HomeMy WebLinkAbout20171134 Ver 1_REVISED 08-02-2018 - MC393 Revised Construction Sequence & Water Handling Alamance Co PHASE II_2018080213' X 7' R C B C REVISED CON STRU CTI ON SEQU EN CE STA. 14+ 14 - L- TEMPORARY SANDBAG PHASE I WALL (MIN. 9' HEIGHT) 1. CONSTRUCT STILLING BASIN (MIN. VOLUME =129 CUBIC YARDS). 2. INSTALL SPECIAL STILLING BASINS. IMPERVIOUS DEWATERING 3. CONSTRUCT IMPERVIOUS DIKES (A AND B). DIKES A& B PUMP 4. BEGIN BY-PASS PUMPING AND DEWATER THE AREA BETWEEN DIKES A& B. � '\uF 5. WSTALL TEMPORARY 84"0 PIPE C IN THE STREAMBED. TEMPORARY MSE WALL �� , � SPECIAL STILLING BASINS ��� 6. OPEN-CUT TRENCH & WSTALI TEMPORARY 84"0 PIPE A. (MIN. 12' HE[GHT) �`��_c (SEE PROJECT SPECIAL 7. CONSIRUCT THE TEMPORARY MSE WALL TO A HEIGHT OF 12' MINIMUM & TEMPORARY PROVIS[ONS) SANDBAG WALL TO A HEIGHT OF 9' MINIMUM, BUILDING THE DETOUR FILL BETWEEN THE TDE. TDE— J `°E ,q •, �`�e� WALLS. i� � � r`_ 8. REMOVE IMPERVIOUS D[KES A& B TO ALLOW THE STREAM TO FLOW THROUGH PIPE C. E�«� Sl7LLING BAS]N � � (�Inl. 1;�3 r_1') I �'o� �i �' � C � �� A � � BY—PASS� PUMP �� ��«—�i�%d n,i�—:,�� ,,,��i�—�i �W »B" � _i�— M � —M� ��>'�k�-��/W—_� � '�` \ _ / �_ �{� , � R/lb�{+!y'—a/N 4/w-�'��-��Nr— _ _= - - — _ _ - - - - - - V - - — - - �— - - - - �— - - — - -J--- — - - — - � - - - _ � - - - - - - - --- - _ _ _ � / -- -- ---- -- _�-� __-—--—— —--- -- --—-—— ---_——�_'— —,— —=— -- _—__——-----�=___-- - ,.. � -rr,,�— �n/„�.n a,��—M�a---u��� _ % � / i `` , �`\ /r�u'��1^ � _/w�/w-�� � / `- \ �l`"-� �4� .�w����,� . - /�k— � � � ���' ��,..i�s`--�/w--�'/ ,/w--"/`�--T_/ � � � � �,LxLTII�ir. E,h'IG�� - / � i �\� -� � i � ` `�Q � // \ ` ' � I ' �, �_.r— � IMPERVIOUS PHASE II DIKE D 1. REMOVE PHASE I STILLING BAS1N. 2. CONSTRUCT ON-SITE DETOUR AND INSTALL TEMPORARY PIPES E AND F. COMPLETE TEMPORARY 3. SHIFT TRAFFIC ONTO DETOUR. SANDBAG WALL (FULL HEIGHT) � 4. [NSTALL TEMPORARY 84"0 PIPE D& OPEN CHANNEL DIVERSION USING 8MP 5.2.4. COMPLETE TEMPORARY MSE � �� 5. WSTALL IMPERVIOUS DIKES C& D, DIVERTWG STREAM FLOW THROUGH OPEN �r` CHANNEL DIVERSION AND PIPES D& A. WALL (FULL HEIGHT) �� ���, 6. CONSTRUCT AND UTILIZE SKIMMER BAS1N 4.18 AS NEEDED FOR DEWATERING. �J`� 7. REMOVE THE EXISTING BRIDGE. --r`�� °� \\�"-'< �Z��� PIPE E 8. CONSTRUCT THE SINGLE 13X7 RCBC INCLUDING THE WLET WINGS & OUTLET WWGS. J � Z��� PIPE F I ��� \ 9. CONSTRUCT PARTIAL BANK STABILIZATION ON THE WESTERN BANK AND ALL BANK �e� STABILIZATION ON THE EASTERN BANK AT THE WLET END OF THE CULVERT. �«'`� - \\, 10. REMOVE IMPERVIOUS DIKES C& D TURNWG STREAM FLOW THROUGH THE NEWLY / ��,,. ,t% - �� CONSTRUCTED CUIVERT & PIPE C. ,.�. �\ i — -- _ 'r � _ 4 � g-5347 � � � � '' � � �� �fi; PROJECT N0. , �,�--�„e—„a—�..�,,,�,d ,a— M ":���,,�—�,,�,� �, �' �� � �' � � � i�° � ,w— ��,�, �`� _,,�p �� p �,� �� �r � ALAMANCE COUNTY — ��, ° w —� .�,. —. t � <� �,�,�,. q '�'\ ����� STATION: � 4+14.00 —L— _ __------ ---—_ — _�_�' — \——-----—_ � � � � — �_—- -� - - , - - _ ��T -�"' __ �� � -- - - - -- - - -- -- - - -�_ — ---- - - �.� - - - - � �� _�_ � �� --- - — - —' % - __*-- - '� - ` __- STATE OF NORTH CAROLWA �� DEPARTMENT OF TRANSPORTATION -- , � - -------- � -----�- RALEIGH - »—��,—���,--.,��—,��. -�,e----Wa--��—« O i�� � - - — _, w- �M'�""������� � �� ' � ` � — CON STRU CTI ON sr����v�, � , , � ,�,�,.�,� , -�--�,�,���a,� Q a_;�-1 , �� ,�EA� �� � �-,�� �, �� - �,�/ ,��. ��m ,�o �,��,� ��,��,�,�Y SE U EN CE �' '�'„ '�� / ,`� -�� F�,� F�� --�� �, , � ' � --_ _ a y� � �>- ��,�F �` s� "�, , & P� —,���"��'�` � -- "" ��� �.�E _ s a��q .�"�_ � WATER HANDLING / - - � //"� - . �. ` MOL7NTe1IN CREEK � � \ - _ � - �,i,E _ / CONTRAGTORS, INC. � �,i�� 14869 �����u_ "'f'`:FNciNE`�� :��' Mountain Creek Conh<icturs, [nc. REVISIONS SHEET N0. / OPEN CHANNEL IMPERVIOUS � �'�'�'Friiw;F�`�'` c�,i W�d ric s�oy-v,?o � NO BY: DAIE: NO BV: DA7E: C-6A�CONST. DIVERSION DIKE C �"""����� '�. o� �o,a orf��.: �s�s� aai-zoa� � 3 �� REVISED 08/02/2018 - ADDED OPEN CHANNEL DIVERSION F�:(828)241-3643