Loading...
HomeMy WebLinkAbout20180994 Ver 1_401 Application_20180718ENVIRONMENTAL PROFESSIONALS, INC. Planning for a Better Environment P.O. Box 3368 Kill Devil Hills, NC 27948 Telephone: 252-441-0239 Fax: 252-441-0721 Email: obxwood@yahoo.com LETTER OF TRANSMITTAL TO: North Carolina Division of Water Resources 401 Wetlands Unit Attn: Nis. Karen Higgins 1650 Mail Service Center Raleigh, NC 27699-1650 SAID DATE: JOB NO. RE: * ATTACHED 201 80 984 July 11, 2018 018 -018 -PT Carova Beach Volunteer Fire Department & Rescue Squad COPIES DATE DESCRIPTION OF DOCUMENTS 4 7-11-18 Signed/Dated Pre -Construction Notification Form 4 1-15-15 Signed/Dated Authorization to Act As Representative Form 4 7-11-18 Letter to The Great Dismal Swamp Restoration Bank- Request for Confirmation of Acceptance of Mitigation Credits 4 2-5-15 U.S. Fish & Wildlife Service - National Wetlands Inventory 4 7-10-15 Notification of Jurisdictional Determination 4 2-2-19-10 North Carolina General Warranty Deed 4 6-28-18 Site Plan THESE ARE SUBMITTED AS CHECKED BELOW: For your approval Review & Comment -, For your use Signature/Notarization n As requested REMARKS: COPY TO: Project File Clearview Tower Company/Attn: Mr. Tom Gomprecht SIGNED:— GeVYge H. Wood, CEP, PWS Environmental Professionals, Inc. o� F wnrF9oc 7 y G < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps:X❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes NX No 1 d. Type(s) of approval sought from the DWQ (check all that apply): Z 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express N Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes N No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. n Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Carova Beach Volunteer Fire Department & Rescue Squad 2b. County: Currituck County 2c. Nearest municipality / town: Carova 2d. Subdivision name: Lot 10 - Lewark-Bender 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Carova Beach Volunteer Fire Department & Rescue Squad, Inc. 3b. Deed Book and Page No. 1116/765-767 3c. Responsible Party (for LLC if applicable): Mark Miller 3d. Street address: 2619 Ocean Pearl Road 3e. City, state, zip: Corolla, NC 27927 3f. Telephone no.: 757-358-6085 3g. Fax no.: N/A 3h. Email address: mmiller@kelleramerica.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: George H. Wood, CEP, PWS 5b. Business name (if applicable): Environmental Professionals, Inc. 5c. Street address: 1404 S. Virginia Dare Trail 5d. City, state, zip: Kill Devil Hills, NC 27948 5e. Telephone no.: Office: 252-441-0239 Cell: 252-423-1234 5f. Fax no.: - 5g. Email address: obxwood@yahoo.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 101600000100000 1 b. Site coordinates (in decimal degrees): Latitude: 36.4346 Longitude: -75.8439 1c. Property size: +/-3.16 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Atlantic Ocean 2b. Water Quality Classification of nearest receiving water: SC 2c. River basin: Pasquotank 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undeveloped vegetated dune/swale Residential in vicinity 3b. List the total estimated acreage of all existing wetlands on the property: +/- 1.5 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: Access to western ridge for construction of cell tower and the eastern part to house the fire and rescue department. 3e. Describe the overall project in detail, including the type of equipment to be used: The sand dune will be leveled to fill the wetlands for access. A culvert will be installed to "connect" the wetland areas. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? X❑ Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): George H. Wood, PWS Agency/Consultant Company: Environmental Professionals, Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. July 10, 2015 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. N/A Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): X❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Hardwood Flat Yes Corps 0.15 W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.15 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one - S5 Choose one S6 - Choose one - 3h. Total stream and tributary impacts 0 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. Wetland Impacts (acres) Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet 131 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 0 0 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The road crossing was designed to cross the narrowest area of wetlands and yet allow for the upland development. The large dunes have been avoided to prevent destabilization and siltation into wetland areas. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Road width limited to top width of 12 feet necessary for machinery to access cell tower site for construction and maintenance. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes ❑ No 2b. If yes, mitigation is required by (check all that apply):X❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? Q Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: The Great Dismal Swamp Restoration Bank 3b. Credits Purchased (attach receipt and letter) Type: Non -riparian wetland Type: Choose one Type: Choose one Quantity: 0.30 Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes [X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified Yes QX No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. N/A Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 10% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑x No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Below threshold 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: N/A 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Currituck County ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs El USMP apply (check all that apply): [] Water Supply Watershed E] Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes FX No attached? 4. DWQ Stormwater Program Review ElCoastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply nORW (check all that apply): ❑Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been E] Yes XD No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes E] No Page 8 of 10 PCN Form — Version 1.4 January 2009 . 4 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes X❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes Q No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes 0 No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes X❑ No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. On-site wastewater ground absorption Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act 0 Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? web page 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes X❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No open water impact 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? web page 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Elevated above BFE 8c. What source(s) did you use to make the floodplain determination? surveyor George H. Wood, CEP, PWS July 11, 2018 Applicant/Agent's Printed Name licant/Agent's Signature Date (Agent's ignature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 AUTHORIZATION TO ACT AS REPRESENTATIVE FORM Landowner of record authorizes Environmental Professionals, Inc. to: i. enter the property to gather environmental and site information, including delineation of environmental regulatory jurisdictions; 2. enter the site with the regulatory agencies (i.e. U.S. Army Corps of Engineers, North Carolina Division of Coastal Management, North Carolina Division of Water Quality, etc.) as needed to review regulatory alignment(s) and/or to identify additional regulatory jurisdictions; 3. submit plats and other information to acquire regulatory agency confirmations, approvals, and/or determinations (U.S. Army Corps of Engineers, North Carolina Division of Coastal Management, North Carolina Division of Water Quality, etc.); and 4. act as agent for the purposes of obtaining environmental permits, authorizations, and/or determinations. 6JkvV,9 �Wo- esc"f -T vc- Landowner � // / �WE/ S-21 -- s d - Date /V1 Date E.V'VIR0N'%E1T,U I'ROFESSIQVALS 1V PLANNING FOR A sETIER ENVIRONMENT July 11, 2018 The Great Dismal Swamp Restoration Bank, LLC Attn: Ms. Beverly White P.O. Box 6186 Chesapeake, VA 23323 Dear Ms. White, This letter is to request confirmation of acceptance for the Carova Beach Volunteer Fire Department application for proposed impacts to wetlands to the eastern half of Lot 10, Lewark-Bender. Corps' Project Number: Waterway: Permittee's Name: Location of Impact: Permit Action: Impacts (Acres/Linear Feet): Impact NWI Classification: Impact Hydrologic Unit Code: Anticipated Mitigation: Application Pending Non -Riparian Carova Beach Volunteer Fire Department Eastern Half Lot 10, Lewark-Bender, Carova Beach, Currituck County, North Carolina Nationwide #14 0.15 Acres PS83A Pasquotank 03010205 0.30 Acres Thank you for providing a letter of acceptance for these proposed impacts. Sincerely, Environmental Professionals, Inc. George H. Wood, CEP, PWS P.O. BOX 3368 - KILL DEVIL HILLS, NORTH CAROLINA 27948 TELEPHONE: 252-4414)239 - FAX: 252-441-0721 - EMAIL: obxwoodWyahoo.com VhU.S. Fish "� � • Wildlife Service Carova Beach Vol. NFire National Wetlands Invento Feb 5, 2015 as • : ,.` ^r Wetlands Freshwater Emergent r+ Freshwater ForestedlShrub ,� ; t 3, • * - Estuarine and Marine Deepwater Estuanne and Marine Freshwater Pond -'Ei,ti ret t*. Lake t -., Riverine •� Other l EEM IN gLgL e This map Is for general reference only. The US Fish and Wildlife Service is not responsible for the aecuracy or currentness of the base data shown on this map. All watlands related data should be used in accordance with the layer metadata found on User Remarks: the Wetlands Mapper wab site, IN U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2015-01012 County: Currituck U.S.G.S. Quad: VA-KNOTTS ISLAND NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Corova Beach Volunteer Fire Department and Rescue Squad Attn: Mark Miller Address: 2619 Ocean Pearl Road Corolla, NC 27927 u Telephone Number: Size (acres) Nearest Waterway USGS HUC Location description: 757-358-6085 3.16 (1.5 acres wetland) Atlantic Ocean 03010205 Indicate Which of the Followine ADDIV: A. Preliminary Determination Nearest Town Corolla River Basin Albemarle Coordinates Latitude: 36.5496593 Longitude: -75.8761869 _ Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area . We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination _ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 10 July 2015. Unless there is a change in the law or our Page 1 of 2 published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Chester Bigelow at 910-251-4595 or Chester.C.Bicelow(& usace. a rmy. m il. C. Basis For Determination: This site exhibits all three wetland criteria as described in the 1987 Corps Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Regional Supplement to the 1987 Wetland Delineation Manual and is adjacent to relatively permanent waters of the Albemarle Sound and the Atlantic Ocean. D. Remarks: None E. Attention USDA Program Participants This del ineation/determ i nation has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 8 September 2015. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. * * Digitally signed by BIGELOW.CHESTER.CHARLES.111.120575435I BIGELOW.CHESTER.CHARLES.111.120 DN. --US.-U.S. G—nmen1. ou=DD, — PKI, —USA, 5754357 _111GELOW.CHESTER.CHARLES.111. 12057543 57 Corps Regulatory Official: Date: 2015.07.1016:00R3 0401y Date: 10 July 2015 Expiration Date: 09 July 2020 BOOK 1 1.1 6 PAGE 0765 �O ^ Doe ID: 002214170009 Tv2M6 4P + Recorded: 02/28/2010 at 12:44:49 Ph /jtj Fee Amt::1,823.00 Papa i of 3 J/ Excise Tax: 5900.00 currltuek County, NC Charlene Y Doudv Register of Deeds SK 16 p�765-767 Excise'rax: 11 ax: S �n . V� ' Recording Time, Book and Page: Parcel No: 101 R-000-0010 00 Mail after recording to:ttmsey and Brumsey, PLLC, P.O. Box 100, Currituck, NC 27929 - - - - -- --------------------- - ---- ----- This --- This instrument was prepared bv�. William Brumsey, Ill/tjj File No: 1OB41682 -- - - ---- - - ------_. ---------- Brief ------- Brief Description for Index: Fruitville Township NORTH CAROLINA GENERAL WARRANTY DEED This DEED, made this 19th *1�bf February 2010 by and between GRANTOR �• GRANTEE GLENN MORRIS LEWARK, unmarried �• CAROVA BEACH VOLUNTEER FIRE DEPARTMENT AND RESCUE SQUAD, INC. y> (Trading as Carovs Beach Volunteer Fire and Rescue) 2619 Ocean Pearl Road Corolla, NC 27927 Enter in appropriate block for each party: name, address, and, if appate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said �arties, their heirs, successors and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grant a receipt of all of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the said Grant in fee simple, all that certain lot or parcel of land situated in the City of, Fr ultville Township, Currituck County, North Carolina, morecularly described as follows: SEE ATTACHED EXHIBIT A VIC, Y• All ora portion ofthe property herein conveyed_ includes or X does not include �nmary residence of a Grantor. Y This instrument prepared by: William Brumsey, III, a licensed North Carolina attorney. Delinquent taxes, if any, to be paid by the closing attorney to the County tax collector upon disbursement of closing proceeds. 16 0 TRANSFER TAX AMO / 50 O "moi l DATE/COLLECTOR BOOR 1116 Page 765 SAND TRAVELWAY DETAIL NO' '0 SCA"