HomeMy WebLinkAbout20180133 Ver 2_More Info Requested_20180307Strickland, Bev
From: Homewood, Sue
Sent: Wednesday, March 07, 2018 1:03 PM
To: phil.may@carolinaeco.com
Subject: RE: Triangle Tyre
Phil,
I have completed a first review of the Major Variance request for this project. At this time I offer these informal
comments. I will work on providing formal comments for both projects in the near future. In the meantime, please
forward any updated/new information/documentation, that may reduce the number of formal comments I send out.
will also be reviewing the document with Karen to see if she believes we need any additional information for the EMC
review, I'll let you know as soon possible.
• There are discrepancies between the narrative document and the plan sheets for the buffers. For example, site
3 is listed as "allowable with mitigation" in the narrative but "allowable" in the plan sheets. Please double check
all plan sheets against the narrative and correct as necessary.
• For Site #4, please identify impacts associated with the road crossing of the stream separately from parallel
impacts that occur as a result of the turn that the stream channel takes. Please call these out separately in both
the narrative and the plan sheet.
• For Site #5, the narrative notes that this impact is less than 1/3 acre however the impact table indicates that
23,002 square feet will be impacted which is greater than 1/3 acre.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Homewood, Sue
Sent: Wednesday, February 28, 2018 9:51 AM
To: 'phi 1.may@carolinaeco.com' <phi1.may@carolinaeco.com>
Subject: Triangle Tyre
Phil,
I've reviewed the IP application for Triangle Tyre. At this time I offer these "informal" comments. Once I review the
variance application I'll send you comments on that as well.
• As we discussed by phone yesterday, the amounts shown on the impact drawings do not match up with the
amounts listed in the table of impacts in the cover letter.
• Before we can issue a certification we will need: detailed design drawings/impact drawings; a detailed
stormwater plan for the roadway; a dewatering plan for the ponds.
• Have you received a buffer determination letter from RRO yet?
• Could you provide the NCWAM form for the isolated wetland, we need the wetland type to be clearly identified
(maybe add to the cover letter/impact table, or impact drawing)
• One of the streams is listed as a "tributary' rather than an intermittent or perennial stream. Can you clarify this
please
• I have concerns about the statement (in multiple places of the cover letter) about the road alignment that
indicates further avoidance/minimization would encroach upon uplands which may cause future impacts from
future development. This is speculative and I don't think it is beneficial to the A&M discussion of the road
alignment. I would suggest removing these statements or it may be possible to instead state that encroachment
into the uplands would limit the marketability/use of Pad C and cause a financial/growth/jobs burden to the
County.
Also, after speaking with Karen again, I gave you incorrect information about how to handle the buffer impacts. All the
buffer impacts except those that specifically require a variance should have been included in the IP application as a
buffer authorization request. The variance will cover only the impacts that trigger the variance. I'm certain I can review
everything I need in one or the other application so there's nothing that needs to be done at this point in time but I may
need you to tweak some of the documents/impact drawings as you submit new/additional information in the future.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood a-ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.