Loading...
HomeMy WebLinkAbout20090266 Ver 5_401 Application_20180727Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 7/27/2018 3:17:19 PM (Start Event) Accept by Montalvo, Sheri A 7/31/2018 1:32:50 PM (Non DOT Initial Review) • The task was assigned to Montalvo, Sheri A. The due date is: August 1, 2018 5:00 PM 7/27/2018 3:18 PM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Pitt Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) V Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 03 - Maintenance NWP Number Other: List all MN nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply F- 401 Water Quality Certification - Regular V 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: f Yes r No For the record only for Corps Permit: r Yes r No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program f Yes C No 1f. Is the project located in anyof NC's twentycoastal counties?* r Yes C No 1h. Is the project located in a designated trout watershed?* f Yes f• No Link to trout information: http://vmw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Julus Patrick 1b. Primary Contact Email:* patricje@guc.com 1c. Primary Contact Phone:* (xxx)xxx-xxxx (525)551-1561 1d. Who is applying for the permit? V Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Greenville Utilities Commission (GUC) 2b. Deed book and page no.: Deed Book J43, Page 229 2c. Responsible party: (for Corporations) Greenville Utilities Commission (GUC 2d. Address Street Address 801 Mumford Road Address Line 2 PO Box 1847 city Greenville fbstal / Zip Code 27835 2e. Telephone Number: (XXX)XXX-)O= 2f. Fax Number: (XXX)XXX-)O= 2g. Email Address:* patricje@guc.com State / Province/ Legion NC Country United States C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* GUC Raw water intake maintenance dredging 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: * Greenville 1d. Driving directions* If it is a new project and can not easily be found in a GPS crapping system Please provide directions. Project located behind Greenville Utilities Water Treatment Plant. Use 1760 Old River Road in GPS system 2. Project Identification 2a. Property Identification Number: (tax PIN or parcel ID) 3 parcels: 4679512348; 4679518588; 4675417259 2b. Property size: (in acres) 45.47 2c. Project Address Street Address Address Line 2 City Fbstal / Zip Code State / Province / Fbgion (buntry 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.635894 -77.401244 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Tar River 3b. Water Resources Classification of nearest receiving water:* Class WS4\/ NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Tar -Pamlico River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing site is a 22.5 MGD Water Treatment Facility. Surrounding areas are forested riparian buffer, forested cypress wetland and previously disturbed wetland. GUC currently has 8 intake screens in the Tar River that have become partially covered by river sediment. The GUC Raw Water Intake facility is located on the bank of the river. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) click the upload button or drag and drop files here to attach document Project Topography.pdf File type must be pdf 249.13KB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) (lick the upload button or drag and drop files here to attach docurrent 20180725_14140502661_38_Soil_Map.pdf 506.16KB File type mist be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 1.86 4e. List the total estimated linear feet of all existing streams on the property: (internittent and perennial) 1,900 4f. Explain the purpose of the proposed project:* The proposed project will remove the sediment that has accumulated on and around the screens to restore full operational capacity of our intakes to ensure GUC has the ability to supply adequate supply of water to customers for consumption and fire flow protection. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The area to be dredged is between is between the two intakes. GUC had a diver to inspect and repair screens last month to the downstream intakes . The damage was caused by sediment blocking more than half of the screen causing higher pressures when backflushing. Partially cover screen impacts water flow to the treatment process. The diver found the sand bar across from intake 2 is partially covering the intakes. Dredging will begin in this area then move towards intake 1. Proposed methods are either hydraulic dredge or mechanical dredge. Hydraulic dredge discharge pipe will transport Tar River sediment to spoils area located approximately 400 ft. from Tar River. The spoils area has an eight inch overflow pipe to capture any decant to prevent overflow of spoils area. Any decant that enters the pipe flows back to the raw water pump station wetwell. The water in the wetwell is pumped into the Pre -settling impoundment and sent through the treatment process. Water levels never reached the overflow pipe in previous dredging project due to the surface area of the spoils area being adequate to hold discharge. Mechanical dredge -sediment will be excavated from River either by long reach excavator or excavator on a barge and loaded onto a off road dump truck where sediment will be transported to spoils area. Neither method will impact Tar River or wetlands. A Request for Bid will be sent out once GUC receive approval from DWQ. 4h. Please upload project drawings for the proposed project. click the upload button or drag and drop files here to attach document Drawings and proposed dredge area.pdf 338.44KB File type must be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: No wetlands will be impacted by this project 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Unknown r N/A Corps AID Number: Exarrple: SAW -2017-99999 SAW -2009-00541 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Abby Rokosch Agency/Consultant Company: Brown and Caldwell Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Documentation was sent to Josh Pelletier in November 2008 and is included in the attachments of this document. 5d1. Jurisdictional determination upload Click the upload button or drag and drop files here to attach docurrent Wetland Delineation.pdf 3.72MB Jurisdictional Delineation Map.pdf 578.58KB File type mist be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* f• Yes f No f Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000). Permits have been obtained for previous dredge operations, as well as construction of the Raw Water Pump Station and later improvements. See attachment. In addition in 2016 GUC completed a PCN application for maintenance dredging , SAW -2016-01379, requesting utilization of Nationwide Permit (NWP) 3 for maintenance of intake structures to the Greenville Utilities Commission Water Treatment Plant on Old River Road. An extension was granted from the Army Corps of Engineers, Kyle Barnes, in May 2017. Project History Upload Click the upload button or drag and drop files here to attach document Previous Permit information.pdf 2.72MB File type rrust be FDF 7. Future Project Plans 7a. Is this a phased project?* f Yes R No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F- Wetlands V Streams -tributaries r-' Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. ......... .... ........... .... .... ..... 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name* 3e. Stream 3f. Type of 3g. Stream 3h. Impact type* Type* Jurisdiction* width* length* S1 Dredging river P Excavation Tar River Perennial Corps 40 300 1 N/hp label (e.g. Fbad Qossing Perrrenent (P) or Perennial (Pei or Average (linear feet) 2 1) Tenporary (T) intermttent (INT) (feet) 0 0 0 ** All Perennial or Intermittent streams must be verified by DWR or delegated local government 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 300 31. Total temporary stream impacts: 0 3i. Total stream and tributary impacts: 300 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Iowa vanes, while not totally successful in keeping our screens free of sediment, do appear to have reduced the frequency that in stream dredging is required. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Annual inspections and using divers to hand vacuum around screens to minimize sediment buildup around screens and monitor river sediment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Excavation of sediment from Tar River will be moved to spoils area. No wetland will be impacted F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 6 Yes r No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r- Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diff us Flow Documentation dick the upload button or drag and drop files here to attach docurrent D-1077 - GUC WTP Erosion Control Plan - Signed.pdf 1.68MB File type rrust be FDF 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes f No To look up low density requirement click here 15A NCAC 02H.1003(2) G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* f Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)? f Yes r No 2b. Is this an after -the -fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes r No 3b. If you answered "no," provide a short narrative description. This is for maintenance dredging of intakes only to restore full operational capacity 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes f No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? f Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? f Yes r No 5g. Does this project involve bridge maintenance or removal? f Yes r No f Unknown Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? f Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina Natural Heritage Program and the NC USFWS web service. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No Are there submerged aquatic vegetation (SAV) around the project vicinity?* r Yes f No r Unknown 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? North Carolina Natural Heritage Program and the NC USFWS web service. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docurrent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https:Hmsc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: This project will not create any new structures in the floodplain. 8c. What source(s) did you use to make the floodplain determination?* NC Floodplain information system Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent NCDEQ - ESC Approval Letter.pdf 2.41 MB File nest be FDF or KW Signature IJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Julius Patrick Signature a71WIA d C-�Qz i tib Date Submitted: 7/27/2018 Initial Review Is this project a public transportation project? * (? r Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process?* r Yes f No BIMS # Assigned * 20090266 Version#* 5 Reviewing Office* Washington Regional Office - (252) 946-6481 Select Project Reviewer* Robert Tankard: eads\rbtankard Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed?* f $240.00 r $570.00