Loading...
HomeMy WebLinkAbout20180814 Ver 1_More Info Received_20180802Y,eCd aP-It9 I? -agiL� 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ualiy list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: NIA 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number– Permanent (P) or T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet —Temporary B1 P Walk, dock,and abutments Buffalo Creek & Robertson's Pond No 502 2,147 B2 P Boat Launch Buffalo Creek & Robertson's Pond No 346 B3 P Mill Concrete pad Buffalo Creek & Robertson's Pond No 480 B4 T Construction Access Buffalo Creek & Robertson's Pond No 3.708 6,448 B5 P Permitted Phase I Walkway Buffalo Creek & Robertson's Pond No 80 176 B6 Yes/No 6h. Total Buffer Impacts: 5,116 8,771 6i. Comments: B1: permanent concrete nature Walks and two boardwalk abutments. B2: boat launch B3: mill concrete pad B4: Construction access to install improvements with adjacent areas re -vegetated; B5: Permitted Phase I permanent Impacts Page 5 of 10