed by the certified drilling contractor for each well. The forms shall be submitted to the Department
upon completion of the wells and shall reference the applicable permit number. Please review the
attached permit conditions.
If you should have any questions or need additional information, contact Andrew Moore at 828-296-
4500.
cc: ARO file
Sincerely,
G. Landon Davidson, P.G.
Regional Supervisor
Water Quality Regional Operations Section
North Carolina Department of Environmental Quality I Division of Water Resources
2090 US 70 Highway, Swannanoa, NC 28778
828.296.4500