HomeMy WebLinkAbout20171134 Ver 1_Email_20180802 (2)Carpenter,Kristi From: Sent: To: Cc: Subject: Thank you Dave, Robinson, Stephen J Thursday, August 02, 2018 5:49 PM David.E.Bailey2@usace.army.mil; Sutton, Jeffrey M Kirkman, Christopher D; Walker, James M; Thomson, Nicole J; Parker, Jerry A; Whitley, Kimball; Harper, Aaron A; Norton, Apri) R Re: [External] RE: EXTERNAL: FW: Open diversion at pond road; Bridge 170 (B-5347) in Alamance Co We will relay this information. Thanks again for your quick assistance. Stephen Robinson, P.E. Senior Assistant Resident Engineer Division 7 District 1 336 570 6830 office sjrobinson@ncdot.gov 115 East Crescent Square Drive P. O. Box 766 Graham, NC 27253 NC State Seal Gold Email Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent: Thursday, August 2, 2018 5:13:58 PM To: Sutton, Jeffrey M; Robinson, Stephen J Cc: Kirkman, Christopher D; Walker, James M; Thomson, Nicole J; Parker, Jerry A; Whitley, Kimball; Harper, Aaron A; Norton, April R Subject: [External] RE: EXTERNAL: FW: Open diversion at pond road; Bridge 170 (B-5347) in Alamance Co CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.�ov> � In this case, as long as the diversion fits within the previously permitted footprint, the Corps authorization would still hold. Please note, however, that dewatering capacity has become problematic at other recent projects in Division 7, and the Corps is very concerned about providing enough dewatering capacity to pass the high flows that seem to occur frequently. Please ensure that the dewatering strategy that you employ is stable and takes all precautions to prevent "blowouts" and sediment loss while the project is under construction. Nikki and I spoke earlier today and she is aware of my concerns and can articulate them on site. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://na0l.safelinks.protection.outlook.com/?url=http%3A%2F%2Fcorpsmapu.usace. army.mil%2Fcm apex%2Ff%3Fp%3D136%3A4%3A0&amp;data=02%7C01%7Cslrobinson %40ncdot.�ov%7C61e964fbad4d44b4453408d5f8bfb094%7C7a7681dcb9d0449a85c3ec c26cd7ed19%7C0%7C1%7C636688424542323004&amp;sdata=wp568v1MhkYEFU ledn Mtwyww7CeSmFvPMuzx% 2Bqopl4w% 3D&amp;reserved=0 Thank you for taking the time to visit this site and complete the survey. -----Original Message----- From: Sutton, Jeffrey M [mailto:Jeff.Sutton@mbakerintl.com] Sent: Thursday, August 2, 2018 2:47 PM To: Robinson, Stephen J <sjrobinson@ncdot.gov> Cc: Kirkman, Christopher D<cdkirkman@ncdot.gov>; Walker, James M <jmwalker@ncdot.gov>; Thomson, Nicole J<njthomson2@ncdot.gov>; Parker, Jerry A <jparker@ncdot.gov>; Whitley, Kimball <kwhitley3@ncdot.gov>; Harper, Aaron A <aaharper@ncdot.gov>; Norton, April R<april.norton@ncdenr.gov>; Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Subject: [Non-DoD Source] Re: EXTERNAL: FW: Open diversion at pond road; Bridge 170 (B-5347) in Alamance Co AI I, This Monday at 9:OOam Mountain Creek is planning on switching the stream from its current location to the diversion pipe, if for some reason the weather effects this event we will reschedule the switch. Should you have any questions please contact me 336-420-6214. Thanks, Jeff Jeffrey Sutton Construction Inspections 336-420-6214 Michael Baker Engineering, Inc. a Michael Baker International Company jeff.sutton@mbakerintl.com <mailto:ieff.sutton@mbakerintl.com> <Blockedhttp://projects.mbakercorp.com/sigimg/MBI-email-sig-block-72dpi.png> On Aug 2, 2018, at 11:40 AM, Robinson, Stephen J<sjrobinson@ncdot.gov <mailto:sirobinson@ncdot.�ov> > wrote: Don/Ken, The revision to the diversion is approved contingent upon the information requested in the email below. I just want to reiterate that no matter how negligible or insignificant the changes might seem to the previously approved permit drawings and sequencing, any deviation from the approved permit/drawings/sequencing have to be reviewed and approved by the appropriate parties, which subsequently takes time and cannot be made in a matter of minutes. Please review the requested information and return as soon as possible to proceed. Please let us know if you have any questions. Thanks, Stephen Robinson, P.E. Senior Assistant Resident Engineer Division 7 District 1 336 570 6830 office sjrobinson@ncdot.gov <mailto:sirobinson@ncdot.�ov> 115 East Crescent Square Drive P. O. Box 766 Graham, NC 27253 <i mage001. png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Thomson, Nicole J Sent: Thursday, August 2, 2018 11:29 AM To: Robinson, Stephen J <sjrobinson@ncdot.gov <mailto:sirobinson@ncdot.�ov> >; Kirkman, Christopher D <cdkirkman@ncdot.gov <mailto:cdkirkman@ncdot.�ov> >; Ryan Olech <rolech@rkk.com <mailto:rolech@rkk.com> >; Walker, James M <jmwalker@ncdot.gov <mailto:imwalker@ncdot.�ov> >; Norton, April R <april.norton@ncdenr.gov <mailto:april.norton@ncdenr.�ov> >; David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> Cc: Whitley, Kimball <kwhitley3@ncdot.gov <mailto:kwhitley3@ncdot.�ov> >; Sutton, Jeffrey M <jeff.sutton@mbakerintl.com <mailto:ieff.sutton@mbakerintl.com> >; Parker, Jerry A <jparker@ncdot.gov <mailto:iparker@ncdot.�ov> > Subject: RE: Open diversion at pond road; Bridge 170 (B-5347) in Alamance Co Good morning everyone! I had the chance to speak with both April and Dave this morning (again, thank you both — I know your schedules are also exceedingly busy) and they both have given their blessing on this proposed change with the following caveats. 1) We need a revised/updated drawing that shows the proposed change and ensures that it falls within the currently approved/permitted limits (for both stream and riparian buffers); I strongly suggest having this area marked in the field with either staking and/or survey tape; 2) Revised sequencing language to narrate the change and the specific construction steps; 3) A typical is also shown of HOW the diversion channel will be designed; reminder—this design MUST adhere to NCDOTs Construction and Maintenance BMP manual. I mentioned yesterday Section 5.2.4 is where the specs can be found; 4) Confirmation from REU that they are also amenable to the proposed changes; 5) A meeting with either me or Jerry prior to switching the stream from its current location in the natural channel to the bypass device(s) to ensure proper installation and stability. Please remember that this is a live stream channel and therefore, it must be treated as such. It is critical that the bypass devices are in good working order and are capable and able to handle anticipated flows. I bring this up because of the recent (and continuous) 1 inch to 2 inch rainfalls we've been seeing lately. It is incumbent upon NCDOT and the contractors to ensure that the onsite flows are managed accordingly. And finally, please recognize that future changes/deviations from the approved plans will be processed in as timely a manner as can be done, however, I cannot predict the schedules and availability of the rest of the team members. Therefore, there needs to be an understanding that waiting until the "last minute" to request a change will not necessitate an emergency response from all parties (and I think it's only fair that everyone has ample time to review and comment as necessary). Thank you all — Please feel free to call me with any questions. Nikki Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.