Loading...
HomeMy WebLinkAbout19860070 Ver 1_COMPLETE FILE_19860101DEPARTMENT OF THE ARMY WILMINGTON DISTAIiCT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 IN REPLY REFER TO Regulatory Branch January 21, 1987 "It C, ' .?.' SUBJECT: File No. SAWC086-N-065-0526 Oh' N 2 IVA TER QUAI !TY OPERAtIONS Mr. G. H. Warriner, Manager, Environmental Services Carolina Power and Light Company Shearon Harris Energy and Environmental Center Route 1, Box 327 New Hill, North Carolina 27562 Dear Mr. Warriner: Reference your application for a Department of the Army permit to maintain an intake canal off the Cape Fear River at your Sutton Plant, west of Wrightsboro, New Hanover County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure I.- ' t -2- Copies Furnished with enclosure: Director, Atlantic Marine Center Ms. L. K. (Mike) Gantt National Ocean Service U.S. Fish and Wildlife Service ATTN• MOA 232X`1 Post Office Box 25039 439 West York Street Raleigh, North Carolina 27611-5039 Norfolk, Virginia 23510-1114 Mr. Randy Cheek Mr. William Mills National Marine Fisheries Water Quality Section Service, NOAA Division of Environmental Pivers Island Management Beaufort, North Carolina 28516 N rth Carolina Department of Natural Resources and Mr. Charles Jones Community Development Morehead City Regional Office Post Office Box 27687 North Carolina Division of Raleigh, North Carolina 27611-7687 Coastal Management Post Office Box 769 Mr. William L. Kruczynski, Chief Morehead City, North Carolina 28557 Wetlands Section Region IV Mr. C. Robert Stroud Marine and Estuarine Branch Wilmington Regional Office U.S. Environmental Protection Agency North Carolina Division of 345 Courtland Street Coastal Management Atlanta, Georgia 30365 7225 Wrightsville Avenue Wilmington, North Carolina 28403 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 ,t o •I ` isq ?'r RIVER tiORT?? P / L/r 1 1L1' Jxv JLx ? ? .. >ex r. ,. J ? nn ?( 1« i??r . I r«x J? r JJJ ?\ .•w+n•o•o ? ux T .or xr•r ? M,,,.? 1 m 4? r.u ??Vll -- ?? o Lrx ?? y r SITE r • TY "1 n , ?C •.Hl y WIVAINGTON \Lll 11• x. A .?.... - x• w wmn•n ? . u.o.H 1 rW W 3 _ x ' ? ? WfMM ,no •o. x.u• 1 v...c k ur, r?J z .I ?. % , ..rW 4 If /?7Jti / (CAROLJNA JIF.ACH rNL[T Enclosure 2 to ESS-86-1134 x.•xo• 1 a ? n ml ` c. riY1N ? 1VXN, ? . v 4?t ocM. 1MS I •Ox. 1111 4Q MAS?N Mtr 44 W4d f$VMIL MACH j • rer. to/ ? INaT f/ A V y Qr ?•GROIMU IkFACN 1 I \ ,vx ., ' rg pow. 1n WATER INTAKE CANAL MAINTENANCE DREDGING Il. AT SUTTON" PLANT LO CAT I 0 N MAP BY CAROLINA POWER 8 LIGHT CO. S,CAU 2 3 ?L w 4- 0 w n D r m m m z t O ? `• N r 1 w \ / L X vD L O om L \ O L OOD z r r 'fi m n / < XZ r O O O? L: x °_ v z_ ; ?v c ?o ... z v c F D L ~c '?DD m - ? NZr rn 0 OZ r Z •r zD a, Z Z ? ro O D n u) r o o* r n 7C x r v O z M r, G >m o 4 o Dv rn D Z m SD G) D r Z r' G) A 0 CAPE FEAR RIVER Z rn x ??, A? oza ox A* 2 D m 0 -4 Z M '{ m j PX , Y 4~ 2 ? vo 60 ° r z ? vz a o"N o zm I R ?z D? I °° I z PARKING _A v? c nr x? 0 z m rr N ? N C7 I 00 0- 0) N 1 C J J (D w .1A Lr c+ 0 s O i-3 M ct ' M 11{ a? r- N 10 O 07 r- i VN C N w w a r ? C7n ' ???nkV 41 ? k Or, 10 ;4 G? O0-t 1 /)y yyG ? k OC-)4-/ - Ot -Z -3 °C'+9 - o 0+ h 2 CO 5 vl 0 F- ~ O f- 00 N J V t1'1 jy? Q r ? Q ? Y tv LY :> ?' t9 Z ca w h - w Y` x v W < 2 Q \ 0 L) Q -i V 4j b b r am 4, o j -4 Cl) cn D v _. r M f 1 r. O o rl r I zo -0 F I °z iO Z ! n r m Cl) m In ( ` 0 n O ? Z 2 ° 11- o. y m r 1y c) rn N ?.. 10 m Eno ' ? Nz 0 m 0 -4 : ?m o *z?Z Z Z -? X aO Z m 0 Q D O° G) D r Zr -1 . n O O. 0 4 fe) rn x G in ?za a r m x n a z a r a rn N 0 0 r m m N J I C0 Ql N 1 C J (D 4:::- 4P 0 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 December 2, 1986 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWC086-N-065-0526 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: R E C I V E 101 8 0 8 1988 Reference the application of Carolina Power and Light Company, represented by Mr. G. H. Warriner, Manager Environmental Services, for a Department of the Army permit to maintain an intake canal off the Cape Fear River at the Sutton Plant, west of Wrightsboro, New Hanover County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. All excavated materials will be confined landward of the mean high water (MHW) elevation contour within adequate dikes or other retaining structures to prevent spillover of solids into any vegetated wetlands or surrounding waters. b. The terminal end of the pipeline from the dredge into the diked retention area will be positioned at or greater than 50 feet from any part of the dike and at a maximum distance from spillways to prevent dike erosion and to allow adequate settlement of suspended solids. c. A water control structure will be installed at the intake end of the effluent pipe leading from the retention area in order to ensure maximum settlement of suspended solids. d. Flow from the diked retention area will be confined by pipe, trough, or similar device to a point at or below the mean -2- low water (MLW) elevation contour to prevent gully erosion and resultant unnecessary siltation. e. Excavation will not exceed 6 feet below the elevation of mean low water (MLW). Questions or comments may be addressed to Ms. Alison Arnold, telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Copies Furnished: ,iRr. William Mills Mr. Randy Cheek ,'`Water Quality Section National Marine Fisheries Division of Environmental Service, NOAA Management Pivers Island North Carolina Department of Beaufort, North Carolina 28516 Natural Resources and Community Development Mr. William L. Kruczynski, Chief Post Office Box 27687 Wetlands Section Raleigh, North Carolina 27611-7687 Region IV Marine and Estuarine Branch Mr. Charles Jones U.S. Environmental Protection Agency Morehead City Regional Office 345 Courtland Street North Carolina Division of Atlanta, Georgia 30365 Coastal Management Post Office Box 769 Mr. C. Robert Stroud Morehead City, North Carolina 28557 Wilmington Regional Office North Carolina Division of Ms. L. K. (Mike) Gantt Coastal Management U.S. Fish and Wildlife Service 7225 Wrightsville Avenue Post Office Box 25039 Wilmington, North Carolina 28403 Raleigh, North Carolina 27611-5039 ?ir . DIVISION OF.BNVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comm?ents.concerving an applicatiioon;for State Federal CAMA Permit(s) from A. PERMIT: This office cannot comment on this project until after the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed projec with the following conditions : That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction- related discharge (increases of 25 NTU's or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased a by more than 10 NTU's as a.tesult of the proposed activity after a reason- :able opportunity for dilution and mix ture. B. CERTIFICATION STATUS: Certification is'not'required for this project. Certification is required for } -r this proJ*6t.--'$uch action to: process the certification has been initiated. Proposed Certification will be acted.pn r after The proposed project is.certified under General.Certification A) No. 1179 issued on January. 259 D) No. 1431 issued on October 16, 1977, for sewer line construction 1980, for boat ramp construction. B) No. 1272 issued on November 10, E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. No. 1273 issued on November 10, F) No. 1665 issued on September 19, 1978, for discharges of liquid 1983, for incidental bridge effluent from diked upland disposal construction. areas.. WATER QUALITY SECTION DIVISION OF ENVIRONMENTAL MANAGEMENT r MEMORANDUM DATE: TO: FROM: THROUGH: DIVISION OF ENVIRONMENTAL MANAGEMENT December 2, 1986 REC"'T Bill Mills Dr-U 0 4 y' Operations Branch WATER OLIA.Li-fy Dave Goodrich C, OPE[), ;vrd> < :.?;?! ^! < Wilmington Regional Office A. Preston Howard, Jr. Wilmington Regional Office SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Carolina Power and Light Co. - L.V. Sutton Steam Plant New Hanover County The applicant proposes to maintain the existing water intake canal tributary to the Cape Fear River, classified SC. The proposed project has been reviewed to determine impacts on water quality. The following comments are provided: 1. The project will require 401 Certification, but should meet the contidions for a General 401 Certification for the discharge of liquid effluent from diked.disposal area. 2. The project should not violate water quality standards. DG:kc cc: DCM - Bob Stroud WiRO CF M:? , r t OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name Carolina Power & Light Company - L.V. Sutton Steam Plant 2. Location of pproject site Cape Fear River North of Wilmington Man-Made Water Intake Canal. New Photo #12 A 145; Grid U- X, 16- 3. Investigation type: Dredge & Fill X CAMA No 4. Investigative procedure: (A) Dates of site visit 10/13/86 (B) Was applicant present Yes 5. Processing procedure: Application received mp a e10/24/86 Office DCM-Wilmington 6. Site description: (A) Local Land Use Plan Wilmington-New Hanover Count Land classification from LUP Rural Conservation Development constraints identified in LUP None for projects of this nature (B) AEC(s) involved: Ocean Hazard Estuarine shoreline Coastal wetlands Public trust waters Estuarine waters- Other (C) Water dependent: Yes X No Other (D) Intended use: Public Private X Commercial X (E) Type of waste water treatment: Existing N/A Planned NIA (F) Type of structures: Existing. Water Intake Pumps Planned N/A (G) Estimated annual rate of erosion N/A Source N/A 7. Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other NIA (B) (C) (D) Total area disturbed: Non-vegetated wetlands: Open Water appx. 90,000 s.f. Other: appx. 90,000 s.f. 8. Project summary The applicants propose to maintain the existing man-made water intake canal in order to provide adequate make up cooling water. CPI. Light Company Page 2 9. PROJECT DESCRIPTION: The project site is located at the L.V. Sutton steam electric plant. This plant is north of Wilmington between U.S. 421 and the Cape Fear River. In order to visit the property, arrangements should be made through Mr. Rob Liverman in Raleigh. His telephone number is (919) 836-7102. At best, the site is fairly inaccessible due to security gates and wooded swamp habitats. A review of the available photography indicates that the canal banks are relatively stable and lined with rip-rap material. The width of the existing canal bank to bank, ranges from approximately 801-1001. The length is approximately 1, 600' . Depths of the existing canal range from approximately -3.0' at the mouth to approximately -5' at the upper end. The river is classified as SC waters and is designated as a primary nursery area. The spoil disposal area is located on high ground on the plant site. Approximately 3.2 acres is available. The applicants propose to excavate the canal by means of a hydraulic dredge. The material will be pumped to the disposal site. The dimeratone given for the work are 1,600' long x 60' wide (top width) x -6' MLW. Approximately 18,000 cubic yards will be removed to the disposal site. Plans indicate that the disposal area effluent will be piped to the upper end of an existing creek within the wooded swamp area adjacent to the lower portion of the canal. 10: ANTICIPATED IMPACTS: If the project is completed as proposed no significant adverse impacts are anticipated. SUBMITTED BY: C. Robert Stroud, Jr. OFFICE: DCM-Wilmington DATE: 10-24-86 e>. a APPLICATION Enclosure 1 to ESS-86-1134a FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT Department of Administration State of North Carolina Department of the Army (GS 146.12) Department of Natural Resources and Community Development Corps of Engineers, wilmington District (GS 113-229,143-215.3(a)(1), 143-215.3(c), 113A-119 (33 CFR 209.320-329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Carolina Power & Light Co. - L. V. Sutton Steam Electric Plant Last First Middle B. Address P. 0. Box 1551 (General Office) Plant Address - Box 46, Wilmington. A.C. 28401 Street, P. O. Box or Route ontact: . revs Raleigh N.C. 27602 (919) 836-6045 City or Town State Zip Code Phone 11. Location of Proposed Project: A. County New Hanover 8. 1. City, town, community or landmark-_ Sutton Plant (See Enclosure 2 for location) 2. Is proposed work within city limits? Yes__No __4?_ C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Existing Water Intake Canal Off Of Cape Fear River 111. Description of Project See Enclosures 3 and 4 A. 1. Maintenance of existing project X 2. New work B. Purpose of excavation or fill SEP 12 08 1. Access channel length.width --depth 2. Boat basin length-width-dept FFICE OF COASTAL MANAGEMENI -,., 3. Fill area length . width-depth WIEW MUN REGIONAL OFFICE 4. Other Canal length 150W +width 60' depth 6'+ C. 1. Bulkhead length 4A Average distance waterward of MHW (shoreline)- - NA 2. Type of bulkhead construction (material) NA D. Excavated material (total for project) 1. Cubic yards 18.nnn+ 2. Type of material E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards Nonp 2. Type of material NA IV. Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X_ B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location High Ground Ad.iacent to_Proiect (See Enclosure 5)-- 2. Do you claim title to disposal area?_ Yes (See Enclosure _ D. Fill material source if fill is to be trucked in None E. How will excavated, material be entrapped and erosion controlled? Earth Dike Around Spoil Area And Holding Pond With Stilling Basins and Piped Spillway J. Type of equipment to be used _ Hydraulic Dredge G. Will marshland be crossed in transporting equipment to project site? If yes, explain No D& F-81 Rev to/70 V. intended Use of Project Area (Describe) A. 1. Private 2. Commercial Exi sting Water Intake Canal For Sutton Plant 3. Housing Development or Industrial - 4. Other B. 1. Lot siz 2. 3. 4ii 4. Elevation or lot(s) above mean high water - Soil type and texture NA NA OFFICE a1 r,IONAI OFFICE Type of building facilities or structures 1ipl?„AN 5. Sewage disposal and/or waste water treatment A. Existing NA Planned , B. Describe NA 6. 1Land Classification' (circle one) DEVELOPED TRANSITIONAL COMMUNITY RURA CONSERVATION OTHER (See CAMA Local Land Use Plan Synopsis) V'1. Pertaining to Fill and Water Quality: i- A. Does the proposed project involve the placement of fill materials below mean high water? Yes No B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the area following project completion? Yes X No ? A 2. Type of discharge Runoff From Holding Pnnd 3. Location of discharge Spa Fnelagurp S _% Present rate of siwWne erosion (if known)- NA 1f10 List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for work in project area, if applicable: SAWKS Permit Nos, 80-71 and 44-71 :Length of time required to complete project: ADDrox. 60 Days In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. ' B. Attach an accurate work plat drawn to scale on 8% X 11" white paper (see instruction booklet for - details). Note: Original drawings preferred - only high quality copies accepted. =.:r C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by publication (G.S. 113-229 (d))Enter date served -'? D. List names and complete addresses of the riparian landowners with property. adjoining applicant's. Such owners have 30 days in which to itibmit com en to agencies listed below. Srb None to 12-z t :. Certification requirement: I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved coastal management program and will be conducted in a =x manner consistent with such program. . --':X Any permit issued pursuant to this application will allow only the development described in this appli- cation and plat. Applicants should therefore describe in the application and plat all anticipated devel- opment activities, including construction, excavation, filling, and land clearing. ,.-=4 u Applicant's Signature r ?? s kl 1 Enclosure 2 to ESS-86-1134a 1 0i T - - -, . •- Faso 1•t .w SWAN O ?.«- -- r . : • / / user v . • ..., s ell y 7 w u.. ?/ IN SEP 1 OF[-ICE OF 2 1 r y J ?t / w1aMl,"'ON 4STAC MAN REG'GNA( OGEMENI 4STA WATER INTAKE CANAL MAINTENANCE DREDGING 1 AT SUTTON PLANT LOCATION MAP BY CAROLINA POWER 8 LIGHT CO. I I *- c O i-) M ? M GJ r- L .- ? 1 aA tp 0 00 ? 1 u N W W 00) - Lo 4p?-/ . Ot -Z _3 vO+ r nb'F-3 00+E - - i ..Lo-? °4. i 4b o y - la`1m OF COASTAL MANAGEMENT NGTON REGIONAL OFFICE do ll lb 0 , iG 00 -td1 jpk1• boo k? 9?•S-3 d?G?? .. 00--ti ?v k b? 41 6 b lD 2 r _ 0 n O ~ ? O F- ao N J V r o W C r F ? Y 1 v J t a. # N 1 W - Q V :Fe _j 0 a 0 i-) I-zr M 0 co V N W W x c D SEP 12 1986 OFFICE OF COASTAL MANAGEMENT WILMINGTON REGIONAL OFFICE . z O V . W V) W J J a Q N Q O ?? i Q V ? IL H .W • J d w V1 ' Z _O W N Q W cc Q a 1 NW J _Y J 0 O QO o c'? ?. a C V t<- C? _ J? 73 20 Vw W 3 CH O WWI a. (j _j 41 <ZtL _ ZZo 0 44 GCHQ Wz } 3?a m '1* . O iJ LO qdl M ? r i r N tp O 00 r I U N W W flN1?NVd ;s z = Z w 3 O .J ; _z Y ps s V i d. J I dl-iA/J/ d/d3j( 3d VO ZV W c Y? ? c dJ 0-1 x Z J W4 ? J Z40 N a t~A 3 1- . _.. 0 ?" °- x 0 • 'i •'? Z ?. 7 .r` 7 ?i W VA z e =Z I W J V h WOO W x 7 , ?'• \ SEP 12 1986 ??.. OFFI OF COASTAL NIANArpt IMI W.L ? ' l;l pF:ICE 0 JZ ZO W W Z w 49 U 2 QZd ZZo o ?- cc WZw aa?m 3?? a/° JAN. ?yT«•, Mean •? Our ?• State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor David W. Owens S. Thomas Rhodes, Secretary November 5, 1986 Director Mr. Charl liday, Deputy Directo State ilding Di .-State Propert fice De rtment of Adm istratio R leigh, North Carolina 27611 Dear Mr. Holliday: The attached copy of an application submitted by: CAROLINA POWER & LIGHT - L V SUTTON STEAM PLANT Applicant's Name Wilminntnn New Hanover Location of Project County Y_ for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit... for a CAMA major development permit (only) ... ... is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return it to me not later than 11-26-86 Sincerely, R. Parker, Jr., thief Major Permits Processing Section JRP:ap:2480 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 September 11, 1986 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. SAWC086-N-065-0526 Mr. G. H. Warriner, Manager, Environmental Services Carolina Power and Light Company Shearon Harris Energy and Environmental Center Route 1, Box 327 New Hill, North Carolina 27562 Dear Mr. Warriner: On February 6, 1986, we renewed general permit No. SAWC080-N- 000-0291 (enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received September 3, 1986, for a Department of the Army permit to maintain an intake canal off the Cape Fear River at your Sutton Plant, west of Wrightsboro, New Hanover County, North Carolina, indicates it to be a candidate for Federal authorization under this general permit. Accordingly, the administrative processing of your application will be accomplished by the North Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your applichtion must be withdrawn from this general permit process for any reason, you will be written and informed of its further management. If there are no unresolved differences of State-Federal positions or policy, the final action taken on your application by the State will result in your receiving written notice from us that your application has been successfully processed under our general permit. Only after receiving such confirmation should you begin work. . Your application, pursuant to Section 10 of the River and Harbor Act, has been assigned No. SAWC086-N-065-0526 and will be coordinated by Ms. Alison Arnold. She is available to address questions or comments you may have at telephone (919) 343-4634. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Pivers Island Beaufort, North Carolina 28516 Mr. William L. Kruczynski, Chief Wetlands Section Marine and Estuarine Branch U.S. Environmental Protection Agency 345 Courtland Street Atlanta, Georgia 30365 Mr. Charles Jones Mr. C. Robert Stroud Morehead City Regional Office Wilmington Regional Office North Carolina Division of North Carolina Division of Coastal Management Coastal Management Post Office Box 769 7225 Wrightsville Avenue Morehead City, North Carolina 28557 Wilmington, North Carolina 28403