Due to high water levels the contractor on Onslow 134 is requesting approval to drive
temporary sheeting in wetlands on EB 2 for the construction of the cap for the
temporary detour. The cap is 35 ft. long so the sheeting will need to be 45 ft. in length
and will be angled back into the temporary fill on the South side and existing roadway
fill on the North side as shown on the attached figures The sheeting will placed at the
hand clearing limits and will remain in place until the temporary detour is removed. The
temporary impacts will be approximately 0.003 acres and will not change the projects
overall existing authorized impacts.
Please let me know if we can approved this under a field adjustment or if we need to go
through a formal permit modification request. The contractor is currently on hold until
we can get this approved. The project is authorized under USACE AI is SAW 2017-02381
and the DWR No. is 2017-02381.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,